-
2
-
-
38249019026
-
Scheduling random: Flexible manufacturing systems with dynamic environments
-
J. Hutchison and B. Khumawala, "Scheduling random: flexible manufacturing systems with dynamic environments", Journal of Operations Management, 9(3), pp. 335-351, 1990.
-
(1990)
Journal of Operations Management
, vol.9
, Issue.3
, pp. 335-351
-
-
Hutchison, J.1
Khumawala, B.2
-
3
-
-
0030399084
-
The state-of-the-art in intelligent realtime FMS control: A comprehensive survey
-
C. Shukla and F. F. Chen, "The state-of-the-art in intelligent realtime FMS control: a comprehensive survey", Journal of Intelliegnt Manufacturing, 7, pp. 441-455, 1996.
-
(1996)
Journal of Intelliegnt Manufacturing
, vol.7
, pp. 441-455
-
-
Shukla, C.1
Chen, F.F.2
-
4
-
-
0002741758
-
-
Preprints of the Advanced Summer Institute (ASI) 95 of the NOE on Intelligent Control of Integrated Manufacturing Systems, Lisboa, Portugal, 24-28 June
-
L. Bongaerts, P. Valckenaers, H. Van Brussel and J. Wyns, "Schedule execution for a holonic shop floor control system". Preprints of the Advanced Summer Institute (ASI) 95 of the NOE on Intelligent Control of Integrated Manufacturing Systems, Lisboa, Portugal, 24-28 June 1995.
-
(1995)
Schedule Execution for a Holonic Shop Floor Control System
-
-
Bongaerts, L.1
Valckenaers, P.2
Van Brussel, H.3
Wyns, J.4
-
5
-
-
0025590343
-
Two-layer on-line scheduling of flexible manufacturing systems
-
21-23 May, NY
-
S. Engell and M. Moser, "Two-layer on-line scheduling of flexible manufacturing systems", Proceedings of Rensselaer's 2nd International Conference on CIM, 21-23 May, NY, pp. 435-433, 1990.
-
(1990)
Proceedings of Rensselaer's 2nd International Conference on CIM
, pp. 435-1433
-
-
Engell, S.1
Moser, M.2
-
7
-
-
0029409075
-
Organizational foundations of intelligent manufacturing systems - The holonic viewpoint
-
J. Mathews, "Organizational foundations of intelligent manufacturing systems - the holonic viewpoint", Computer Integrated Manufacturing Systems, 8(4), pp. 237-243, 1995.
-
(1995)
Computer Integrated Manufacturing Systems
, vol.8
, Issue.4
, pp. 237-243
-
-
Mathews, J.1
-
8
-
-
0028531491
-
Holonic manufacturing systems
-
M. Winkler and M. Mey, "Holonic Manufacturing Systems", European Production Engineering, 18(3-4), pp. 10-12, 1994.
-
(1994)
European Production Engineering
, vol.18
, Issue.3-4
, pp. 10-12
-
-
Winkler, M.1
Mey, M.2
-
9
-
-
44949284972
-
The evolution of control architectures for automated manufacturing systems
-
D. M. Dilts, N. P. Boyd and H. H. Whorms, "The evolution of control architectures for automated manufacturing systems", Journal of Manufacturing Systems, 10(1), pp.79-93, 1991.
-
(1991)
Journal of Manufacturing Systems
, vol.10
, Issue.1
, pp. 79-93
-
-
Dilts, D.M.1
Boyd, N.P.2
Whorms, H.H.3
-
10
-
-
0003162455
-
Holonic planning and scheduling for a robotic assembly testbed
-
Rensselaer, NY, October
-
L. Gou, T. Hasegawa, P. B. Luh, S. Tamura and J. M. Oblak, "Holonic planning and scheduling for a robotic assembly testbed", Proceedings of the 4th Rensselaer International Conference on Computer Integrated Manufacturing and Automation Technology, Rensselaer, NY, pp. 142-149, October 1994.
-
(1994)
Proceedings of the 4th Rensselaer International Conference on Computer Integrated Manufacturing and Automation Technology
, pp. 142-149
-
-
Gou, L.1
Hasegawa, T.2
Luh, P.B.3
Tamura, S.4
Oblak, J.M.5
-
11
-
-
85037798480
-
-
Preprints of IMS'94 IFAC/IFIP/IFORS Workshop, Vienna, 13-15 June
-
H. Valckenaers, H. Van Brussel, F. Nonneville, L. Bongaerts and J. Wyns. "IMS test case 5: holonic manufacturing systems", Preprints of IMS'94 IFAC/IFIP/IFORS Workshop, Vienna, 13-15 June 1994.
-
(1994)
IMS Test Case 5: Holonic Manufacturing Systems
-
-
Valckenaers, H.1
Van Brussel, H.2
Nonneville, F.3
Bongaerts, L.4
Wyns, J.5
-
12
-
-
85008802627
-
Results of the holonic control system benchmark at KULeuven
-
Rensselaer's Polytechnic Institute, New York, USA, October
-
P. Valckenaers, F. Bonneville, H. Van Brussel, L. Bongaerts and J. Wyns, "Results of the holonic control system benchmark at KULeuven", Proceedings of the Rensselaer 4th International Conference on Computer Integrated Manufacturing and Automation Technology (CIMAT), Rensselaer's Polytechnic Institute, New York, USA, October 1994.
-
(1994)
Proceedings of the Rensselaer 4th International Conference on Computer Integrated Manufacturing and Automation Technology (CIMAT)
-
-
Valckenaers, P.1
Bonneville, F.2
Van Brussel, H.3
Bongaerts, L.4
Wyns, J.5
-
13
-
-
0029349784
-
Programming, scheduling and control of flexible assembly systems
-
P. Valckenaers, H. Van Brussel, L. Bongaerts and F. Bonneville, "Programming, scheduling and control of flexible assembly systems", Computers in Industry, 26(3), pp. 209-218, 1995.
-
(1995)
Computers in Industry
, vol.26
, Issue.3
, pp. 209-218
-
-
Valckenaers, P.1
Van Brussel, H.2
Bongaerts, L.3
Bonneville, F.4
-
14
-
-
0001844476
-
Architectural and system design in holonic manufacturing systems
-
Bucharest, Romania, 24-26 October
-
H. Van Brussel, P. Valckenaers, L. Bongaerts and J. Wyns, "Architectural and system design in holonic manufacturing systems", 3rd IFAC Workshop on Intelligent Manufacturing Systems (IMS'95), Bucharest, Romania, 24-26 October 1995.
-
(1995)
3rd IFAC Workshop on Intelligent Manufacturing Systems (IMS'95)
-
-
Van Brussel, H.1
Valckenaers, P.2
Bongaerts, L.3
Wyns, J.4
|