-
1
-
-
0010584563
-
Four methods for maintenance scheduling
-
In Smith, G. D., Steele, N. C. and Albrecht, R., editorsArtificial neural nets and genetic algorithms, Proceedings of Third International Conference in Norwich (ICANNGA '97). Vienna: Springer-Verlag, Vienna
-
Burke, K. B., Clarke, J. A. and Smith, A. J. 1998: Four methods for maintenance scheduling. In Smith, G. D., Steele, N. C. and Albrecht, R., editors. Artificial neural nets and genetic algorithms, Proceedings of Third International Conference in Norwich (ICANNGA '97). Vienna: Springer-Verlag, Vienna, 265-270.
-
(1998)
, pp. 265-270
-
-
Burke, K.B.1
Clarke, J.A.2
Smith, A.J.3
-
3
-
-
0012144160
-
Generator maintenance scheduling using a genetic algorithm with a fuzzy evaluation function
-
Dahal, K. P., Aldridge, C. J. and McDonald, J. R. 1999: Generator maintenance scheduling using a genetic algorithm with a fuzzy evaluation function. Fuzzy Sets and Systems 102, 21-29.
-
(1999)
Fuzzy Sets and Systems
, vol.102
, pp. 21-29
-
-
Dahal, K.P.1
Aldridge, C.J.2
McDonald, J.R.3
-
5
-
-
0002087277
-
Simulated annealing
-
In Reeves, C. R., editor Oxford: Blackwell Scientific Publications
-
Downsland, K. A. 1993: Simulated annealing. In Reeves, C. R., editor, Modern heuristic techniques for combinatorial problems. Oxford: Blackwell Scientific Publications, 20-69.
-
(1993)
Modern heuristic techniques for combinatorial problems
, pp. 20-69
-
-
Downsland, K.A.1
-
6
-
-
0016990741
-
An experimental method of determination of optimal maintenance schedules in power systems using branch-and-bound technique
-
Egan, G. T., Dillon, T. S. and Morsztyn, K. 1976: An experimental method of determination of optimal maintenance schedules in power systems using branch-and-bound technique. IEEE Transactions on Systems, Man and Cybernetics SMC-6, 538-547.
-
(1976)
IEEE Transactions on Systems, Man and Cybernetics
, vol.SMC-6
, pp. 538-547
-
-
Egan, G.T.1
Dillon, T.S.2
Morsztyn, K.3
-
7
-
-
0005868488
-
A method for maintenaance scheduling using GA combined with SA
-
Kim, H., Nara, K. and Gen, M. 1994: A method for maintenaance scheduling using GA combined with SA. Computers and Industrial Engineering 27, 477-480.
-
(1994)
Computers and Industrial Engineering
, vol.27
, pp. 477-480
-
-
Kim, H.1
Nara, K.2
Gen, M.3
-
8
-
-
0031996650
-
Evolutionary computation in power systems
-
Miranda, V., Srinivasan, D. and Proenca, L. M. 1998: Evolutionary computation in power systems. Electrical Power & Energy Systems 20, 89-98.
-
(1998)
Electrical Power & Energy Systems
, vol.20
, pp. 89-98
-
-
Miranda, V.1
Srinivasan, D.2
Proenca, L.M.3
-
10
-
-
0002839560
-
Genetic algorithms
-
In Reeves, C. R., editor Oxford: Blackwell Scientific Publications
-
Reeves, C. R. 1993: Genetic algorithms. In Reeves, C. R., editor, Modern heuristic techniques for combinatorial problems. Oxford: Blackwell Scientific Publications, 151-196.
-
(1993)
Modern heuristic techniques for combinatorial problems
, pp. 151-196
-
-
Reeves, C.R.1
-
11
-
-
0026153980
-
Maintenance scheduling by using simulated annealing method
-
Satoh, T. and Nara, K. 1991: Maintenance scheduling by using simulated annealing method. IEEE Transactions on Power Systems 6, 850-857.
-
(1991)
IEEE Transactions on Power Systems
, vol.6
, pp. 850-857
-
-
Satoh, T.1
Nara, K.2
-
12
-
-
0029493242
-
Solving power system optimization problems using simulated annealing
-
Wong, K. P. 1995: Solving power system optimization problems using simulated annealing. Engineering Applications of Artificial Intelligence 8, 665-670.
-
(1995)
Engineering Applications of Artificial Intelligence
, vol.8
, pp. 665-670
-
-
Wong, K.P.1
-
14
-
-
0003393652
-
Maintenance scheduling of generating units in a power system
-
In Wang, X. and McDonald, J. R., editors London: McGraw-Hill
-
Yang, S. 1994: Maintenance scheduling of generating units in a power system. In Wang, X. and McDonald, J. R., editors, Modern power system planning. London: McGraw-Hill, 247-307.
-
(1994)
Modern power system planning
, pp. 247-307
-
-
Yang, S.1
|