-
1
-
-
34249834508
-
Manufacturing flow line systems: A review of models and analytical results
-
1. Y. Dallery and S.B. Gershwin, Manufacturing flow line systems: A review of models and analytical results, Queueing Systems Theory and Applications, Special issue on Queueing Models of Manufacturing Systems 12 (1/2), 3-94 (1992).
-
(1992)
Queueing Systems Theory and Applications, Special Issue on Queueing Models of Manufacturing Systems
, vol.12
, Issue.1-2
, pp. 3-94
-
-
Dallery, Y.1
Gershwin, S.B.2
-
2
-
-
0006454725
-
Variance of output of a tandem production system
-
Research Triangle Park, NC, Edited by R. Önvural and I. Akyildiz, Elsevier
-
2. S.B. Gershwin, Variance of output of a tandem production system, In Queuing Networks with Finite Capacity, Proceedings of The Second International Workshop, Research Triangle Park, NC, (Edited by R. Önvural and I. Akyildiz), Elsevier, (1992).
-
(1992)
Queuing Networks with Finite Capacity, Proceedings of the Second International Workshop
-
-
Gershwin, S.B.1
-
5
-
-
0025566605
-
Production rate of transfer lines without buffer storage
-
5. C. Commault and Y. Dallery, Production rate of transfer lines without buffer storage, IIE Transactions 22 (4), 315-329 (1990).
-
(1990)
IIE Transactions
, vol.22
, Issue.4
, pp. 315-329
-
-
Commault, C.1
Dallery, Y.2
-
6
-
-
0003242555
-
The throughput rate of multistation reliable production lines with no intermediate buffers
-
6. H.T. Papadopoulos, The throughput rate of multistation reliable production lines with no intermediate buffers, Operations Research, 43 (4) (1995).
-
(1995)
Operations Research
, vol.43
, Issue.4
-
-
Papadopoulos, H.T.1
-
7
-
-
0014523454
-
The effect of internal storage on the throughput of a series of stages having exponential service times
-
7. J.M. Hatcher, The effect of internal storage on the throughput of a series of stages having exponential service times, AIIE Transactions 1 (2), 150-156 (1969).
-
(1969)
AIIE Transactions
, vol.1
, Issue.2
, pp. 150-156
-
-
Hatcher, J.M.1
-
8
-
-
0023568653
-
Variance of the number of units produced on a transfer line with buffer inventories during a period of length T
-
8. G.J. Miltenburg, Variance of the number of units produced on a transfer line with buffer inventories during a period of length T, Naval Research Logistics 34, 811-822 (1987).
-
(1987)
Naval Research Logistics
, vol.34
, pp. 811-822
-
-
Miltenburg, G.J.1
-
11
-
-
0000000169
-
The output processes of serial production lines of exponential machines with finite buffers
-
11. K.B. Hendrics, The output processes of serial production lines of exponential machines with finite buffers, Operations Research 40 (6), 1139-1147 (1992).
-
(1992)
Operations Research
, vol.40
, Issue.6
, pp. 1139-1147
-
-
Hendrics, K.B.1
-
12
-
-
0027680941
-
The output processes of serial production lines of general machines with finite buffers
-
12. K.B. Hendrics and J.O. McClain, The output processes of serial production lines of general machines with finite buffers, Management Science 39 (10), 1194-1201 (1993).
-
(1993)
Management Science
, vol.39
, Issue.10
, pp. 1194-1201
-
-
Hendrics, K.B.1
McClain, J.O.2
-
13
-
-
0001242198
-
Estimating variance of output from cyclic exponential queueing systems
-
13. I. Duenyas and W. J. Hopp, Estimating variance of output from cyclic exponential queueing systems, Queueing Systems 7, 337-354 (1990).
-
(1990)
Queueing Systems
, vol.7
, pp. 337-354
-
-
Duenyas, I.1
Hopp, W.J.2
-
14
-
-
0027647549
-
Characterizing the output process of a CONWIP line with deterministic processing and random outages
-
14. I. Duenyas, W.J. Hopp and M.L. Spearman, Characterizing the output process of a CONWIP line with deterministic processing and random outages, Management Science 39 (8), 975-988 (1993).
-
(1993)
Management Science
, vol.39
, Issue.8
, pp. 975-988
-
-
Duenyas, I.1
Hopp, W.J.2
Spearman, M.L.3
-
15
-
-
0000034424
-
System-theoretic analysis of due time performance in production systems
-
15. D. Jacobs and S.M. Meerkov, System-theoretic analysis of due time performance in production systems, Mathematical Problems in Engineering 1, 225 (1995).
-
(1995)
Mathematical Problems in Engineering
, vol.1
, pp. 225
-
-
Jacobs, D.1
Meerkov, S.M.2
-
16
-
-
0013530533
-
-
Koç University, Working Paper Series 97-19, Istanbul, Turkey
-
16. B. Tan, Variance of the output as a function of time: Production line dynamics, Koç University, Working Paper Series 97-19, Istanbul, Turkey, (1997).
-
(1997)
Variance of the Output as a Function of Time: Production Line Dynamics
-
-
Tan, B.1
-
17
-
-
0031220337
-
Variance of the throughput of an N-station production line with no intermediate buffers and time dependent failures
-
17. B. Tan, Variance of the throughput of an N-station production line with no intermediate buffers and time dependent failures, European Journal of Operational Research 101 (3), 560-576 (1997).
-
(1997)
European Journal of Operational Research
, vol.101
, Issue.3
, pp. 560-576
-
-
Tan, B.1
-
18
-
-
0032031154
-
An analytic formula for variance of output from a series-parallel production system with no interstation buffers and time-dependent failures
-
18. B. Tan, An analytic formula for variance of output from a series-parallel production system with no interstation buffers and time-dependent failures, Mathl. Comput. Modelling 27 (6), 95-112 (1998).
-
(1998)
Mathl. Comput. Modelling
, vol.27
, Issue.6
, pp. 95-112
-
-
Tan, B.1
-
19
-
-
0032484451
-
Effects of variability on the due time performance of a continuous materials flow production system in series
-
19. B. Tan, Effects of variability on the due time performance of a continuous materials flow production system in series, International Journal of Production Economics 54, 87-100 (1998).
-
(1998)
International Journal of Production Economics
, vol.54
, pp. 87-100
-
-
Tan, B.1
|