|
Volumn 2, Issue , 1999, Pages
|
First four water shut-off treatments in ONWJ field: design, execution, evaluation, and strategy for the next treatments
a a a a
a
ARCO Indonesia
*
(Indonesia)
|
Author keywords
[No Author keywords available]
|
Indexed keywords
ELECTRIC SUBMERSIBLE PUMPS;
HALL PLOT METHOD;
WATER SHUTOFF TREATMENTS;
WATERED OUT WELLS;
COST EFFECTIVENESS;
ENHANCED RECOVERY;
GAS LIFTS;
INJECTION (OIL WELLS);
OIL WELL PRODUCTION;
OIL WELL PUMPING;
OIL WELLS;
PETROLEUM RESERVOIR EVALUATION;
PROJECT MANAGEMENT;
PETROLEUM RESERVOIR ENGINEERING;
|
EID: 0033313010
PISSN: None
EISSN: None
Source Type: Conference Proceeding
DOI: None Document Type: Conference Paper |
Times cited : (8)
|
References (8)
|