메뉴 건너뛰기




Volumn 12, Issue 3, 1999, Pages 273-280

Dynamic bottleneck control in wide variety production factory

Author keywords

[No Author keywords available]

Indexed keywords

APPLICATION SPECIFIC INTEGRATED CIRCUITS; COMPUTER SIMULATION; COST EFFECTIVENESS; JOB ANALYSIS; JUST IN TIME PRODUCTION; MICROCOMPUTERS; RELIABILITY; SCHEDULING; STRATEGIC PLANNING;

EID: 0033308648     PISSN: 08946507     EISSN: None     Source Type: Journal    
DOI: 10.1109/66.778190     Document Type: Article
Times cited : (34)

References (14)
  • 1
    • 0023964289 scopus 로고
    • Closed-loop job release control for VLSI circuit manufacturing
    • Feb.
    • C. R. Glassey and G. C. M. Resende, "Closed-loop job release control for VLSI circuit manufacturing," IEEE Trans. Semiconduct. Manufact., vol. 1, pp. 36-46, Feb. 1988.
    • (1988) IEEE Trans. Semiconduct. Manufact. , vol.1 , pp. 36-46
    • Glassey, C.R.1    Resende, G.C.M.2
  • 2
    • 0028481114 scopus 로고
    • Efficient scheduling policies to reduce mean and variance of cyde-time in semiconductor manufacturing plants
    • Feb.
    • S. C. H. Lu, D. Ramaswamy, and P. R. Kumar, "Efficient scheduling policies to reduce mean and variance of cyde-time in semiconductor manufacturing plants," IEEE Trans. Semiconduct. Manufact., vol. 7, pp. 374-388, Feb. 1994.
    • (1994) IEEE Trans. Semiconduct. Manufact. , vol.7 , pp. 374-388
    • Lu, S.C.H.1    Ramaswamy, D.2    Kumar, P.R.3
  • 5
    • 0024055865 scopus 로고
    • Scheduling semiconductor wafer fabrication
    • Aug.
    • L. M. Wein, "Scheduling semiconductor wafer fabrication," IEEE Trans. Semiconduct. Manufact., vol. 1, pp. 115-130, Aug. 1988.
    • (1988) IEEE Trans. Semiconduct. Manufact. , vol.1 , pp. 115-130
    • Wein, L.M.1
  • 6
    • 0026369803 scopus 로고
    • Distributed scheduling based on due dates and buffer priorities
    • Dec.
    • S. H. Lu and P. R. Kumar, "Distributed scheduling based on due dates and buffer priorities," IEEE Trans. Automat. Contr., vol. 36, pp. 1406-1416, Dec. 1991.
    • (1991) IEEE Trans. Automat. Contr. , vol.36 , pp. 1406-1416
    • Lu, S.H.1    Kumar, P.R.2
  • 8
    • 0028419353 scopus 로고
    • Scheduling semiconductor lines using a fluid network model
    • Apr.
    • D. Connors, G. Feigin, and D. Yao, "Scheduling semiconductor lines using a fluid network model," IEEE Trans. Robot. Automat., vol. 10, pp. 88, Apr. 1994.
    • (1994) IEEE Trans. Robot. Automat. , vol.10 , pp. 88
    • Connors, D.1    Feigin, G.2    Yao, D.3
  • 9
    • 0026869951 scopus 로고
    • On the relationship between yield and cycle time in semiconductor wafer fabrication
    • May
    • L. M. Wein, "On the relationship between yield and cycle time in semiconductor wafer fabrication," IEEE Trans. Semiconduct. Manufact., vol. 5, pp. 156-158, May 1992.
    • (1992) IEEE Trans. Semiconduct. Manufact. , vol.5 , pp. 156-158
    • Wein, L.M.1
  • 10
    • 0023979312 scopus 로고
    • Theory and practice of load-oriented manufacturing control
    • W. Bechte, "Theory and practice of load-oriented manufacturing control," Int. J. Prod. Res., vol. 26, no. 3, pp. 375-395, 1988.
    • (1988) Int. J. Prod. Res. , vol.26 , Issue.3 , pp. 375-395
    • Bechte, W.1
  • 14
    • 0031370064 scopus 로고    scopus 로고
    • Strategic inventory control for stable production
    • M. Nishimura, "Strategic inventory control for stable production," in Proc. ISSM'97, pp. A-1-A-4.
    • Proc. ISSM'97
    • Nishimura, M.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.