메뉴 건너뛰기




Volumn 34, Issue 1, 1998, Pages 43-48

A method for estimating labour requirements and costs for international construction projects at inception

Author keywords

Cost planning; ; In situ concrete construction; International comparison; ; Labour resources; ; Productivityrates;

Indexed keywords

BUILDINGS; COSTS; PLANNING; PRODUCTIVITY; PROJECT MANAGEMENT;

EID: 0032763327     PISSN: 03601323     EISSN: None     Source Type: Journal    
DOI: 10.1016/s0360-1323(97)00064-4     Document Type: Article
Times cited : (18)

References (18)
  • 5
    • 0039096496 scopus 로고
    • Royal Institute of Chartered Surveyors, RICS, Kingston-upon-Thames, Surrey
    • Royal Institute of Chartered Surveyors, The Building Cost Information Service, RICS, Kingston-upon-Thames, Surrey, 1991.
    • (1991) The Building Cost Information Service
  • 13
    • 0041185226 scopus 로고    scopus 로고
    • Productivity rates and construction methods for high-rise concrete construction: A comparative evaluation of UK, German and French contractors
    • in press
    • Proverbs DG, Holt GD, Olomolaiye PO. Productivity rates and construction methods for high-rise concrete construction: a comparative evaluation of UK, German and French contractors. Construction Management and Economics, 1997, in press.
    • (1997) Construction Management and Economics
    • Proverbs, D.G.1    Holt, G.D.2    Olomolaiye, P.O.3
  • 14
    • 0039688660 scopus 로고
    • The Builder Group, ABI Top 40. Building
    • The Builder Group, ABI Top 40. Building, 1994.
    • (1994)
  • 17
    • 0040874814 scopus 로고
    • The Builder Group, European Costings
    • The Builder Group, European Costings. March. 25:1994;44-47.
    • (1994) March , vol.25 , pp. 44-47


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.