메뉴 건너뛰기




Volumn , Issue , 1999, Pages 69-72

Segment-based approach for real-Time reactive rescheduling for automatic manufacturing control

Author keywords

[No Author keywords available]

Indexed keywords

COMPUTATIONAL EFFICIENCY; MANUFACTURE; SCHEDULING ALGORITHMS; SEMICONDUCTOR DEVICE MANUFACTURE; ALGORITHMS; COMPUTER SIMULATION; FACTORY AUTOMATION; INDUSTRIAL ELECTRONICS; PRODUCTION CONTROL; REAL TIME SYSTEMS; SCHEDULING; SILICON WAFERS;

EID: 0033320939     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/ISSM.1999.808740     Document Type: Conference Paper
Times cited : (2)

References (4)
  • 2
    • 0031339609 scopus 로고    scopus 로고
    • Modeling, schcduling, and dispatching in tlic dynamic mviroiiriiciil of semiconductor manolscluxing at FASL, Inp; M
    • Pickett, B. . Zosiga. M. "Modeling, schcduling, and dispatching in tlic dynamic mviroiiriiciil of semiconductor manolscluxing at FASL, Inp; m", IEEWSEMI Advanced Semiconductor M, uuhcluriog Conference. pp 448-450, 1997
    • (1997) IEEWSEMI Advanced Semiconductor M, Uuhcluriog Conference , pp. 448-450
    • Pickett, B.1    Zosiga, M.2
  • 3
    • 85040538807 scopus 로고    scopus 로고
    • A tight plow conliol for job-shop rlbricalion lines with finite iluficcls
    • lpp 1X-D34, Oct. 1917
    • Hiioyasii Toba, "A Tight Plow Conliol for Job-shop Rlbricalion Lines with Finite Iluficcls". Proceedings of lSSM. 1997. lpp 1X-D34, Oct. 1917.
    • (1997) Proceedings of LSSM
    • Toba, H.1
  • 4
    • 0010013175 scopus 로고
    • Development ot Production Planning Suppnrt ron! PLAN-SlAGE mr tjlsifab Lines" (Japanese)
    • March
    • Micltio I lomina, Shin lohnai, ct. al. "Development ot Production Planning Suppnrt ron! PLAN-SlAGE mr tJLSIFAB Lines" (Japanese), NEC Technical Journal, vol. 48, no. 3, pp 264-269, March 1995.
    • (1995) NEC Technical Journal , vol.48 , Issue.3 , pp. 264-269
    • Ilomina, M.1    Iohnai, S.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.