1
-
-
0344691251
-
Conservation of auxiliary power (works power) in coal fired TPS
-
IIT Delhi, 14-17 December
-
Bhatt, M.S., Mandi, R.P. and Thyagarajan, K. (1994). 'Conservation of auxiliary power (works power) in coal fired TPS', Proc. 8th National Power System Conf., IIT Delhi, 14-17 December, pp. 456-460.
-
(1994)
Proc. 8th National Power System Conf.
, pp. 456-460
-
-
Bhatt, M.S.1
Mandi, R.P.2
Thyagarajan, K.3
-
3
-
-
0024134338
-
Modular assembly concept for high pressure pumps used in energy generation and process engineering
-
Groll, H., Liegat, S. and Bitterwolf, F. (1988). 'Modular assembly concept for high pressure pumps used in energy generation and process engineering', Sulzer Tech. Rev., 70 (4/88), 11-14.
-
(1988)
Sulzer Tech. Rev.
, vol.70
, Issue.4-88
, pp. 11-14
-
-
Groll, H.1
Liegat, S.2
Bitterwolf, F.3
-
4
-
-
4243501999
-
Erosion wear in TPS
-
Central Power Research Institute, Bangalore, 7-8 December 1989
-
Krishnamoorthy, P.R., Seetharamu, S. and Sampathkumaran, P. (1989a). 'Erosion wear in TPS', Proc. Workshop on Wear and Erosion of Materials in Thermal Power Stations, Central Power Research Institute, Bangalore, 7-8 December 1989, pp. 2H1-2H7.
-
(1989)
Proc. Workshop on Wear and Erosion of Materials in Thermal Power Stations
-
-
Krishnamoorthy, P.R.1
Seetharamu, S.2
Sampathkumaran, P.3
-
5
-
-
4243501999
-
Abrasive minerals in Indian coals
-
Central Power Research Institute, Bangalore, 7-8 December 1989
-
Krishnamoorthy, P.R., Seetharamu, S. and Rajalakshmi, P.S. (1989b). 'Abrasive minerals in Indian coals', Proc. Workshop on Wear and Erosion of Materials in Thermal Power Stations, Central Power Research Institute, Bangalore, 7-8 December 1989, pp. 2I1-2I10.
-
(1989)
Proc. Workshop on Wear and Erosion of Materials in Thermal Power Stations
-
-
Krishnamoorthy, P.R.1
Seetharamu, S.2
Rajalakshmi, P.S.3
-
6
-
-
0345553297
-
-
Sulzer Brothers Ltd., Pumps Division, Winterthur, Switzerland
-
Laux, C.H., Burchhart, U. and Kristein, U. (1997). 'Replacement of the BFPs During the Retrofit of 500 MW Units at a German Power Station', Sulzer Brothers Ltd., Pumps Division, Winterthur, Switzerland.
-
(1997)
Replacement of the BFPs During the Retrofit of 500 MW Units at a German Power Station
-
-
Laux, C.H.1
Burchhart, U.2
Kristein, U.3
-
7
-
-
85041145501
-
-
Sulzer Brothers Ltd., Pumps Division, Winterthur, Switzerland
-
Laux, C.H. and Bolleter, U. (1991). 'Comparison of Various Boiler Feed Pump Designs used in Fossil Fired Power Stations', Sulzer Brothers Ltd., Pumps Division, Winterthur, Switzerland.
-
(1991)
Comparison of Various Boiler Feed Pump Designs Used in Fossil Fired Power Stations
-
-
Laux, C.H.1
Bolleter, U.2
-
8
-
-
0345121949
-
-
Litton Educational Publishing Inc., New York
-
Morse, F.T. (1953). Power Plant Engineering, Litton Educational Publishing Inc., New York, p. 125.
-
(1953)
Power Plant Engineering
, pp. 125
-
-
Morse, F.T.1
|