-
1
-
-
0347691579
-
A shift in attitudes toward work hours
-
Halcrow A (1988). A shift in attitudes toward work hours. Personnel J 67: 17-19.
-
(1988)
Personnel J
, vol.67
, pp. 17-19
-
-
Halcrow, A.1
-
3
-
-
0345799584
-
HR is solving shift-work problems
-
Solomon CM (1993). HR is solving shift-work problems. Personnel J 72: 36-48.
-
(1993)
Personnel J
, vol.72
, pp. 36-48
-
-
Solomon, C.M.1
-
5
-
-
0030038901
-
Improving shift worker’s health and tolerance to shiftwork: Recent advances
-
Kogi K (1996). Improving shift worker’s health and tolerance to shiftwork: recent advances. Appl Ergonom 27: 5-8.
-
(1996)
Appl Ergonom
, vol.27
, pp. 5-8
-
-
Kogi, K.1
-
6
-
-
0004205909
-
-
Department of Health and Social Services, National Institute for Occupational Safety and Health, Cincinnati, Ohio
-
Rosa RR and Colligan MJ (1997). Plain Language about Shiftwork. Department of Health and Social Services, National Institute for Occupational Safety and Health, Cincinnati, Ohio.
-
(1997)
Plain Language about Shiftwork
-
-
Rosa, R.R.1
Colligan, M.J.2
-
8
-
-
38249039271
-
Algorithms for the computerised construction of shift systems which meet ergonomic criteria
-
Schwarzenau P et al (1986). Algorithms for the computerised construction of shift systems which meet ergonomic criteria. Appl Ergonom 17: 169-176.
-
(1986)
Appl Ergonom
, vol.17
, pp. 169-176
-
-
Schwarzenau, P.1
-
9
-
-
0023171522
-
A modular approach to optimal multiple-shift manpower scheduling
-
Burns RN and Koop GJ (1987). A modular approach to optimal multiple-shift manpower scheduling. Opns Res 35: 100-110.
-
(1987)
Opns Res
, vol.35
, pp. 100-110
-
-
Burns, R.N.1
Koop, G.J.2
-
10
-
-
84987014456
-
A network model for the rotating workforce scheduling problem
-
Balakrishnan N and Wong RT (1990). A network model for the rotating workforce scheduling problem. Networks 20: 25-42.
-
(1990)
Networks
, vol.20
, pp. 25-42
-
-
Balakrishnan, N.1
Wong, R.T.2
-
11
-
-
0027544656
-
A three-day workweek multiple-shift scheduling model
-
Hung R (1993). A three-day workweek multiple-shift scheduling model. J Opl Res Soc 44: 141-146.
-
(1993)
J Opl Res Soc
, vol.44
, pp. 141-146
-
-
Hung, R.1
-
12
-
-
0028498195
-
A multiple-shift workforce scheduling model under the 4-day workweek with weekday and weekend labour demands
-
Hung R (1994). A multiple-shift workforce scheduling model under the 4-day workweek with weekday and weekend labour demands. J Opl Res Soc 45: 1088-1092.
-
(1994)
J Opl Res Soc
, vol.45
, pp. 1088-1092
-
-
Hung, R.1
-
13
-
-
0028516324
-
Single-shift off-day scheduling of a hierarchical workforce with variable demands
-
Hung R (1994). Single-shift off-day scheduling of a hierarchical workforce with variable demands. Eur J Opl Res 78: 49-57.
-
(1994)
Eur J Opl Res
, vol.78
, pp. 49-57
-
-
Hung, R.1
-
14
-
-
0030064411
-
Designing better shift systems
-
Knauth P (1996). Designing better shift systems. Appl Ergonom 27: 39-44.
-
(1996)
Appl Ergonom
, vol.27
, pp. 39-44
-
-
Knauth, P.1
-
15
-
-
0347691576
-
Combinatorial approaches for hard problems in manpower scheduling
-
Lau HC (1996). Combinatorial approaches for hard problems in manpower scheduling. J Opns Res Soc of Japan 39: 88-98.
-
(1996)
J Opns Res Soc of Japan
, vol.39
, pp. 88-98
-
-
Lau, H.C.1
|