-
1
-
-
0032164377
-
Well-solvable special cases of the traveling salesman problem: A survey
-
Burkard, R. E., Deineko, V. G., Van Dal, R., vander Veen, J. A. A. and Woeginger, G. J., 1998, Well-solvable special cases of the traveling salesman problem: a survey. SIAM Review, 40, 496-546.
-
(1998)
SIAM Review
, vol.40
, pp. 496-546
-
-
Burkard, R.E.1
Deineko, V.G.2
Van Dal, R.3
Vander Veen, J.A.A.4
Woeginger, G.J.5
-
2
-
-
0024748492
-
Group set-up for printed circuit board assembly
-
Carmon, T F., Maimon, O. Z. and Dar-El, E. M., 1989, Group set-up for printed circuit board assembly. International Journal of Production Research, 27, 1837-1841.
-
(1989)
International Journal of Production Research
, vol.27
, pp. 1837-1841
-
-
Carmon, T.F.1
Maimon, O.Z.2
Dar-El, E.M.3
-
3
-
-
0021376635
-
Nonlinear programming without computation
-
Chua, L. O. and Lin, G. N., 1984, Nonlinear programming without computation. IEEE Transactions on Circuits and Systems, 31, 182-188.
-
(1984)
IEEE Transactions on Circuits and Systems
, vol.31
, pp. 182-188
-
-
Chua, L.O.1
Lin, G.N.2
-
4
-
-
0011750526
-
Design and scheduling of flexible assembly lines for printed circuit boards
-
Dessouky, M. M., Adiga, S. and Park, K., 1995, Design and scheduling of flexible assembly lines for printed circuit boards. International Journal of Production Research, 33, 757 775.
-
(1995)
International Journal of Production Research
, vol.33
, Issue.757
, pp. 775
-
-
Dessouky, M.M.1
Adiga, S.2
Park, K.3
-
5
-
-
0024715223
-
A mathematical model for loading the sequencers in a printed circuit pack manufacturing environment
-
Fathi, Y. and Taheri, J., 1989, A mathematical model for loading the sequencers in a printed circuit pack manufacturing environment. International Journal of Production Research, 27, 1305-1316.
-
(1989)
International Journal of Production Research
, vol.27
, pp. 1305-1316
-
-
Fathi, Y.1
Taheri, J.2
-
6
-
-
0032046859
-
A tabu search heuristic for the undirected selective travelling salesman problem
-
Gendreau, M., Laporte, G. and Semet, F., 1998, A tabu search heuristic for the undirected selective travelling salesman problem. European Journal of Operational Research, 106, 539-545.
-
(1998)
European Journal of Operational Research
, vol.106
, pp. 539-545
-
-
Gendreau, M.1
Laporte, G.2
Semet, F.3
-
7
-
-
0031140372
-
The travelling salesman problem: New solvable cases and linkages with the development of approximation algorithms
-
Glover, F. and Punnen, A. P., 1997, The travelling salesman problem: new solvable cases and linkages with the development of approximation algorithms. Journal of the Operational Research Society, 48, 502-510.
-
(1997)
Journal of the Operational Research Society
, vol.48
, pp. 502-510
-
-
Glover, F.1
Punnen, A.P.2
-
8
-
-
0001688636
-
A neural network model for on-line control of flexible manufacturing systems
-
Hao, G., Shang, J. S. and Vargas, L. G., 1995, A neural network model for on-line control of flexible manufacturing systems. International Journal of Production Research, 33, 2835-2854.
-
(1995)
International Journal of Production Research
, vol.33
, pp. 2835-2854
-
-
Hao, G.1
Shang, J.S.2
Vargas, L.G.3
-
9
-
-
5344264764
-
PCB assembly setup reduction using group technology
-
Hashiba, S. and Chang, T. C., 1991, PCB assembly setup reduction using group technology. Computers and Industrial Engineering, 21, 453-457.
-
(1991)
Computers and Industrial Engineering
, vol.21
, pp. 453-457
-
-
Hashiba, S.1
Chang, T.C.2
-
11
-
-
0001759895
-
SMT production scheduling: A general ized transportation approach
-
Ji, P., Wong, Y. S., Loh, H. T and Lee, L. C., 1994, SMT production scheduling: A general ized transportation approach. International Journal of Production Research, 32, 2323 2334.
-
(1994)
International Journal of Production Research
, vol.32
, Issue.2323
, pp. 2334
-
-
Ji, P.1
Wong, Y.S.2
Loh, H.T.3
Lee, L.C.4
-
12
-
-
0041665541
-
Engineering a circuit board assembly line for a desired capacity and flowtime
-
Johri, P K, 1991, Engineering a circuit board assembly line for a desired capacity and flowtime. Journal of Manufacturing System, 10, 492-500.
-
(1991)
Journal of Manufacturing System
, vol.10
, pp. 492-500
-
-
Johri, P.K.1
-
13
-
-
0024016062
-
Neural networks for nonlinear programming
-
Kennedy, M. P. and Chua, L. O., 1988, Neural networks for nonlinear programming. IEEE Transactions on Circuits and Systems, 35, 554-562.
-
(1988)
IEEE Transactions on Circuits and Systems
, vol.35
, pp. 554-562
-
-
Kennedy, M.P.1
Chua, L.O.2
-
14
-
-
0028462998
-
Impact of sequence-dependent setup time on job shop scheduling performance
-
Kim, S. C. and Bobrowski, P. M., 1994, Impact of sequence-dependent setup time on job shop scheduling performance. International Journal of Production Research, 32, 1503 1520.
-
(1994)
International Journal of Production Research
, vol.32
, Issue.1503
, pp. 1520
-
-
Kim, S.C.1
Bobrowski, P.M.2
-
15
-
-
0030379565
-
Some applications of the generalized travelling salesman problem
-
Laporte, G., Asef-Faziri, A. and Sriskandrarajah, C., 1996, Some applications of the generalized travelling salesman problem. Journal of the Operational Research Society, 47, 1461-1467.
-
(1996)
Journal of the Operational Research Society
, vol.47
, pp. 1461-1467
-
-
Laporte, G.1
Asef-Faziri, A.2
Sriskandrarajah, C.3
-
16
-
-
0003408279
-
-
Chichester: Wiley
-
Lawler, E. L., Lenstra, J. K., Kan, A. H. G. R. and Shmoys, D. B. (eds), 1985, The Traveling Salesman Problem: A Guided Tour of Combinatorial Optimization (Chichester: Wiley).
-
(1985)
The Traveling Salesman Problem: A Guided Tour of Combinatorial Optimization
-
-
Lawler, E.L.1
Lenstra, J.K.2
Kan, A.H.G.R.3
Shmoys, D.B.4
-
17
-
-
0029323355
-
Common sense realities of planning and scheduling in printed circuit board production
-
McKay, K. N., Safayeni, F. R. and Buzacott, J. A., 1995, ‘Common sense’ realities of planning and scheduling in printed circuit board production. International Journal of Production Research, 33, 1587-1603.
-
(1995)
International Journal of Production Research
, vol.33
, pp. 1587-1603
-
-
Mc Kay, K.N.1
Safayeni, F.R.2
Buzacott, J.A.3
-
19
-
-
0342410155
-
An experimental investigation of scheduling non identical, parallel processors with sequence-dependent set-up times and due dates
-
Randhawa, S. U. and Smith, T. A., 1995, An experimental investigation of scheduling non identical, parallel processors with sequence-dependent set-up times and due dates. International Journal of Production Research, 33, 59-69.
-
(1995)
International Journal of Production Research
, vol.33
, pp. 59-69
-
-
Randhawa, S.U.1
Smith, T.A.2
-
20
-
-
0029276859
-
The solution of travelling salesman problems base on industrial data
-
Roychoudhury, B. and Muth, J. F., 1995, The solution of travelling salesman problems base on industrial data. Journal of the Operational Research Society, 46, 347-353.
-
(1995)
Journal of the Operational Research Society
, vol.46
, pp. 347-353
-
-
Roychoudhury, B.1
Muth, J.F.2
-
21
-
-
0027609116
-
A heuristic algorithm for minimizing total production time for a sequence of jobs on a surface mount placement machine
-
Sadiq, M., Landers, T. L. and Taylor, G. D., 1993, A heuristic algorithm for minimizing total production time for a sequence of jobs on a surface mount placement machine. International Journal of Production Research, 31, 1327-1342.
-
(1993)
International Journal of Production Research
, vol.31
, pp. 1327-1342
-
-
Sadiq, M.1
Landers, T.L.2
Taylor, G.D.3
-
22
-
-
0001532011
-
Solving the discrete lotsizing and scheduling problem with sequence dependent set-up costs and set-up times using the travelling salesman problem with time windows
-
Salomon, M., Solomon, M. M., VanVassenhove, L. N., Dumas, Y. and Dauzere-Peres, S., 1997, Solving the discrete lotsizing and scheduling problem with sequence dependent set-up costs and set-up times using the travelling salesman problem with time windows. European Journal of Operational Research, 100, 494-513.
-
(1997)
European Journal of Operational Research
, vol.100
, pp. 494-513
-
-
Salomon, M.1
Solomon, M.M.2
Vanvassenhove, L.N.3
Dumas, Y.4
Dauzere-Peres, S.5
-
23
-
-
0026869894
-
A heuristic procedure for component scheduling in printed circuit pack sequencers
-
Sule, D. R., 1992, A heuristic procedure for component scheduling in printed circuit pack sequencers. International Journal of Production Research, 30, 1191-1208.
-
(1992)
International Journal of Production Research
, vol.30
, pp. 1191-1208
-
-
Sule, D.R.1
-
24
-
-
0031127970
-
Mathematical improvement of the hopheld model for TSP feasible solutions by synapse dynamical systems
-
Takahashi, Y., 1997, Mathematical improvement of the hopheld model for TSP feasible solutions by synapse dynamical systems. Neurocomputing, 15, 15-43.
-
(1997)
Neurocomputing
, vol.15
, pp. 15-43
-
-
Takahashi, Y.1
-
25
-
-
0022721216
-
Simple ‘neural’ optimization networks: An A/D converter, signal decision circuit, and a linear programming circuit
-
Tank, D. W. and Hopfield, J. J., 1986, Simple ‘neural’ optimization networks: An A/D converter, signal decision circuit, and a linear programming circuit. IEEE Transactions on Circuits and Systems, 33, 533-541.
-
(1986)
IEEE Transactions on Circuits and Systems
, vol.33
, pp. 533-541
-
-
Tank, D.W.1
Hopfield, J.J.2
-
26
-
-
0012930632
-
Sequencing jobs that require common resources on a single machine: A solvable case of the TSP
-
van deb Veen, J. A., Woeginger, G. J. and Zhang, S., 1998, Sequencing jobs that require common resources on a single machine: a solvable case of the TSP. Mathematical Programming, 82, 235-254.
-
(1998)
Mathematical Programming
, vol.82
, pp. 235-254
-
-
Van Deb Veen, J.A.1
Woeginger, G.J.2
Zhang, S.3
-
27
-
-
0030106939
-
A new neural network for solving linear programming problems and its appli cation
-
Xia, Y., 1996, A new neural network for solving linear programming problems and its appli cation. IEEE Transactions on Neural Networks, 7, 525-529.
-
(1996)
IEEE Transactions on Neural Networks
, vol.7
, pp. 525-529
-
-
Xia, Y.1
-
28
-
-
0029266590
-
Neural network for solving linear programming problems with bounded variables
-
Xia, Y. and Wang, J., 1995, Neural network for solving linear programming problems with bounded variables. IEEE Transactions on Neural Networks, 6, 515-519.
-
(1995)
IEEE Transactions on Neural Networks
, vol.6
, pp. 515-519
-
-
Xia, Y.1
Wang, J.2
-
29
-
-
0000414908
-
Applications of neural networks in manufacturing: A state-of-the-art survey
-
Zhang, H. C. and Huang, S. H., 1995, Applications of neural networks in manufacturing: A state-of-the-art survey. International Journal of Production Research, 33, 705-728.
-
(1995)
International Journal of Production Research
, vol.33
, pp. 705-728
-
-
Zhang, H.C.1
Huang, S.H.2
-
30
-
-
0025750997
-
A neural network approach to job-shop scheduling
-
Zhou, D. N., Cherkassy, V., Baldwin, T R. and Olson, D. E., 1991, A neural network approach to job-shop scheduling. IEEE Transactions on Neural Networks, 2, 175-179.
-
(1991)
IEEE Transactions on Neural Networks
, vol.2
, pp. 175-179
-
-
Zhou, D.N.1
Cherkassy, V.2
Baldwin, T.R.3
Olson, D.E.4
-
31
-
-
0031258773
-
An objective-guided ortho-synapse Hopheld network approach to machine grouping problems
-
Zolfaghari, S. and Liang, M., 1997, An objective-guided ortho-synapse Hopheld network approach to machine grouping problems. International Journal of Production Research, 35, 2773-2792.
-
(1997)
International Journal of Production Research
, vol.35
, pp. 2773-2792
-
-
Zolfaghari, S.1
Liang, M.2
|