메뉴 건너뛰기




Volumn 63, Issue 1, 1999, Pages 73-90

The event sequence diagram framework for dynamic probabilistic risk assessment

Author keywords

[No Author keywords available]

Indexed keywords

ALGORITHMS; COMPUTER SYSTEM RECOVERY; FAILURE ANALYSIS; MAN MACHINE SYSTEMS; PROBABILITY; RELIABILITY; RISK ASSESSMENT;

EID: 0032710909     PISSN: 09518320     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0951-8320(98)00027-1     Document Type: Article
Times cited : (116)

References (19)
  • 1
    • 0026884986 scopus 로고
    • Probabilistic reactor dynamics. I: The theory of continuous event trees
    • Devooght J, Smidts C Probabilistic reactor dynamics. I: The theory of continuous event trees. Nuclear Science and Engineering, 1992;111:229-240.
    • (1992) Nuclear Science and Engineering , vol.111 , pp. 229-240
    • Devooght, J.1    Smidts, C.2
  • 2
    • 0030173437 scopus 로고    scopus 로고
    • The Dylam approach to the dynamic reliability analysis of systems
    • Cojazzi G The Dylam approach to the dynamic reliability analysis of systems. Reliability Engineering and System Safety, 1996;52:279-296.
    • (1996) Reliability Engineering and System Safety , vol.52 , pp. 279-296
    • Cojazzi, G.1
  • 3
    • 0027885377 scopus 로고
    • Dynamic event trees in accident sequence analysis: Application to steam generator tube rupture
    • Acosta C, Siu N Dynamic event trees in accident sequence analysis: application to steam generator tube rupture. Reliability Engineering and System Safety, 1993;41:1.
    • (1993) Reliability Engineering and System Safety , vol.41 , pp. 1
    • Acosta, C.1    Siu, N.2
  • 7
    • 4344690223 scopus 로고
    • Reliability and safety assessment of dynamic process systems
    • Springer
    • Aldemir T, Siu N, Cacciabue P, Goktepe B, editors. Reliability and safety assessment of dynamic process systems, NATO ASI Series, Vol. 120. Springer, 1994.
    • (1994) NATO ASI Series , vol.120
    • Aldemir, T.1    Siu, N.2    Cacciabue, P.3    Goktepe, B.4
  • 8
    • 0028197894 scopus 로고
    • Risk assessment for dynamic systems: An overview
    • Siu N Risk assessment for dynamic systems: an overview. Reliability Engineering and System Safety, 1994;43(1):43-73.
    • (1994) Reliability Engineering and System Safety , vol.43 , Issue.1 , pp. 43-73
    • Siu, N.1
  • 10
    • 0042970464 scopus 로고
    • Prepared for Public Service Company of New Hampshire and Yankee Atomic Electric Company, Newport Beach, CA, USA
    • Pickard, Lowe and Garrick Inc. Seabrook Station Probabilistic Safety Assessment, PLG-0300. Prepared for Public Service Company of New Hampshire and Yankee Atomic Electric Company, Newport Beach, CA, USA, 1983.
    • (1983) Seabrook Station Probabilistic Safety Assessment, PLG-0300
  • 13
    • 9344263962 scopus 로고
    • A Probabilistic Evaluation of the Safety of Babcox and Wilcox Nuclear Reactor Power Plants with Emphasis on Historically Observed Operational Events
    • USNRC, Washington, DC
    • Hsu CJ et al. A Probabilistic Evaluation of the Safety of Babcox and Wilcox Nuclear Reactor Power Plants with Emphasis on Historically Observed Operational Events, NUREG-1150, USNRC, Washington, DC, 1991.
    • (1991) NUREG-1150
    • Hsu, C.J.1
  • 14
    • 9344225066 scopus 로고
    • Severe Accident Risks: An Assessment of Five US Nuclear Power Plants
    • USNRC, Washington, DC
    • US Nuclear Regulatory Commission, Severe Accident Risks: An Assessment of Five US Nuclear Power Plants, NUREG-1150, USNRC, Washington, DC, 1991.
    • (1991) NUREG-1150
  • 16
    • 0031244901 scopus 로고    scopus 로고
    • The Cassini mission probabilistic risk analysis: Comparison of two probabilistic dynamic methodologies
    • Swaminathan S, Smidts C et al. The Cassini mission probabilistic risk analysis: comparison of two probabilistic dynamic methodologies. Reliability Engineering and System Safety, 1997;58.
    • (1997) Reliability Engineering and System Safety , pp. 58
    • Swaminathan, S.1    Smidts, C.2
  • 19
    • 0026449522 scopus 로고
    • Comparison of the small and large event tree approaches used in PRAs
    • Rasmusson D A comparison of the small and large event tree approaches used in PRAs. Reliability Engineering and System Safety, 1992;37:79-90.
    • (1992) Reliability Engineering and System Safety , vol.37 , pp. 79-90
    • Rasmusson, D.A.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.