메뉴 건너뛰기




Volumn 126, Issue 1, 2000, Pages 61-67

Urban freeway bridge reconstruction planning: case of Mockingbird bridge

Author keywords

[No Author keywords available]

Indexed keywords

CONSTRUCTION INDUSTRY; ENGINEERING RESEARCH; HIGHWAY BRIDGES; RECONSTRUCTION (STRUCTURAL); STRUCTURAL DESIGN; TRAFFIC SURVEYS; URBAN PLANNING;

EID: 0033704529     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(2000)126:1(61)     Document Type: Article
Times cited : (5)

References (3)
  • 2
    • 0004296022 scopus 로고
    • An INDOT lessons learned constructability program and integrated multi media system
    • Purdue Univ., West Lafayette, Ind.
    • McCullouch, B. G., and Patty, R. (1993). "An INDOT lessons learned constructability program and integrated multi media system." Res. proj. C-36-6711. Purdue Univ., West Lafayette, Ind.
    • (1993) Res. Proj. C-36-6711
    • McCullouch, B.G.1    Patty, R.2
  • 3
    • 4243890447 scopus 로고
    • Construct-ability in the bridge design process
    • Iowa State Univ., Ames, Iowa
    • Rowings, J. E., Harmelink, D. J., and Buttler, L. D. (1991). "Construct-ability in the bridge design process." Res. proj. 3193, Iowa State Univ., Ames, Iowa.
    • (1991) Res. Proj. 3193
    • Rowings, J.E.1    Harmelink, D.J.2    Buttler, L.D.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.