-
1
-
-
0342478498
-
For and against semi-actuated signals
-
March
-
Ficklin, N. C. For and Against Semi-Actuated Signals. Traffic Engineering, March 1973.
-
(1973)
Traffic Engineering
-
-
Ficklin, N.C.1
-
2
-
-
0022756449
-
Coordination of actuated arterial traffic signal systems
-
ASCE, July
-
Jovanis, P. P., and J. A. Gregor. Coordination of Actuated Arterial Traffic Signal Systems. Journal of Transportation Engineering. ASCE, Vol. 112, No. 4, July 1986.
-
(1986)
Journal of Transportation Engineering
, vol.112
, Issue.4
-
-
Jovanis, P.P.1
Gregor, J.A.2
-
3
-
-
0030233083
-
Determination of timings in signal systems with traffic-actuated controllers
-
TRB, National Research Council, Washington, D.C.
-
Skabardonis, A. Determination of Timings in Signal Systems with Traffic-Actuated Controllers. In Transportation Research Record 1554, TRB, National Research Council, Washington, D.C., 1996, pp. 18-26.
-
(1996)
Transportation Research Record 1554
, pp. 18-26
-
-
Skabardonis, A.1
-
4
-
-
0030234426
-
Guidelines for actuated controllers in coordinated systems
-
TRB, National Research Council, Washington D.C.
-
Chang, E. C.-P. Guidelines for Actuated Controllers in Coordinated Systems. In Transportation Research Record 1554, TRB, National Research Council, Washington D.C., 1996, pp. 61-73.
-
(1996)
Transportation Research Record 1554
, pp. 61-73
-
-
Chang, E.C.-P.1
-
5
-
-
0030211676
-
Early green start analysis for time-of-day signal coordination
-
Aug.
-
Kuzbari, R. Early Green Start Analysis for Time-of-Day Signal Coordination. ITE Journal. Aug. 1996.
-
(1996)
ITE Journal
-
-
Kuzbari, R.1
-
7
-
-
0342912817
-
-
Report FHWA/RD-89-133, User's Guide. FHWA, U.S. Department of Transportation, Oct.
-
Skabardonis, A. Progression Through a Series of Intersections with Traffic Actuated Controllers. Report FHWA/RD-89-133, Vol. 2, User's Guide. FHWA, U.S. Department of Transportation, Oct. 1988.
-
(1988)
Progression Through a Series of Intersections with Traffic Actuated Controllers
, vol.2
-
-
Skabardonis, A.1
-
8
-
-
0031705052
-
A new algorithm for vehicle reidentification and travel time measurement on freeways
-
ASCE, Newport Beach, Calif.
-
Coifman, B. A New Algorithm for Vehicle Reidentification and Travel Time Measurement on Freeways. Applications of Advanced Technologies in Transportation, ASCE, Newport Beach, Calif., 1998, pp. 167-174.
-
(1998)
Applications of Advanced Technologies in Transportation
, pp. 167-174
-
-
Coifman, B.1
-
9
-
-
0343348049
-
Vehicle reidentification and travel time measurement in real-time on freeways using the existing loop detector infrastructure
-
Washington, D.C.
-
Coifman, B. Vehicle Reidentification and Travel Time Measurement in Real-Time on Freeways Using the Existing Loop Detector Infrastructure. Presented at 77th Annual Meeting of the Transportation Research Board, Washington, D.C., 1998.
-
(1998)
77th Annual Meeting of the Transportation Research Board
-
-
Coifman, B.1
-
10
-
-
0031697872
-
Loop-based travel time measurement
-
ASCE, Newport Beach, Calif.
-
Kuhne, R., J. Palen, C. Gardner, and S. Ritchie. Loop-Based Travel Time Measurement, Applications of Advanced Technologies in Transportation, ASCE, Newport Beach, Calif., 1998, pp. 175-182.
-
(1998)
Applications of Advanced Technologies in Transportation
, pp. 175-182
-
-
Kuhne, R.1
Palen, J.2
Gardner, C.3
Ritchie, S.4
-
11
-
-
0004125489
-
-
Prentice Hall, Inc., Englewood Cliffs, N.J.
-
McShane, W. R., and R. P. Roess. Traffic Engineering, Prentice Hall, Inc., Englewood Cliffs, N.J., 1990, p. 533.
-
(1990)
Traffic Engineering
, pp. 533
-
-
McShane, W.R.1
Roess, R.P.2
-
12
-
-
0003941354
-
Arterial progression - New design approach
-
TRB, National Research Council, Washington, D.C.
-
Wallace, C. E., and K. G. Courage. Arterial Progression - New Design Approach. In Transportation Research Record 881, TRB, National Research Council, Washington, D.C., 1982, pp. 53-59.
-
(1982)
Transportation Research Record 881
, pp. 53-59
-
-
Wallace, C.E.1
Courage, K.G.2
|