메뉴 건너뛰기




Volumn 14, Issue 1, 1999, Pages 23-28

Leveling reliability in systems with large hydro resources

Author keywords

Hydroelectric power generation; Reliability analysis; Scheduling. Maintenance; Uncertainty

Indexed keywords

ELECTRIC LOAD FORECASTING; ELECTRIC POWER GENERATION; MAINTENANCE; PROBABILITY; RANDOM PROCESSES; RELIABILITY; SCHEDULING; STRATEGIC PLANNING;

EID: 0033080129     PISSN: 08858950     EISSN: None     Source Type: Journal    
DOI: 10.1109/59.744479     Document Type: Article
Times cited : (7)

References (16)


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.