메뉴 건너뛰기




Volumn 20, Issue 4, 1999, Pages 173-178

New degree-day model for estimating energy demand in buildings

Author keywords

[No Author keywords available]

Indexed keywords

BUILDINGS; MATHEMATICAL MODELS; SENSITIVITY ANALYSIS;

EID: 0033299102     PISSN: 01436244     EISSN: None     Source Type: Journal    
DOI: 10.1177/014362449902000402     Document Type: Article
Times cited : (16)

References (9)
  • 1
    • 0033300743 scopus 로고    scopus 로고
    • Identification of the uncertainties in degree-day-based energy estimates
    • Day A R and Karayiannis T G Identification of the uncertainties in degree-day-based energy estimates Building Serv. Eng. Res. Technol. 20(4) 165-172 (1999)
    • (1999) Building Serv. Eng. Res. Technol. , vol.20 , Issue.4 , pp. 165-172
    • Day, A.R.1    Karayiannis, T.G.2
  • 2
    • 0342654091 scopus 로고
    • Owning and operating costs
    • Section B18 (London: Chartered Institution of Building Services Engineers)
    • Owning and operating costs CIBSE Guide Section B18 (London: Chartered Institution of Building Services Engineers) (1986)
    • (1986) CIBSE Guide
  • 4
    • 0343524226 scopus 로고    scopus 로고
    • revised edition; draft format only (London: Chartered Institution of Building Services Engineers)
    • CIBSE Building Energy Code Part 1 (revised edition; draft format only) (London: Chartered Institution of Building Services Engineers) (1997)
    • (1997) CIBSE Building Energy Code , Issue.PART 1
  • 5
    • 84977051583 scopus 로고
    • The admittance procedure: Intermittent plant operation
    • Harrington Lynn J The admittance procedure: intermittent plant operation Building Serv. Eng. 42 219-221 (1974)
    • (1974) Building Serv. Eng. , vol.42 , pp. 219-221
    • Harrington Lynn, J.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.