메뉴 건너뛰기




Volumn 31, Issue 2, 1999, Pages 125-134

A heuristic for production scheduling and inventory control in the presence of sequence-dependent setup times

Author keywords

[No Author keywords available]

Indexed keywords

HEURISTIC METHODS; INTEGER PROGRAMMING; INVENTORY CONTROL; JOB ANALYSIS; PROBLEM SOLVING; SCHEDULING;

EID: 0032682335     PISSN: 0740817X     EISSN: 15458830     Source Type: Journal    
DOI: 10.1080/07408179908969811     Document Type: Article
Times cited : (29)

References (16)
  • 1
    • 0024736520 scopus 로고
    • On the complexity of scheduling with batch setup times
    • Monma, C.L., and Potts, C.N., (1989) On the complexity of scheduling with batch setup times. Operations Research, 37, 798–804.
    • (1989) Operations Research , vol.37 , pp. 798-804
    • Monma, C.L.1    Potts, C.N.2
  • 2
    • 0025434528 scopus 로고
    • A strong cutting plane algorithm for production scheduling with changeover costs
    • Magnanti, T.L., and Vachani, R., (1990) A strong cutting plane algorithm for production scheduling with changeover costs. Operations Research, 38, 456–473.
    • (1990) Operations Research , vol.38 , pp. 456-473
    • Magnanti, T.L.1    Vachani, R.2
  • 4
    • 0027545176 scopus 로고
    • A general algorithm for short-term scheduling of batch operations-I. MILP formulation
    • Kondili, E., Pantelides, C.C., and Sargent, R.W.H., (1993) A general algorithm for short-term scheduling of batch operations-I. MILP formulation. Computers and Chemical Engineering, 17, 211–227.
    • (1993) Computers and Chemical Engineering , vol.17 , pp. 211-227
    • Kondili, E.1    Pantelides, C.C.2    Sargent, R.W.H.3
  • 5
    • 0027545175 scopus 로고
    • A general algorithm for short-term scheduling of batch operations-II
    • computational issues
    • Shah, N., Pantelides, C.C., and Sargert, R.W.H., (1993) A general algorithm for short-term scheduling of batch operations-II. computational issues. Computers and Chemical Engineering, 17, 229–244.
    • (1993) Computers and Chemical Engineering , vol.17 , pp. 229-244
    • Shah, N.1    Pantelides, C.C.2    Sargert, R.W.H.3
  • 6
    • 77957088268 scopus 로고
    • Mathematical programming models and methods for production planning and scheduling
    • Graves, S.C., Rinnooy Kan, A.H.G. and Zipkin, P.H. (eds.), North Holland, Amsterdam
    • Shapiro, J., (1993) Mathematical programming models and methods for production planning and scheduling, in Logistics of Production and Inventory, Graves, S.C., Rinnooy Kan, A.H.G. and Zipkin, P.H. (eds.), North Holland, Amsterdam, pp. 371–443.
    • (1993) Logistics of Production and Inventory , pp. 371-443
    • Shapiro, J.1
  • 7
    • 0028501041 scopus 로고
    • Heuristic algorithm for scheduling batch and semi-continuous plants with production deadlines intermediate storage limitations and equipment changeover costs
    • Kudva, G., Elkamel, A., and Reklaitis, G.V., (1994) Heuristic algorithm for scheduling batch and semi-continuous plants with production deadlines intermediate storage limitations and equipment changeover costs. Computers and Chemical Engineering, 18, 859–875.
    • (1994) Computers and Chemical Engineering , vol.18 , pp. 859-875
    • Kudva, G.1    Elkamel, A.2    Reklaitis, G.V.3
  • 8
    • 0028452709 scopus 로고
    • Rolling horizon algorithms for a single-machine dynamic scheduling problem with sequence-dependent setup times
    • Ovacik, I.M., and Uzsoy, R., (1994) Rolling horizon algorithms for a single-machine dynamic scheduling problem with sequence-dependent setup times. International Journal of Production Research, 32, 1243–1263.
    • (1994) International Journal of Production Research , vol.32 , pp. 1243-1263
    • Ovacik, I.M.1    Uzsoy, R.2
  • 10
    • 0003494532 scopus 로고
    • An integrated approach in production planning and scheduling
    • Dauzère-Péres and Laserre, Springer Verlag, Berlin
    • Dauzère-Péres and Laserre (1994) An integrated approach in production planning and scheduling, Lecture Notes in Economics and Mathematical Systems, Springer Verlag, Berlin.
    • (1994) Lecture Notes in Economics and Mathematical Systems
  • 11
    • 0031525145 scopus 로고    scopus 로고
    • Rescheduling on a single machine with part-type dependent setup times and deadlines
    • Unal, A.T., Uzsoy, R., and Kiran, A.S., (1997) Rescheduling on a single machine with part-type dependent setup times and deadlines. Annals of Operations Research, 70, 93–113.
    • (1997) Annals of Operations Research , vol.70 , pp. 93-113
    • Unal, A.T.1    Uzsoy, R.2    Kiran, A.S.3
  • 12
    • 0029404198 scopus 로고
    • Rolling horizon procedures for dynamic parallel machine problems with sequence dependent setup times
    • Ovacik, J.M., and Uzsoy, R., (1995) Rolling horizon procedures for dynamic parallel machine problems with sequence dependent setup times. International Journal of Production Research, 33, 3173–3192.
    • (1995) International Journal of Production Research , vol.33 , pp. 3173-3192
    • Ovacik, J.M.1    Uzsoy, R.2
  • 13
    • 0031531273 scopus 로고    scopus 로고
    • Fast computational procedure for solving multi-item single-machine lot scheduling optimization problems
    • Aragone, L.S., and Gonzalez, R.L.V., (1997) Fast computational procedure for solving multi-item single-machine lot scheduling optimization problems. Journal of Optimization Theory and Applications, 93, 491–551.
    • (1997) Journal of Optimization Theory and Applications , vol.93 , pp. 491-551
    • Aragone, L.S.1    Gonzalez, R.L.V.2
  • 15
    • 0000204502 scopus 로고
    • A general framework for modeling production
    • Hackman, ST., and Leachman, R.C., (1989) A general framework for modeling production. Management Science, 35, 478–495.
    • (1989) Management Science , vol.35 , pp. 478-495
    • Hackman, S.T.1    Leachman, R.C.2
  • 16
    • 85023840491 scopus 로고    scopus 로고
    • Kluwer, Boston, MA
    • Glover, F., and Laguna, M., (1997) Tabu Search, Kluwer, Boston, MA.
    • (1997)
    • Glover, F.1    Laguna, M.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.