-
2
-
-
85034503948
-
-
ADEDOPS Workshop (workshop on analysis and design of event-driven operations in process systems), Imperial College, Londres, 10-11 avril
-
P. BAUDET, C. AZZARO-PANTEL, S. DOMENECH et L. PIBOULEAU, A discrete-event simulation model for batch chemical plant scheduling, ADEDOPS Workshop (workshop on analysis and design of event-driven operations in process systems), Imperial College, Londres, 10-11 avril 1995.
-
(1995)
A Discrete-Event Simulation Model for Batch Chemical Plant Scheduling
-
-
Baudet, P.1
Azzaro-Pantel, C.2
Domenech, S.3
Pibouleau, L.4
-
3
-
-
85034490851
-
-
Colloque modélisation des systèmes réactifs, AFCET, Brest, 28-29 mars, publié dans les actes du congrès
-
P. BAUDET, C. AZZARO-PANTEL, S. DOMENECH, L. PIBOULEAU, Un modèle de simulation à événements discrets pour la gestion de production d'un atelier de chimie fine, Colloque modélisation des systèmes réactifs, AFCET, Brest, 28-29 mars, publié dans les actes du congrès, 1996, p. 211-221.
-
(1996)
Un Modèle de Simulation à Événements Discrets pour la Gestion de Production d'Un Atelier de Chimie Fine
, pp. 211-221
-
-
Baudet, P.1
Azzaro-Pantel, C.2
Domenech, S.3
Pibouleau, L.4
-
5
-
-
0011267750
-
Modélisation et simulation des systèmes automatisés
-
G. BEL et D. DUBOIS, Modélisation et simulation des systèmes automatisés, RAIRO APII, 1985, 19, p. 42-52.
-
(1985)
RAIRO APII
, vol.19
, pp. 42-52
-
-
Bel, G.1
Dubois, D.2
-
6
-
-
0025682531
-
Genetic algorithms and job-shop scheduling
-
J. E. BIEGEL et J. J. DAVERN, Genetic algorithms and job-shop scheduling, Comp. Ind. Engng., 1990, 19, p. 81-91.
-
(1990)
Comp. Ind. Engng.
, vol.19
, pp. 81-91
-
-
Biegel, J.E.1
Davern, J.J.2
-
7
-
-
0025416591
-
Simultaneous production planning and scheduling in multiproduct batch plants
-
D. B. BIREWAR et I. E. GROSSMAN, Simultaneous production planning and scheduling in multiproduct batch plants, Ind. Eng. Chem. Res., 1990, 29, p. 570-580.
-
(1990)
Ind. Eng. Chem. Res.
, vol.29
, pp. 570-580
-
-
Birewar, D.B.1
Grossman, I.E.2
-
10
-
-
0027693102
-
Simultaneous optimization of chemical flowshop sequencing and topology using Genetic algorithms
-
M. CARTWRIGHT et A. LONG, Simultaneous optimization of chemical flowshop sequencing and topology using Genetic algorithms, Ind. Eng. Chem. Res., 1993, 32, p. 2706-2713.
-
(1993)
Ind. Eng. Chem. Res.
, vol.32
, pp. 2706-2713
-
-
Cartwright, M.1
Long, A.2
-
12
-
-
33847505799
-
-
Journées d'études «ordonnancement et entreprise», Toulouse, Juin
-
C. CAUX, H. PIERREVAL, M. C. PORTMANN, Les algorithmes génétiques et leur application aux problèmes d'ordonnancement, Journées d'études «ordonnancement et entreprise», Toulouse, Juin 1994.
-
(1994)
Les Algorithmes Génétiques et Leur Application aux Problèmes d'Ordonnancement
-
-
Caux, C.1
Pierreval, H.2
Portmann, M.C.3
-
13
-
-
0029427108
-
Couplage méthodes d'ordonnancement-simulation pour l'ordonnancement de systèmes industriels de traitement de surfaces
-
C. CAUX, G. FLEURY, M. GOURGAND et P. KELLERT, Couplage méthodes d'ordonnancement-simulation pour l'ordonnancement de systèmes industriels de traitement de surfaces, RAIRO Oper. Res., 1995, 29, p. 391-413.
-
(1995)
RAIRO Oper. Res.
, vol.29
, pp. 391-413
-
-
Caux, C.1
Fleury, G.2
Gourgand, M.3
Kellert, P.4
-
15
-
-
0025571942
-
Scheduling of serial multiproduct batch processes via simulated annealing
-
H. DAS, P. T. CUMMINGS et M. D. LE VAN, Scheduling of serial multiproduct batch processes via simulated annealing, Comp. Chem. Engng., 1990, 14, p. 1351-1362.
-
(1990)
Comp. Chem. Engng.
, vol.14
, pp. 1351-1362
-
-
Das, H.1
Cummings, P.T.2
Van Le, M.D.3
-
16
-
-
0000150948
-
-
Proc. 1th Conf. on Gas and their applications, Lawrence Erlbaum, Hillsdale
-
L. DAVIS, Job-shop scheduling with Genetic algorithms, Proc. 1th Conf. on Gas and their applications, Lawrence Erlbaum, Hillsdale, 1985, p. 136-140.
-
(1985)
Job-Shop Scheduling with Genetic Algorithms
, pp. 136-140
-
-
Davis, L.1
-
18
-
-
0003871635
-
-
Doctoral Dissertation, University of Michigan), Dissertation Abstract International
-
K. A. DE JONG, An analsis of the behavior of a class of genetic adaptative systems, Doctoral Dissertation, University of Michigan), Dissertation Abstract International, 36, p. 5140B.
-
An Analsis of the Behavior of a Class of Genetic Adaptative Systems
, vol.36
-
-
De Jong, K.A.1
-
20
-
-
0022901698
-
Short term scheduling for multiproduct batch chemical plants
-
U. M. EGLI et D. W. T. RIPPIN, Short term scheduling for multiproduct batch chemical plants, Comput. Chem. Engng., 1986, 10, p. 303-325.
-
(1986)
Comput. Chem. Engng.
, vol.10
, pp. 303-325
-
-
Egli, U.M.1
Rippin, D.W.T.2
-
22
-
-
0024650459
-
On the solution of the retrofitting problem for multiproduct batch semi-continuous chemical plants
-
A. ESPUNA et L. PUIGJANER, On the solution of the retrofitting problem for multiproduct batch semi-continuous chemical plants, Comput. Chem. Engng., 1989, 13, p. 483-490.
-
(1989)
Comput. Chem. Engng.
, vol.13
, pp. 483-490
-
-
Espuna, A.1
Puigjaner, L.2
-
23
-
-
0025840039
-
-
Proceedings of the IEEE Int. Conf. on Robotics and Automation, Sacramento
-
E. FALKENAUER et S. BOUFFOUIX, A genetic algorithm for job-shop, Proceedings of the IEEE Int. Conf. on Robotics and Automation, Sacramento, 1991, p. 824-829.
-
(1991)
A Genetic Algorithm for Job-Shop
, pp. 824-829
-
-
Falkenauer, E.1
Bouffouix, S.2
-
26
-
-
0022865373
-
Future paths for integer programming and links to artificial intelligence
-
F. GLOVER, Future paths for integer programming and links to artificial intelligence, Compu. and Oper. Res., 1986, 13, p. 533-549.
-
(1986)
Compu. and Oper. Res.
, vol.13
, pp. 533-549
-
-
Glover, F.1
-
29
-
-
0002973186
-
-
RAIRO Recherche opérationnelle
-
Gotha, Les problèmes d'ordonnancement, RAIRO Recherche opérationnelle, 1993, 27, p. 77-150.
-
(1993)
Les Problèmes d'Ordonnancement
, vol.27
, pp. 77-150
-
-
Gotha1
-
32
-
-
0024857152
-
Knowledge-based tools for batch processing systems, Third Conference on Process Systems Engineering, PSE'88
-
M. HOFMEISTER, L. HALASZ et D. W. T. RIPPIN, Knowledge-based tools for batch processing systems, Third Conference on Process Systems Engineering, PSE'88, Comput. Chem. Engng., 1989, 13, p.1255-1261.
-
(1989)
Comput. Chem. Engng.
, vol.13
, pp. 1255-1261
-
-
Hofmeister, M.1
Halasz, L.2
Rippin, D.W.T.3
-
34
-
-
0004278712
-
-
Resp. Rep. R. C. 9335, IBM TJW, Center Yorktown, NY
-
S. KIRKPATRICK, C. D. GELATT et M. P. VECCHI, Optimization by simulated annealing, Resp. Rep. R. C. 9335, IBM TJW, Center Yorktown, NY, 1982.
-
(1982)
Optimization by Simulated Annealing
-
-
Kirkpatrick, S.1
Gelatt, C.D.2
Vecchi, M.P.3
-
35
-
-
0024984801
-
Completion time algorithms for serial multiproduct batch processes with shared storage
-
H. KU et I. A. KARIMI, Completion Time Algorithms for Serial Multiproduct Batch Processes with Shared Storage, Comput. Chem. Engng., 1990, 14, p. 49-69.
-
(1990)
Comput. Chem. Engng.
, vol.14
, pp. 49-69
-
-
Ku, H.1
Karimi, I.A.2
-
36
-
-
0025414711
-
Scheduling in serial multiproduct batch processes with due-date penalties
-
H. KU et I. A. KARIMI, Scheduling in serial multiproduct batch processes with due-date penalties, Ind. Eng. Chem. Res., 1990, 29, p. 580-590.
-
(1990)
Ind. Eng. Chem. Res.
, vol.29
, pp. 580-590
-
-
Ku, H.1
Karimi, I.A.2
-
37
-
-
0025800703
-
An evaluation of simulated annealing for batch process scheduling
-
H. KU et I. A. KARIMI, An evaluation of simulated annealing for batch process scheduling, Ind. Eng. Chem. Res., 1991, 30, p. 163-169.
-
(1991)
Ind. Eng. Chem. Res.
, vol.30
, pp. 163-169
-
-
Ku, H.1
Karimi, I.A.2
-
38
-
-
0023399061
-
Multiproduct plant scheduling studies using BOSS
-
K. KURIYAN, G. V. REKLAITIS et G. S. JOGLEKAR, Multiproduct plant scheduling studies using BOSS, Ind. Eng. Chem. Res., 1987, 26, p. 1551-1558.
-
(1987)
Ind. Eng. Chem. Res.
, vol.26
, pp. 1551-1558
-
-
Kuriyan, K.1
Reklaitis, G.V.2
Joglekar, G.S.3
-
39
-
-
38249026307
-
Scheduling network flowshops so as to minimize makespan
-
K. KURIYAN et G. V. REKLAITIS, Scheduling network flowshops so as to minimize makespan, Comput. Chem. Engng., 1989, 13, p. 187-200.
-
(1989)
Comput. Chem. Engng.
, vol.13
, pp. 187-200
-
-
Kuriyan, K.1
Reklaitis, G.V.2
-
40
-
-
0026461248
-
Job-shop scheduling by silulated annealing
-
P. J. M. LAARHOVEN, E. H. L. AARTS et J. K. LENSTRA, Job-shop scheduling by silulated annealing, Oper. Res., 1992, 40, p. 113.
-
(1992)
Oper. Res.
, vol.40
, pp. 113
-
-
Laarhoven, P.J.M.1
Aarts, E.H.L.2
Lenstra, J.K.3
-
41
-
-
0030085944
-
Optimal campaign planning/scheduling of multipurpose batch/semicontinuous plants. 1. Mathematical formulation
-
G. LAZAROS et C. PANTELIDES, Optimal Campaign Planning/Scheduling of Multipurpose Batch/Semicontinuous Plants. 1. Mathematical Formulation, Ind. Eng. Chem Res., 1996, 35, p. 488-509.
-
(1996)
Ind. Eng. Chem Res.
, vol.35
, pp. 488-509
-
-
Lazaros, G.1
Pantelides, C.2
-
42
-
-
0000835757
-
An approximative method for the production scheduling of industrial batch processes with parallel units
-
R. MUSIER et L. EVANS, An approximative method for the production scheduling of industrial batch processes with parallel units, Comput. Chem. Engng., 1989, 13, p. 229-238.
-
(1989)
Comput. Chem. Engng.
, vol.13
, pp. 229-238
-
-
Musier, R.1
Evans, L.2
-
44
-
-
0002899224
-
-
th Int. Conf. on Gas, Kaufmann Ed., San Mateo, California
-
th Int. Conf. on Gas, Kaufmann Ed., San Mateo, California, 1991, p. 474-479.
-
(1991)
Conventional Genetic Algorithm for Job-Shop Problems
, pp. 474-479
-
-
Nakano, R.1
Yamada, T.2
-
45
-
-
0027676060
-
Scheduling and simulated annealing. Application to a semiconductor circuit fabrication plant
-
E. PEYROL, P. FLOQUET, L. PIBOULEAU et S. DOMENECH, Scheduling and simulated annealing. Application to a semiconductor circuit fabrication plant, Comput. Chem. Engng., 1993, 17, p. S39-44.
-
(1993)
Comput. Chem. Engng.
, vol.17
-
-
Peyrol, E.1
Floquet, P.2
Pibouleau, L.3
Domenech, S.4
-
46
-
-
0343035434
-
-
Artiba A., Elmaghraby S.E., Eds., Chapman & Hall
-
M. C. PORTMANN, Scheduling methodology: Optimization and compu-search approaches I, Production and scheduling of manufacturing systems, Artiba A., Elmaghraby S.E., Eds., Chapman & Hall, 1996.
-
(1996)
Scheduling Methodology: Optimization and Compu-Search Approaches I, Production and Scheduling of Manufacturing Systems
-
-
Portmann, M.C.1
-
49
-
-
38249026095
-
Completion times in a serial mixed-storage multiproduct processes with transfer and set-up times
-
D. RAJAGOLAPAN et I. A. KARIMI, Completion times in a serial mixed-storage multiproduct processes with transfer and set-up times, Comput. Chem. Engng., 1989, 13, p. 175-186.
-
(1989)
Comput. Chem. Engng.
, vol.13
, pp. 175-186
-
-
Rajagolapan, D.1
Karimi, I.A.2
-
51
-
-
0027676062
-
Batch process systems engineering: A retrospective and prospective review
-
D. W. T. RIPPIN, Batch process systems engineering: A retrospective and prospective review, Comput. Chem. Engng., 1993, 17, p. S1-S536.
-
(1993)
Comput. Chem. Engng.
, vol.17
-
-
Rippin, D.W.T.1
-
52
-
-
53149147571
-
-
Proc. of the First Int. Conf. on Genetic Algorithms
-
D. SMITH, Bin packing with adaptative search, Proc. of the First Int. Conf. on Genetic Algorithms, 1985, p. 202-207.
-
(1985)
Bin Packing with Adaptative Search
, pp. 202-207
-
-
Smith, D.1
-
53
-
-
0026383160
-
Optimization using neural network
-
G. TAGLIARINI, J. CHRIST et E. PAGE, Optimization using neural network, IEEE Trans. Comp., 1991, 40, p. 1347-1358.
-
(1991)
IEEE Trans. Comp.
, vol.40
, pp. 1347-1358
-
-
Tagliarini, G.1
Christ, J.2
Page, E.3
-
54
-
-
0029394712
-
Scheduling of multiple products on parallel units with tardiness penalties using simulated annealing
-
M. TANDON, P. T. CUMMINGS et M. D. LE VAN, Scheduling of Multiple Products on Parallel Units with Tardiness Penalties using Simulated Annealing, Comput. Chem Engng., 1995, 19, p. 1069-1076.
-
(1995)
Comput. Chem Engng.
, vol.19
, pp. 1069-1076
-
-
Tandon, M.1
Cummings, P.T.2
Van Le, M.D.3
-
55
-
-
21144478436
-
Feature extraction algorithms for constrained global optimisation. 1. Mathematical foundation
-
A. G. TSIRUKIS et G. REKLAITIS, Feature extraction algorithms for constrained global optimisation. 1. Mathematical foundation, Ann. Oper. Res., 1993, 42, p. 229-273.
-
(1993)
Ann. Oper. Res.
, vol.42
, pp. 229-273
-
-
Tsirukis, A.G.1
Reklaitis, G.2
-
56
-
-
34250077721
-
Feature extraction algorithms for constrained global optimisation. 2. Batch process scheduling application
-
A. G. TSIRUKIS et G. REKLAITIS, Feature extraction algorithms for constrained global optimisation. 2. Batch process scheduling application, Ann. Oper. Res., 1993, 42, p. 225-312.
-
(1993)
Ann. Oper. Res.
, vol.42
, pp. 225-312
-
-
Tsirukis, A.G.1
Reklaitis, G.2
-
58
-
-
0028255405
-
Neural network approach for minimizing the makespan of the general job-shop
-
M. TSUYOSHI, M. KATSUMI et N. NOBUTO, Neural Network Approach for Minimizing the Makespan of the General Job-shop, Internal. J. Produc. Econom., 1994, 33, p. 67-74.
-
(1994)
Internal. J. Produc. Econom.
, vol.33
, pp. 67-74
-
-
Tsuyoshi, M.1
Katsumi, M.2
Nobuto, N.3
-
59
-
-
38249025837
-
Optimal schedule for a single-product production line - I. Problem
-
M. C. WELLONS et G. V. REKLAITIS, Optimal Schedule for a Single-Product Production Line-I. Problem, Comput. Chem. Engng., 1989, 13, p. 201-212.
-
(1989)
Comput. Chem. Engng.
, vol.13
, pp. 201-212
-
-
Wellons, M.C.1
Reklaitis, G.V.2
-
60
-
-
0023486356
-
Determination of completion times for serial multiproduct processes. 1. A two unit finite intermediate storage system
-
W. WIEDE, K. KURIYAN et G. V. REKLAITIS, Determination of completion times for serial multiproduct processes. 1. A two unit finite intermediate storage system, Comput. Chem. Engng., 1987, 11, p. 337-344.
-
(1987)
Comput. Chem. Engng.
, vol.11
, pp. 337-344
-
-
Wiede, W.1
Kuriyan, K.2
Reklaitis, G.V.3
-
61
-
-
0023486356
-
Determination of completion times for serial multiproduct processes. 2. A multi-unit finite intermediate storage system
-
W. WIEDE, K. KURIYAN et G. V. REKLAITIS, Determination of completion times for serial multiproduct processes. 2. A multi-unit finite intermediate storage system, Comput. Chem. Engng., 1987, 11, p. 345-356.
-
(1987)
Comput. Chem. Engng.
, vol.11
, pp. 345-356
-
-
Wiede, W.1
Kuriyan, K.2
Reklaitis, G.V.3
-
62
-
-
0023470130
-
Determination of completion times for serial multiproduct processes. 3. Mixed intermediate storage system
-
W. WIEDE, K. KURIYAN et G. V. REKLAITIS, Determination of completion times for serial multiproduct processes. 3. Mixed intermediate storage system, Comp. Chem. Engng., 1987, 11, p. 357-368.
-
(1987)
Comp. Chem. Engng.
, vol.11
, pp. 357-368
-
-
Wiede, W.1
Kuriyan, K.2
Reklaitis, G.V.3
-
63
-
-
0024684399
-
Capacity expansion study of a batch production line
-
A. YOUNG et G. V. REKLAITIS, Capacity expansion study of a batch production line, Ind. Eng. Chem. Res., 1989, 28, p. 772-777.
-
(1989)
Ind. Eng. Chem. Res.
, vol.28
, pp. 772-777
-
-
Young, A.1
Reklaitis, G.V.2
|