-
2
-
-
0023364958
-
Predict control of structures
-
J. Rodellar, H. Barbat Alex, M. Martin-Saanchez Juan, 'Predict control of structures', J. Engng. Mech. 113(6), 797-812 (1987).
-
(1987)
J. Engng. Mech.
, vol.113
, Issue.6
, pp. 797-812
-
-
Rodellar, J.1
Barbat Alex, H.2
Martin-Saanchez Juan, M.3
-
3
-
-
0024707753
-
Experimental study of active control for MDOF seismic structures
-
L. L. Chung, R. C. Lin, T. T. Soong and A. M. Reihorn, 'Experimental study of active control for MDOF seismic structures', J. Engng. Mech. ASCE 115(8), 1609-1627 (1989).
-
(1989)
J. Engng. Mech. ASCE
, vol.115
, Issue.8
, pp. 1609-1627
-
-
Chung, L.L.1
Lin, R.C.2
Soong, T.T.3
Reihorn, A.M.4
-
4
-
-
0344512963
-
A discontinuous control method for civil engineering structures
-
J. N. Yang, Z. Li, J. C. Wu and K. K. D. Young, 'A discontinuous control method for civil engineering structures', Dynamics and Control of Large Structures, Proc. 9th VPI$SU Symp. on Dynamics and Control of Large Structures, 1993, pp. 167-180.
-
(1993)
Dynamics and Control of Large Structures, Proc. 9th VPI$SU Symp. on Dynamics and Control of Large Structures
, pp. 167-180
-
-
Yang, J.N.1
Li, Z.2
Wu, J.C.3
Young, K.K.D.4
-
5
-
-
0028184463
-
Robust control techniques for building under earthquake excitations
-
M. Schmitendorf, F. Jabbari and J. N. Yang, 'Robust control techniques for building under earthquake excitations', J. Earthquake Engng. Struct. Dyn. 23(5), 539-552 (1994).
-
(1994)
J. Earthquake Engng. Struct. Dyn.
, vol.23
, Issue.5
, pp. 539-552
-
-
Schmitendorf, M.1
Jabbari, F.2
Yang, J.N.3
-
6
-
-
0023965399
-
Experiment on active control of seismic structures
-
L. L. Chung, A. M. Reihorn and T. T. Soong, 'Experiment on active control of seismic structures', J. Engng. Mech. ASCE 114(2), 241-256 (1988).
-
(1988)
J. Engng. Mech. ASCE
, vol.114
, Issue.2
, pp. 241-256
-
-
Chung, L.L.1
Reihorn, A.M.2
Soong, T.T.3
-
7
-
-
0003398595
-
Experimental verification of acceleration feedback control strategies for a active tendon system
-
Buffalo, N.Y
-
S. J. Dyke, B. F. Spencer, P. Quast, M. K. Sain, D. C. Kaspari and T. T. Soong, 'Experimental verification of acceleration feedback control strategies for a active tendon system', Nat. Ctr. For Earthquake Engrg. Res., Rep. NCEER-94-0024, Buffalo, N.Y, 1994.
-
(1994)
Nat. Ctr. For Earthquake Engrg. Res., Rep. NCEER-94-0024
-
-
Dyke, S.J.1
Spencer, B.F.2
Quast, P.3
Sain, M.K.4
Kaspari, D.C.5
Soong, T.T.6
-
8
-
-
4243185061
-
Acceleration feedback control of MDOF structure
-
S. J. Dyke, B. F. Spencer, P. Quast, M. K. Sain, D. C. Kaspari and T. T. Soong, 'Acceleration feedback control of MDOF structure', J. Engng. Mech. 112(9), 907-918 (1996).
-
(1996)
J. Engng. Mech.
, vol.112
, Issue.9
, pp. 907-918
-
-
Dyke, S.J.1
Spencer, B.F.2
Quast, P.3
Sain, M.K.4
Kaspari, D.C.5
Soong, T.T.6
-
9
-
-
0026254375
-
Full-scaled implementation of active control: Design and simulation
-
T. T. Soong, A. M. Reihorn, Y. P. Wang and R. C. Lin, 'Full-scaled implementation of active control: design and simulation', J. Struct. Engng. 117(11), 3516-3537 (1991).
-
(1991)
J. Struct. Engng.
, vol.117
, Issue.11
, pp. 3516-3537
-
-
Soong, T.T.1
Reihorn, A.M.2
Wang, Y.P.3
Lin, R.C.4
-
10
-
-
0027788361
-
Full-scaled implementation of active control: Installation and performance
-
A. M. Reihorn, T. T. Soong, Y. P. Wang and R. C. Lin, 'Full-scaled implementation of active control: installation and performance', J. Struct. Engng. 119(6), 1935-1960 (1993).
-
(1993)
J. Struct. Engng.
, vol.119
, Issue.6
, pp. 1935-1960
-
-
Reihorn, A.M.1
Soong, T.T.2
Wang, Y.P.3
Lin, R.C.4
-
11
-
-
0018458906
-
Direct output feedback control of large space structures
-
M. J. Balas, 'Direct output feedback control of large space structures', J. Astro-nautical Sci. AAS 27(2), 157-180 (1979).
-
(1979)
J. Astro-nautical Sci. AAS
, vol.27
, Issue.2
, pp. 157-180
-
-
Balas, M.J.1
-
12
-
-
0031235760
-
Kalman filter approach for the control of seismic-induced building vibration using active mass damper systems
-
C. H. Loh and P. Y. Lin, 'Kalman filter approach for the control of seismic-induced building vibration using active mass damper systems', Struct. Des. Tall Buildings 6, 209-224 (1997).
-
(1997)
Struct. Des. Tall Buildings
, vol.6
, pp. 209-224
-
-
Loh, C.H.1
Lin, P.Y.2
-
13
-
-
0344081770
-
-
2 WCSC, Kyoto, June
-
C. H. Loh, P. Y. Lin, J. C. Wu and J. N. Yang, 'Experimental verification of static-output-feedback control for a seismic-excited full scale building', 2 WCSC, Kyoto, June 1998.
-
(1998)
Experimental Verification of Static-output-feedback Control for a Seismic-excited Full Scale Building
-
-
Loh, C.H.1
Lin, P.Y.2
Wu, J.C.3
Yang, J.N.4
-
14
-
-
0002625911
-
Experimental verification of H-infinity and sliding mode control for seismic-excited building
-
J. N. Yang, J. C. Wu, A. M. Reihorn, W. E. Schmitendor and F. Jabbari, 'Experimental verification of H-infinity and sliding mode control for seismic-excited building', Proc. 1st World Conf. Struct. Control, TP4, 1994, pp. 63-72.
-
(1994)
Proc. 1st World Conf. Struct. Control
, vol.TP4
, pp. 63-72
-
-
Yang, J.N.1
Wu, J.C.2
Reihorn, A.M.3
Schmitendor, W.E.4
Jabbari, F.5
|