메뉴 건너뛰기




Volumn 14, Issue 3, 1999, Pages 319-326

Ground stabilization for tunnel construction in mixed-face conditions

Author keywords

Construction; Grouting; Mixed face; Tunnels

Indexed keywords

CONSTRUCTION; FINITE ELEMENT METHOD; GROUTING; SETTLEMENT OF STRUCTURES; STRUCTURAL ANALYSIS; TUNNELING (EXCAVATION);

EID: 0033158140     PISSN: 08867798     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0886-7798(99)00046-2     Document Type: Article
Times cited : (8)

References (6)
  • 2
    • 0028160343 scopus 로고
    • The changing face of the TBM
    • May 1994
    • Lewis, R. 1994. The changing face of the TBM, Tunnels and Tunnelling (May 1994), 35-37,.
    • (1994) Tunnels and Tunnelling , pp. 35-37
    • Lewis, R.1
  • 3
    • 0028977394 scopus 로고
    • Difficult ground halts TBM
    • June 1995
    • Page, M. 1995. Difficult ground halts TBM. Tunnels and Tunnelling (June 1995), 26-28,
    • (1995) Tunnels and Tunnelling , pp. 26-28
    • Page, M.1
  • 4
    • 0020125344 scopus 로고
    • Berechnungsmethoden moderner berguannischer bauweisen beim U-Bahn-Bav
    • Schikora K. and Fink. T. 1982. Berechnungsmethoden moderner berguannischer bauweisen beim U-Bahn-Bav. Bauingenieur 97, 193-198.
    • (1982) Bauingenieur , vol.97 , pp. 193-198
    • Schikora, K.1    Fink, T.2
  • 6
    • 0024069129 scopus 로고
    • Soft ground TBMs set a cracking pace in Caracas
    • September
    • Wallis, S. 1988. Soft ground TBMs set a cracking pace in Caracas. Tunnels and Tunnelling, September, 25-28.
    • (1988) Tunnels and Tunnelling , pp. 25-28
    • Wallis, S.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.