Precedence constrained scheduling to minimize weighted completion time on a single machine
-
to appear
-
C. Chekuri, R. Motwani, Precedence constrained scheduling to minimize weighted completion time on a single machine, Discrete Appl. Math., to appear.
-
Discrete Appl. Math.
-
-
Chekuri, C.1
Motwani, R.2
-
4
-
-
0024090156
-
A new approach for the maximum flow problem
-
Goldberg A.V., Tarjan R.E. A new approach for the maximum flow problem. J. ACM. 35:1988;921-940.
-
(1988)
J. ACM
, vol.35
, pp. 921-940
-
-
Goldberg, A.V.1
Tarjan, R.E.2
-
6
-
-
85031594713
-
Scheduling to minimize average completion time: off-line and on-line approximation algorithms
-
to appear
-
L.A. Hall, A.S. Schulz, D.B. Shmoys, J. Wein, Scheduling to minimize average completion time: off-line and on-line approximation algorithms, Math. Oper. Res., to appear.
-
Math. Oper. Res.
-
-
Hall, L.A.1
Schulz, A.S.2
Shmoys, D.B.3
Wein, J.4
-
7
-
-
0002555219
-
Tight bounds and 2-approximation algorithms for integer programs with two variables per inequality
-
Hochbaum D.S., Meggido N., Naor J., Tamir A. Tight bounds and 2-approximation algorithms for integer programs with two variables per inequality. Math. Programming. 62:1993;69-83.
-
(1993)
Math. Programming
, vol.62
, pp. 69-83
-
-
Hochbaum, D.S.1
Meggido, N.2
Naor, J.3
Tamir, A.4
-
8
-
-
77951587888
-
Sequencing jobs to minimize total weighted completion time subject to precedence constraints
-
Lawler E.L. Sequencing jobs to minimize total weighted completion time subject to precedence constraints. Ann. Discrete Math. 2:1978;75-90.
-
(1978)
Ann. Discrete Math.
, vol.2
, pp. 75-90
-
-
Lawler, E.L.1
-
9
-
-
0042983556
-
-
Working paper
-
F. Margot, M. Queyranne, Y. Wang, Decompositions, network flows and a precedence constrained single machine problem, Working paper, 1997.
-
(1997)
Decompositions, Network Flows and a Precedence Constrained Single Machine Problem
-
-
Margot, F.1
Queyranne, M.2
Wang, Y.3
-
10
-
-
0042983555
-
An algorithm for the single machine sequencing problem with precedence constraints
-
Potts C.N. An algorithm for the single machine sequencing problem with precedence constraints. Math. Programming Stud. 13:1980;78-87.
-
(1980)
Math. Programming Stud.
, vol.13
, pp. 78-87
-
-
Potts, C.N.1
-
11
-
-
0001267667
-
Structure of a simple scheduling polyhedron
-
Queyranne M. Structure of a simple scheduling polyhedron. Math. Programming. 58:1993;263-285.
-
(1993)
Math. Programming
, vol.58
, pp. 263-285
-
-
Queyranne, M.1
-
12
-
-
85031582051
-
-
Fachbereich Mathematik, Technische Universitt Berlin, 1994
-
M. Queyranne, A.S. Schulz, Polyhedral approaches to machine scheduling, Report No 408 / 1994, Fachbereich Mathematik, Technische Universitt Berlin, 1994.
-
(1994)
Polyhedral Approaches to Machine Scheduling, Report No
, vol.408
-
-
Queyranne, M.1
Schulz, A.S.2
-
13
-
-
85031588195
-
-
private communication, June
-
A.S. Schulz, private communication, June 1997.
-
(1997)
-
-
Schulz, A.S.1
-
16
-
-
0343107232
-
Formulating single machine scheduling problems with precedence constraints
-
in: J.J. Gabsewicz, J.F. Richard, L.A. Wolsey (Eds.) North-Holland, Amsterdam
-
L.A. Wolsey, Formulating single machine scheduling problems with precedence constraints, in: J.J. Gabsewicz, J.F. Richard, L.A. Wolsey (Eds.), Economic Decision Making: Games, Econometrics and Optimisation, Contributions in Honour of Jacques Dreze, North-Holland, Amsterdam, 1990, pp. 473-484.
-
(1990)
Economic Decision Making: Games, Econometrics and Optimisation, Contributions in Honour of Jacques Dreze
, pp. 473-484
-
-
Wolsey, L.A.1
|