-
1
-
-
0025904136
-
Finding maximum cliques in arbitrary and special graphs
-
L. Babel, Finding maximum cliques in arbitrary and special graphs, Computing, 46 (1991), 321-341.
-
(1991)
Computing
, vol.46
, pp. 321-341
-
-
Babel, L.1
-
2
-
-
0028734047
-
Nonpreemptive scheduling of independent tasks with prespecified processor allocations
-
L. Bianco, P. Dell'Olmo, and M.G. Speranza, Nonpreemptive scheduling of independent tasks with prespecified processor allocations, Nav Res Logistics 41 (1994), 959-971.
-
(1994)
Nav Res Logistics
, vol.41
, pp. 959-971
-
-
Bianco, L.1
Dell'Olmo, P.2
Speranza, M.G.3
-
3
-
-
0039749799
-
Scheduling independent tasks with multiple modes
-
L. Bianco, P. Dell'Olmo, and M.G. Speranza, Scheduling independent tasks with multiple modes, Discrete Appl Math 62 (1995), 35-50.
-
(1995)
Discrete Appl Math
, vol.62
, pp. 35-50
-
-
Bianco, L.1
Dell'Olmo, P.2
Speranza, M.G.3
-
4
-
-
0343407538
-
Scheduling independent tasks with multiple shared resources
-
A. Sciomachen (Editor), Wiley, New York
-
L. Bianco, P. Dell'Olmo, and M.G. Speranza, "Scheduling independent tasks with multiple shared resources," Optimization in industry 3, A. Sciomachen (Editor), Wiley, New York, 1995, 35-53.
-
(1995)
Optimization in Industry
, vol.3
, pp. 35-53
-
-
Bianco, L.1
Dell'Olmo, P.2
Speranza, M.G.3
-
5
-
-
0032099144
-
Heuristics for multimode scheduling problems with dedicated resources
-
L. Bianco, P. Dell'Olmo, and M.G. Speranza, Heuristics for multimode scheduling problems with dedicated resources, Eur J Oper Res 107 (1998), 260-271.
-
(1998)
Eur J Oper Res
, vol.107
, pp. 260-271
-
-
Bianco, L.1
Dell'Olmo, P.2
Speranza, M.G.3
-
6
-
-
0004048738
-
-
Springer-Verlag, Berlin
-
J. Błazewicz, K. Ecker, E. Pesch, G. Schmidt, and J. Wȩglarz. Scheduling computers and manufacturing processes, Springer-Verlag, Berlin, 1996.
-
(1996)
Scheduling Computers and Manufacturing Processes
-
-
Błazewicz, J.1
Ecker, K.2
Pesch, E.3
Schmidt, G.4
Wȩglarz, J.5
-
7
-
-
0027694317
-
Heuristics for scheduling projects with resources restrictions and several resource-durations modes
-
F.F. Boctor, Heuristics for scheduling projects with resources restrictions and several resource-durations modes, Int J Prod Res 31 (1993), 2547-2558.
-
(1993)
Int J Prod Res
, vol.31
, pp. 2547-2558
-
-
Boctor, F.F.1
-
8
-
-
0026376478
-
Scheduling of project networks by job assignment
-
A. Drexl, Scheduling of project networks by job assignment, Manage Sci 37 (1991), 1590-1602.
-
(1991)
Manage Sci
, vol.37
, pp. 1590-1602
-
-
Drexl, A.1
-
10
-
-
74849101820
-
Optimization and approximation in deterministic scheduling: A survey
-
R.L. Graham, E.L. Lawler, J.K. Lenstra, and A.G.H. Rinnooy Kan, Optimization and approximation in deterministic scheduling: A survey, Ann Discrete Math 5 (1979), 287-326.
-
(1979)
Ann Discrete Math
, vol.5
, pp. 287-326
-
-
Graham, R.L.1
Lawler, E.L.2
Lenstra, J.K.3
Rinnooy Kan, A.G.H.4
-
12
-
-
0028430131
-
A decomposition approach for a resource constrained scheduling problem
-
P. Serafini and M.G. Speranza, A decomposition approach for a resource constrained scheduling problem, Eur J Oper Res 75 (1993), 112-135.
-
(1993)
Eur J Oper Res
, vol.75
, pp. 112-135
-
-
Serafini, P.1
Speranza, M.G.2
-
13
-
-
0027302081
-
Hierarchical models for multi-project planning and scheduling
-
M.G. Speranza and C. Vercellis, Hierarchical models for multi-project planning and scheduling, Eur J Oper Res 64 (1993), 312-325.
-
(1993)
Eur J Oper Res
, vol.64
, pp. 312-325
-
-
Speranza, M.G.1
Vercellis, C.2
-
14
-
-
21344485821
-
Resource-constrained project scheduling: Exact methods for the multi-mode case
-
Springer-Verlag, Berlin
-
A. Sprecher, "Resource-constrained project scheduling: Exact methods for the multi-mode case," Lecture notes in economics and mathematical systems, 409, Springer-Verlag, Berlin, 1993.
-
(1993)
Lecture Notes in Economics and Mathematical Systems
, vol.409
-
-
Sprecher, A.1
-
15
-
-
0018011301
-
Multiple resource-constrained scheduling using branch and bound
-
J.P. Stinson, E.W. Davis, and B.M. Khumawala, Multiple resource-constrained scheduling using branch and bound, AIIE Trans 10 (1978), 252-259.
-
(1978)
AIIE Trans
, vol.10
, pp. 252-259
-
-
Stinson, J.P.1
Davis, E.W.2
Khumawala, B.M.3
-
16
-
-
0020193734
-
Resource-constrained project scheduling with time-resource trade-offs: The nonpreemptive case
-
F.B. Talbot, Resource-constrained project scheduling with time-resource trade-offs: The nonpreemptive case, Manage Sci 28 (1982), 1197-1210.
-
(1982)
Manage Sci
, vol.28
, pp. 1197-1210
-
-
Talbot, F.B.1
-
18
-
-
0018531139
-
Project scheduling with discrete and continuously divisible resources
-
J. Wȩglarz, Project scheduling with discrete and continuously divisible resources, IEEE Trans Syst Man Cybernet 9 (1979), 664-650.
-
(1979)
IEEE Trans Syst Man Cybernet
, vol.9
, pp. 664-1650
-
-
Wȩglarz, J.1
-
19
-
-
0018923627
-
On certain models of resources allocation problems
-
J. Wȩglarz, On certain models of resources allocation problems, Kybernetics 9 (1980), 61-66.
-
(1980)
Kybernetics
, vol.9
, pp. 61-66
-
-
Wȩglarz, J.1
|