|
Volumn , Issue , 1999, Pages 46-57
|
Hotpipe project: A study of the selection of remedial measures to tackle/control the development of excessive bending
a a a |
Author keywords
Deformation limit; High pressure and high temperature pipeline; Limit state; Mitigation measure; Pipe soil interaction
|
Indexed keywords
BENDING;
CONFERENCE PROCEEDING;
HIGH PRESSURE SYSTEM;
HIGH TEMPERATURE APPLICATION;
REPAIR;
SOIL-STRUCTURE INTERACTION;
SUBMARINE PIPELINE;
BENDING;
CONFERENCE PROCEEDINGS;
HIGH PRESSURE;
HIGH TEMPERATURE;
REPAIR;
SOIL-STRUCTURE INTERACTION;
SUBMARINE PIPELINE;
BENDING MOMENTS;
BUCKLING;
FRICTION;
OFFSHORE PIPELINES;
STRUCTURAL ANALYSIS;
UNDERWATER SOILS;
HIGH PRESSURE/HIGH TEMPERATURE PIPELINES;
THERMAL BUCKLING;
SOIL STRUCTURE INTERACTIONS;
|
EID: 0033237895
PISSN: None
EISSN: None
Source Type: Book
DOI: None Document Type: Conference Paper |
Times cited : (7)
|
References (0)
|