-
2
-
-
0031548947
-
US Nuclear regulatory commission research for primary system integrity regulations
-
Serpan C.Z. Jr, Mayfield M.E., Muscara J. US Nuclear regulatory commission research for primary system integrity regulations. Nucl Eng Des. 171:1997;1-14.
-
(1997)
Nucl Eng des
, vol.171
, pp. 1-14
-
-
Serpan C.Z., Jr.1
Mayfield, M.E.2
Muscara, J.3
-
3
-
-
0030460859
-
Review of work related to leak-before-break assessment
-
Ukadgaonker V.G., Shanmuga Babu R. Review of work related to leak-before-break assessment. Int J Pres Ves Piping. 69:1996;135-148.
-
(1996)
Int J Pres Ves Piping
, vol.69
, pp. 135-148
-
-
Ukadgaonker, V.G.1
Shanmuga Babu, R.2
-
4
-
-
0025598515
-
Development of USNRC standard review plan 3.6.3 for Leak-Before-Break applications on nuclear power plants
-
Wichman K., Lee S. Development of USNRC standard review plan 3.6.3 for Leak-Before-Break applications on nuclear power plants. Int J Pres Ves Piping. 43:1990;57-66.
-
(1990)
Int J Pres Ves Piping
, vol.43
, pp. 57-66
-
-
Wichman, K.1
Lee, S.2
-
5
-
-
0025628455
-
Leak-before-break in water reactor piping and vessels
-
Moan G.D., Coleman C.E., Price E.G., Rodgers D.K., Sagat S. Leak-before-break in water reactor piping and vessels. Int J Pres Ves Piping. 43:1990;1-22.
-
(1990)
Int J Pres Ves Piping
, vol.43
, pp. 1-22
-
-
Moan, G.D.1
Coleman, C.E.2
Price, E.G.3
Rodgers, D.K.4
Sagat, S.5
-
6
-
-
0025675073
-
Leak-Before-Break experiments on heat treated zr-2.5 wt% Nb pressure tubes
-
Koike M.H., Takahashi T., Baba H. Leak-Before-Break experiments on heat treated zr-2.5 wt% Nb pressure tubes. Int J Pres Ves Piping. 43:1990;39-56.
-
(1990)
Int J Pres Ves Piping
, vol.43
, pp. 39-56
-
-
Koike, M.H.1
Takahashi, T.2
Baba, H.3
-
7
-
-
0031121314
-
German leak-before-break concept (description of German LBB procedures practices and applications)
-
Bartholome G. German leak-before-break concept (description of German LBB procedures practices and applications). Int J Pres Ves Piping. 71:1997;139-146.
-
(1997)
Int J Pres Ves Piping
, vol.71
, pp. 139-146
-
-
Bartholome, G.1
-
8
-
-
0025624449
-
A probabilistic approach to leak-before-break in CANDU pressure tubes
-
Walker J.R. A probabilistic approach to leak-before-break in CANDU pressure tubes. Int J Pres Ves Piping. 43:1990;229-239.
-
(1990)
Int J Pres Ves Piping
, vol.43
, pp. 229-239
-
-
Walker, J.R.1
-
9
-
-
0345725981
-
The effect of multiple cracks on the leak-before-break case of pipe
-
Xie L.Y. The effect of multiple cracks on the leak-before-break case of pipe. Int J Pres Ves Piping. 75:1998;249-254.
-
(1998)
Int J Pres Ves Piping
, vol.75
, pp. 249-254
-
-
Xie, L.Y.1
-
12
-
-
0011632676
-
LMFR piping reliability analysis using probabilistic fracture mechanics
-
C. Cacciabue, & I.A. Papazoglou.
-
Kurisaka K., Nakai R. LMFR piping reliability analysis using probabilistic fracture mechanics. Cacciabue C., Papazoglou I.A. PSAM-III. 1996;1714.
-
(1996)
PSAM-III
, pp. 1714
-
-
Kurisaka, K.1
Nakai, R.2
-
13
-
-
0030222419
-
An examination of methods of assessing interacting surface cracks by comparison with experimental data
-
Leek T.H., Howard I.C. An examination of methods of assessing interacting surface cracks by comparison with experimental data. Int J Pres Ves Piping. 68:1996;181-201.
-
(1996)
Int J Pres Ves Piping
, vol.68
, pp. 181-201
-
-
Leek, T.H.1
Howard, I.C.2
|