메뉴 건너뛰기




Volumn 46, Issue 8, 1999, Pages 912-927

Metaheuristic scheduling procedure for resource-constrained projects with cash flows

Author keywords

[No Author keywords available]

Indexed keywords

CONSTRAINT THEORY; HEURISTIC PROGRAMMING; OPTIMIZATION; PLANNING; RESOURCE ALLOCATION;

EID: 0033350920     PISSN: 0894069X     EISSN: None     Source Type: Journal    
DOI: 10.1002/(SICI)1520-6750(199912)46:8<912::AID-NAV3>3.0.CO;2-C     Document Type: Article
Times cited : (22)

References (19)
  • 1
    • 0008242145 scopus 로고
    • The net present value criterion: Its impact on project scheduling
    • R. Bey, R.H. Doersch, and J.H. Patterson, The net present value criterion: Its impact on project scheduling, Proj Manage Quart 12(2), 35-45 (1981).
    • (1981) Proj Manage Quart , vol.12 , Issue.2 , pp. 35-45
    • Bey, R.1    Doersch, R.H.2    Patterson, J.H.3
  • 2
    • 0030231623 scopus 로고    scopus 로고
    • The development of cash flow weight procedures for maximizing the net present value of a project
    • S.M. Baroum and J.H. Patterson, The development of cash flow weight procedures for maximizing the net present value of a project, J Oper Manage 14, 209-227 (1996).
    • (1996) J Oper Manage , vol.14 , pp. 209-227
    • Baroum, S.M.1    Patterson, J.H.2
  • 3
    • 0016498438 scopus 로고
    • A comparison of heuristic and optimum solutions in resource-constrained project scheduling
    • E.W. Davis and J.H. Patterson, A comparison of heuristic and optimum solutions in resource-constrained project scheduling, Manage Sci 21, 944-955 (1975).
    • (1975) Manage Sci , vol.21 , pp. 944-955
    • Davis, E.W.1    Patterson, J.H.2
  • 6
    • 0000411214 scopus 로고
    • Tabu search - Part i
    • F. Glover, Tabu search - Part i, ORSA J Comput 1(3), 190-206 (1989).
    • (1989) ORSA J Comput , vol.1 , Issue.3 , pp. 190-206
    • Glover, F.1
  • 7
    • 0001724713 scopus 로고
    • Tabu search - Part ii
    • F. Glover, Tabu search - Part ii, ORSA J Comput 2(3), 3-32 (1990).
    • (1990) ORSA J Comput , vol.2 , Issue.3 , pp. 3-32
    • Glover, F.1
  • 9
    • 0042976241 scopus 로고
    • Numerical experience with the linear and Monte Carlo algorithms for solving production scheduling problem
    • Prentice-Hall. Englewood Cliffs, NJ
    • B. Giffler, G.L. Thompson, and V. Van Ness, "Numerical experience with the linear and Monte Carlo algorithms for solving production scheduling problem," Industrial scheduling, Prentice-Hall. Englewood Cliffs, NJ, pp. 300-307, 1963.
    • (1963) Industrial Scheduling , pp. 300-307
    • Giffler, B.1    Thompson, G.L.2    Van Ness, V.3
  • 10
    • 0028517361 scopus 로고
    • A tabu search procedure for resource constrained project scheduling problems with discounted cash flows
    • O. Icmeli and S. Erenguc, A tabu search procedure for resource constrained project scheduling problems with discounted cash flows, Comput Oper Res 21, 841-853 (1994).
    • (1994) Comput Oper Res , vol.21 , pp. 841-853
    • Icmeli, O.1    Erenguc, S.2
  • 11
    • 0002931518 scopus 로고
    • Tabu search methods for a single machine scheduling problem
    • M. Laguna, J. Wesley-Barnes, and F. Glover, Tabu search methods for a single machine scheduling problem, J Intell Manuf 2, 63-74 (1991).
    • (1991) J Intell Manuf , vol.2 , pp. 63-74
    • Laguna, M.1    Wesley-Barnes, J.2    Glover, F.3
  • 12
    • 0027240748 scopus 로고
    • Early-tardy cost tradeoffs in resource constrained projects with cash flows: An optimization-based approach
    • R. Padman and D.E. Smith-Daniels, Early-tardy cost tradeoffs in resource constrained projects with cash flows: An optimization-based approach, Eur J Oper Res 64, 295-311 (1993).
    • (1993) Eur J Oper Res , vol.64 , pp. 295-311
    • Padman, R.1    Smith-Daniels, D.E.2
  • 13
    • 0031165688 scopus 로고    scopus 로고
    • Heuristic scheduling of resource-constrained projects with cash flows
    • R. Padman, D.E. Smith-Daniels, and V.L. Smith-Daniels, Heuristic scheduling of resource-constrained projects with cash flows, Nav Res Logistics 44, 364-381 (1997).
    • (1997) Nav Res Logistics , vol.44 , pp. 364-381
    • Padman, R.1    Smith-Daniels, D.E.2    Smith-Daniels, V.L.3
  • 14
    • 0021460636 scopus 로고
    • A comparison of exact approaches for solving the multiple constrained resource project scheduling problems
    • J.H. Patterson, A comparison of exact approaches for solving the multiple constrained resource project scheduling problems, Manage Sci 30, 854-867 (1984).
    • (1984) Manage Sci , vol.30 , pp. 854-867
    • Patterson, J.H.1
  • 15
    • 0022794872 scopus 로고
    • A comparison of heuristics for scheduling projects with cash flows and resource restrictions
    • R.A. Russell, A comparison of heuristics for scheduling projects with cash flows and resource restrictions, Manage Sci 32, 1291-1300 (1986).
    • (1986) Manage Sci , vol.32 , pp. 1291-1300
    • Russell, R.A.1
  • 18
    • 0031476199 scopus 로고    scopus 로고
    • Connectionist approaches for solver selection in constrained project scheduling
    • D. Zhu and R. Padman, Connectionist approaches for solver selection in constrained project scheduling, Ann Oper Res 72, 265-298 (1998).
    • (1998) Ann Oper Res , vol.72 , pp. 265-298
    • Zhu, D.1    Padman, R.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.