메뉴 건너뛰기




Volumn 34, Issue 2, 1998, Pages 197-204

Factors impacting construction project duration: A comparison between France, Germany and the u.k.

Author keywords

[No Author keywords available]

Indexed keywords

CONCRETE BUILDINGS; CONSTRUCTION INDUSTRY; ENGINEERS; SURVEYS;

EID: 0033102025     PISSN: 03601323     EISSN: None     Source Type: Journal    
DOI: 10.1016/s0360-1323(98)00004-3     Document Type: Article
Times cited : (36)

References (27)
  • 2
    • 0007787079 scopus 로고
    • The Shame and the Sham
    • August 12
    • Arcy, J. The Shame and the Sham. Contract Journal, August 12, 1993.
    • (1993) Contract Journal
    • Arcy, J.1
  • 4
    • 0039405933 scopus 로고
    • Department of the Environment London: Government Statistical Service
    • Department of the Environment. Digest of Data for the Construction Industry 2nd edn. London: Government Statistical Service, 1995.
    • (1995) Digest of Data for the Construction Industry 2nd Edn.
  • 6
    • 0041185226 scopus 로고    scopus 로고
    • Productivity Rates and Construction Methods for High-Rise Concrete Construction: A Comparative Evaluation of U.K., German and French Contractors
    • In press
    • Proverbs DG, Holt GD, Olomolaiye PO. Productivity Rates and Construction Methods for High-Rise Concrete Construction: A Comparative Evaluation of U.K., German and French Contractors. Construction Management and Economics, 1997. In press.
    • (1997) Construction Management and Economics
    • Proverbs, D.G.1    Holt, G.D.2    Olomolaiye, P.O.3
  • 7
    • 0039405932 scopus 로고    scopus 로고
    • A Comparative Evaluation of Concrete Placing Productivity Rates Amongst French, German and U.K. Construction Contractors
    • In press
    • Proverbs DG, Holt GD, Olomolaiye PO. A Comparative Evaluation of Concrete Placing Productivity Rates Amongst French, German and U.K. Construction Contractors. Engineering, Construction and Architectural Management, 1997. In press.
    • (1997) Engineering, Construction and Architectural Management
    • Proverbs, D.G.1    Holt, G.D.2    Olomolaiye, P.O.3
  • 11
    • 0040280613 scopus 로고    scopus 로고
    • Materials Handling on High Rise Insitu Concrete Projects: A European Perspective
    • under review
    • Proverbs DG, Holt GD, Olomolaiye PO. Materials Handling on High Rise Insitu Concrete Projects: A European Perspective. Building and Environment, 1998; under review.
    • (1998) Building and Environment
    • Proverbs, D.G.1    Holt, G.D.2    Olomolaiye, P.O.3
  • 12
    • 0002577442 scopus 로고    scopus 로고
    • Scaffolding for high rise concrete construction: A French, German and British comparison
    • Proverbs DG, Holt DG, Olomolaiye PO. Scaffolding for high rise concrete construction: A French, German and British comparison. ICE: Proceedings - Structure and Buildings, 1998;128(1):59-66.
    • (1998) ICE: Proceedings - Structure and Buildings , vol.128 , Issue.1 , pp. 59-66
    • Proverbs, D.G.1    Holt, D.G.2    Olomolaiye, P.O.3
  • 13
    • 84993056861 scopus 로고    scopus 로고
    • Formwork for High Rise Concrete Construction: A French, German and British Comparison
    • under review
    • Proverbs DG, Holt GD, Olomolaiye PO. Formwork for High Rise Concrete Construction: A French, German and British Comparison. Building Research and Information, 1997; under review.
    • (1997) Building Research and Information
    • Proverbs, D.G.1    Holt, G.D.2    Olomolaiye, P.O.3
  • 27
    • 0039688757 scopus 로고
    • The Business Round .Table. Scheduled Overtime Effect on Construction Projects
    • New York
    • The Business Round .Table. Scheduled Overtime Effect on Construction Projects. Construction Industry Cost Effectiveness Report C-2, New York, 1991.
    • (1991) Construction Industry Cost Effectiveness Report C-2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.