메뉴 건너뛰기




Volumn 123, Issue 3, 2000, Pages 453-472

Computational analysis of a flexible assembly system design problem

Author keywords

[No Author keywords available]

Indexed keywords

ALGORITHMS; ASSEMBLY; COMPUTATIONAL COMPLEXITY; HEURISTIC METHODS; OPERATIONS RESEARCH; PROBLEM SOLVING; PRODUCTIVITY;

EID: 0033737075     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0377-2217(99)00104-6     Document Type: Article
Times cited : (6)

References (24)
  • 2
    • 0022794511 scopus 로고
    • A branch and bound approach for machine load balancing in flexible manufacturing systems
    • Berrada M., Stecke K.E. A branch and bound approach for machine load balancing in flexible manufacturing systems. Management Science. 32(10):1986;1316-1335.
    • (1986) Management Science , vol.32 , Issue.10 , pp. 1316-1335
    • Berrada, M.1    Stecke, K.E.2
  • 3
    • 0022757590 scopus 로고
    • Flexible manufacturing systems: A review of analytical models
    • Buzacott J.A., Yao D.D. Flexible manufacturing systems: A review of analytical models. Management Science. 32(7):1986;890-905.
    • (1986) Management Science , vol.32 , Issue.7 , pp. 890-905
    • Buzacott, J.A.1    Yao, D.D.2
  • 4
    • 21844516629 scopus 로고
    • A Lagrangian relax-and-cut approach for the sequential ordering problem with precedence relationships
    • Escudero L.F., Guignard M., Malik K. A Lagrangian relax-and-cut approach for the sequential ordering problem with precedence relationships. Annals of Operations Research. 50:1994;219-237.
    • (1994) Annals of Operations Research , vol.50 , pp. 219-237
    • Escudero, L.F.1    Guignard, M.2    Malik, K.3
  • 8
    • 84990623219 scopus 로고
    • Integrative cycle scheduling approach for a capacitated flexible assembly system
    • Kim D., Mabert V., Pinto P. Integrative cycle scheduling approach for a capacitated flexible assembly system. Decision Sciences. 24(1):1993;126-147.
    • (1993) Decision Sciences , vol.24 , Issue.1 , pp. 126-147
    • Kim, D.1    Mabert, V.2    Pinto, P.3
  • 10
    • 0022160824 scopus 로고
    • Flexible manufacturing systems: A structural approach
    • Kusiak A. Flexible manufacturing systems: A structural approach. International Journal of Production Research. 23 (6):1985;1057-1073.
    • (1985) International Journal of Production Research , vol.236 , pp. 1057-1073
    • Kusiak, A.1
  • 11
    • 0028413382 scopus 로고
    • Mathematical modelling of a loading problem in flexible assembly systems
    • Lashkari R.S., Duan M. Mathematical modelling of a loading problem in flexible assembly systems. Computers and Industrial Engineering. 26(2):1994;243-251.
    • (1994) Computers and Industrial Engineering , vol.26 , Issue.2 , pp. 243-251
    • Lashkari, R.S.1    Duan, M.2
  • 13
    • 0023643557 scopus 로고
    • Production batch sizes in a repetitive flexible assembly system
    • Mabert V.A., Pinto P. Production batch sizes in a repetitive flexible assembly system. Production and Inventory Management. 28(3):1987;34-38.
    • (1987) Production and Inventory Management , vol.28 , Issue.3 , pp. 34-38
    • Mabert, V.A.1    Pinto, P.2
  • 14
    • 0026238769 scopus 로고
    • A multiple criteria decision making approach for the assembly line balancing problem
    • Malakooti B. A multiple criteria decision making approach for the assembly line balancing problem. International Journal of Production Research. 29(10):1991;1979-2001.
    • (1991) International Journal of Production Research , vol.29 , Issue.10 , pp. 1979-2001
    • Malakooti, B.1
  • 17
    • 0026820502 scopus 로고
    • The relationship of work-in-process inventories, manufacturing lead times and waiting line analysis
    • Rao S.S. The relationship of work-in-process inventories, manufacturing lead times and waiting line analysis. International Journal of Production Economics. 26(1/3):1992;221-227.
    • (1992) International Journal of Production Economics , vol.26 , Issue.1-3 , pp. 221-227
    • Rao, S.S.1
  • 18
    • 0002986901 scopus 로고
    • Manufacturing - Missing link in corporate strategy
    • Skinner W. Manufacturing - missing link in corporate strategy. Harvard Business Review. 5:1969;136-145.
    • (1969) Harvard Business Review , vol.5 , pp. 136-145
    • Skinner, W.1
  • 20
    • 34250111322 scopus 로고
    • Design, planning, scheduling, and control problems of flexible manufacturing systems
    • Stecke K.E. Design, planning, scheduling, and control problems of flexible manufacturing systems. Annals of Operations Research. 3:1985;3-12.
    • (1985) Annals of Operations Research , vol.3 , pp. 3-12
    • Stecke, K.E.1
  • 23
    • 0000984413 scopus 로고
    • Manufacturing strategy: Its assessment and practice
    • Swamidass P. Manufacturing strategy: Its assessment and practice. Journal of Operations Management. 6(4):1986;471-484.
    • (1986) Journal of Operations Management , vol.6 , Issue.4 , pp. 471-484
    • Swamidass, P.1
  • 24
    • 0024769909 scopus 로고
    • Flexible systems: A configuration control challenge
    • Tavora C. Flexible systems: A configuration control challenge. Manufacturing Systems. 7(11):1989;34-40.
    • (1989) Manufacturing Systems , vol.7 , Issue.11 , pp. 34-40
    • Tavora, C.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.