메뉴 건너뛰기




Volumn 6, Issue 2, 1999, Pages 67-82

Torsional failure of a wire rope mooring line during installation in deep water

Author keywords

Fatigue assessment; Fatigue design; Load history; Offshore failures; Rope failures

Indexed keywords

FAILURE ANALYSIS; FATIGUE OF MATERIALS; OFFSHORE STRUCTURES; ROPE; TENSILE STRESS; TORQUE; TORSIONAL STRESS;

EID: 0033117916     PISSN: 13506307     EISSN: None     Source Type: Journal    
DOI: 10.1016/S1350-6307(98)00043-0     Document Type: Article
Times cited : (30)

References (10)
  • 3
    • 0016882488 scopus 로고
    • The relationship between torque, tensile force and twist in ropes
    • Kollros W. The relationship between torque, tensile force and twist in ropes. Wire 1976;19-24.
    • (1976) Wire , pp. 19-24
    • Kollros, W.1
  • 4
    • 0344990186 scopus 로고
    • Torque and torsional stiffness of wire rope parts I and II
    • Feyrer K, Schiffner G. Torque and torsional stiffness of wire rope parts I and II. Wire 1986;36(8):318-20 and 1987;37:23-7.
    • (1986) Wire , vol.36 , Issue.8 , pp. 318-20
    • Feyrer, K.1    Schiffner, G.2
  • 5
    • 0345719061 scopus 로고
    • and
    • Feyrer K, Schiffner G. Torque and torsional stiffness of wire rope parts I and II. Wire 1986;36(8):318-20 and 1987;37:23-7.
    • (1987) Wire , vol.37 , pp. 23-27
  • 6
    • 30844462325 scopus 로고
    • The manufacture and current development of wire rope for the South African mining industry
    • Canadian Institute of Mining and Metallurgy Toronto, Canada, June
    • Wainwright EJ. The manufacture and current development of wire rope for the South African mining industry. Proceedings of the International Conference on Hoisting of Men, Materials and Minerals. Canadian Institute of Mining and Metallurgy Toronto, Canada, June 1988.
    • (1988) Proceedings of the International Conference on Hoisting of Men, Materials and Minerals
    • Wainwright, E.J.1
  • 10
    • 0344856196 scopus 로고    scopus 로고
    • Torsion problems caused by wire rope during mooring installation operations in deep water
    • IBC Aberdeen, June
    • Chaplin CR. Torsion problems caused by wire rope during mooring installation operations in deep water. Proceedings of the Mooring and Anchoring. IBC Aberdeen, June 1998.
    • (1998) Proceedings of the Mooring and Anchoring
    • Chaplin, C.R.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.