-
3
-
-
0029489599
-
Statistical process control with several components of common cause variability
-
Woodall, W.H. and Thomas, E.V. (1995) Statistical process control with several components of common cause variability. HE Transactions, 27, 757-764.
-
(1995)
HE Transactions
, vol.27
, pp. 757-764
-
-
Woodall, W.H.1
Thomas, E.V.2
-
4
-
-
33749919700
-
Parameter estimation for a short run process with an adjustment
-
37-97465, Department of Decision Science and Engineering Systems, Rensselaer Polytechnic Institute, Troy, NY
-
Sullo, P. and Vandeven, M. (1997) Parameter estimation for a short run process with an adjustment. Technical Report 37-97465, Department of Decision Science and Engineering Systems, Rensselaer Polytechnic Institute, Troy, NY 12180.
-
(1997)
Technical Report
, pp. 12180
-
-
Sullo, P.1
Vandeven, M.2
-
5
-
-
0000638802
-
Further contributions to adaptive quality control: Simultaneous estimation of dynamics: non-zero costs
-
Box, G.E.P. and Jenkins, G.M. (1963) Further contributions to adaptive quality control: simultaneous estimation of dynamics: non-zero costs. Bulletin of the International Statistical Institute, 34, 943-974.
-
(1963)
Bulletin of the International Statistical Institute
, vol.34
, pp. 943-974
-
-
Box, G.E.P.1
Jenkins, G.M.2
-
6
-
-
0024771160
-
An analysis of Taguchi's on-line process control procedure under a random-walk model
-
Adams, B.M. and Woodall, W.H. (1989) An analysis of Taguchi's on-line process control procedure under a random-walk model. Teclmometrics, 31, 401-413.
-
(1989)
Teclmometrics
, vol.31
, pp. 401-413
-
-
Adams, B.M.1
Woodall, W.H.2
-
7
-
-
84893529721
-
Statistical process monitoring and feedback adjustment - A discussion
-
Box, G.E.P. and Kramer, T. (1992) Statistical process monitoring and feedback adjustment - a discussion. Teclmometrics, 34, 251285.
-
(1992)
Teclmometrics
, vol.34
, pp. 251285
-
-
Box, G.E.P.1
Kramer, T.2
-
8
-
-
0026821241
-
An SPC model for short production runs: Minimizing expected costs
-
Crowder, S.V. (1992) An SPC model for short production runs: minimizing expected costs. Teclmometrics, 34, 64-73.
-
(1992)
Teclmometrics
, vol.34
, pp. 64-73
-
-
Crowder, S.V.1
-
9
-
-
0000094919
-
Optimal adjustment in the presence of deterministic process drift and random adjustment error
-
Jensen, K.L. and Vardeman, S.B. (1993) Optimal adjustment in the presence of deterministic process drift and random adjustment error. Teclmometrics, 35, 376-389.
-
(1993)
Teclmometrics
, vol.35
, pp. 376-389
-
-
Jensen, K.L.1
Vardeman, S.B.2
-
11
-
-
0003572832
-
-
McGraw-Hill, New York, NY
-
Grant, E.L. and Leavenworth, R.S. (1996) Statistical Quality Control, 7th edn., McGraw-Hill, New York, NY.
-
(1996)
Statistical Quality Control, 7th Edn.
-
-
Grant, E.L.1
Leavenworth, R.S.2
-
14
-
-
0345631905
-
A new method for approving a machine or process setting part 1
-
January
-
Burr, I.W. (1949) A new method for approving a machine or process setting part 1. Industrial Quality Control, January, 12-18.
-
(1949)
Industrial Quality Control
, pp. 12-18
-
-
Burr, I.W.1
-
15
-
-
0020830912
-
An optimum procedure for setting machines or adjusting processes
-
Grubbs, F.E. (1983) An optimum procedure for setting machines or adjusting processes. Journal of Quality Technology, 15,186-189.
-
(1983)
Journal of Quality Technology
, vol.15
, pp. 186-189
-
-
Grubbs, F.E.1
-
16
-
-
27844547281
-
An application of Bayesian methods in SPC
-
Woodward, P.W. and Naylor, J.C. (1993) An application of Bayesian methods in SPC. The Statistician, 42, 461-469.
-
(1993)
The Statistician
, vol.42
, pp. 461-469
-
-
Woodward, P.W.1
Naylor, J.C.2
-
17
-
-
0030104584
-
A general model for the optimal economic design of,? charts used to control short or long run processes
-
Del Castillo, E. and Montgomery, D.C. (1996) A general model for the optimal economic design of,? charts used to control short or long run processes. HE Transactions, 28, 193-201
-
(1996)
HE Transactions
, vol.28
, pp. 193-201
-
-
Del Castillo, E.1
Montgomery, D.C.2
-
18
-
-
33749916266
-
Process capability and optimal adjustment strategies for a process with run-to-run variation, part I: 0-1 loss
-
37-95-435, Department of Decision Science and Engineering systems, Rensselaer Polytechnic Institute, Troy, NY
-
Sullo, P. and Vandeven, M. (1995) Process capability and optimal adjustment strategies for a process with run-to-run variation, part I: 0-1 loss. Technical Report 37-95-435, Department of Decision Science and Engineering systems, Rensselaer Polytechnic Institute, Troy, NY 12180.
-
(1995)
Technical Report
, pp. 12180
-
-
Sullo, P.1
Vandeven, M.2
-
21
-
-
0003840448
-
-
Chrysler Corp., Ford Motor Co., General Motors Corp., available from AIAG 01-248-358-3003.
-
Quality Systems Requirements, QS-9000, (1998) 3rd edn., Chrysler Corp., Ford Motor Co., General Motors Corp., available from AIAG 01-248-358-3003.
-
Quality Systems Requirements, QS-9000, (1998) 3rd Edn.
-
-
-
22
-
-
33749925433
-
-
Chrysler Corp., Ford Motor Co., General Motors Corp., available from AIAG 01-248-358-3003.
-
Production Part Approval Process, (1995) 2nd edn., Chrysler Corp., Ford Motor Co., General Motors Corp., available from AIAG 01-248-358-3003.
-
Production Part Approval Process, (1995) 2nd Edn.
-
-
|