-
1
-
-
0024736520
-
On the complexity of scheduling with batch setup times
-
Monma, C.L., and Potts, C.N., (1989) On the complexity of scheduling with batch setup times. Operations Research, 37, 798–804.
-
(1989)
Operations Research
, vol.37
, pp. 798-804
-
-
Monma, C.L.1
Potts, C.N.2
-
2
-
-
0025434528
-
A strong cutting plane algorithm for production scheduling with changeover costs
-
Magnanti, T.L., and Vachani, R., (1990) A strong cutting plane algorithm for production scheduling with changeover costs. Operations Research, 38, 456–473.
-
(1990)
Operations Research
, vol.38
, pp. 456-473
-
-
Magnanti, T.L.1
Vachani, R.2
-
3
-
-
0002436722
-
Batch sequencing
-
Unal, AT., and Kiran, A.S., (1992) Batch sequencing. HE Transactions, 24, 73–83.
-
(1992)
HE Transactions
, vol.24
, pp. 73-83
-
-
Unal, A.T.1
Kiran, A.S.2
-
4
-
-
0027545176
-
A general algorithm for short-term scheduling of batch operations-I. MILP formulation
-
Kondili, E., Pantelides, C.C., and Sargent, R.W.H., (1993) A general algorithm for short-term scheduling of batch operations-I. MILP formulation. Computers and Chemical Engineering, 17, 211–227.
-
(1993)
Computers and Chemical Engineering
, vol.17
, pp. 211-227
-
-
Kondili, E.1
Pantelides, C.C.2
Sargent, R.W.H.3
-
5
-
-
0027545175
-
A general algorithm for short-term scheduling of batch operations-II
-
computational issues
-
Shah, N., Pantelides, C.C., and Sargert, R.W.H., (1993) A general algorithm for short-term scheduling of batch operations-II. computational issues. Computers and Chemical Engineering, 17, 229–244.
-
(1993)
Computers and Chemical Engineering
, vol.17
, pp. 229-244
-
-
Shah, N.1
Pantelides, C.C.2
Sargert, R.W.H.3
-
6
-
-
77957088268
-
Mathematical programming models and methods for production planning and scheduling
-
Graves, S.C., Rinnooy Kan, A.H.G. and Zipkin, P.H. (eds.), North Holland, Amsterdam
-
Shapiro, J., (1993) Mathematical programming models and methods for production planning and scheduling, in Logistics of Production and Inventory, Graves, S.C., Rinnooy Kan, A.H.G. and Zipkin, P.H. (eds.), North Holland, Amsterdam, pp. 371–443.
-
(1993)
Logistics of Production and Inventory
, pp. 371-443
-
-
Shapiro, J.1
-
7
-
-
0028501041
-
Heuristic algorithm for scheduling batch and semi-continuous plants with production deadlines intermediate storage limitations and equipment changeover costs
-
Kudva, G., Elkamel, A., and Reklaitis, G.V., (1994) Heuristic algorithm for scheduling batch and semi-continuous plants with production deadlines intermediate storage limitations and equipment changeover costs. Computers and Chemical Engineering, 18, 859–875.
-
(1994)
Computers and Chemical Engineering
, vol.18
, pp. 859-875
-
-
Kudva, G.1
Elkamel, A.2
Reklaitis, G.V.3
-
8
-
-
0028452709
-
Rolling horizon algorithms for a single-machine dynamic scheduling problem with sequence-dependent setup times
-
Ovacik, I.M., and Uzsoy, R., (1994) Rolling horizon algorithms for a single-machine dynamic scheduling problem with sequence-dependent setup times. International Journal of Production Research, 32, 1243–1263.
-
(1994)
International Journal of Production Research
, vol.32
, pp. 1243-1263
-
-
Ovacik, I.M.1
Uzsoy, R.2
-
10
-
-
0003494532
-
An integrated approach in production planning and scheduling
-
Dauzère-Péres and Laserre, Springer Verlag, Berlin
-
Dauzère-Péres and Laserre (1994) An integrated approach in production planning and scheduling, Lecture Notes in Economics and Mathematical Systems, Springer Verlag, Berlin.
-
(1994)
Lecture Notes in Economics and Mathematical Systems
-
-
-
11
-
-
0031525145
-
Rescheduling on a single machine with part-type dependent setup times and deadlines
-
Unal, A.T., Uzsoy, R., and Kiran, A.S., (1997) Rescheduling on a single machine with part-type dependent setup times and deadlines. Annals of Operations Research, 70, 93–113.
-
(1997)
Annals of Operations Research
, vol.70
, pp. 93-113
-
-
Unal, A.T.1
Uzsoy, R.2
Kiran, A.S.3
-
12
-
-
0029404198
-
Rolling horizon procedures for dynamic parallel machine problems with sequence dependent setup times
-
Ovacik, J.M., and Uzsoy, R., (1995) Rolling horizon procedures for dynamic parallel machine problems with sequence dependent setup times. International Journal of Production Research, 33, 3173–3192.
-
(1995)
International Journal of Production Research
, vol.33
, pp. 3173-3192
-
-
Ovacik, J.M.1
Uzsoy, R.2
-
13
-
-
0031531273
-
Fast computational procedure for solving multi-item single-machine lot scheduling optimization problems
-
Aragone, L.S., and Gonzalez, R.L.V., (1997) Fast computational procedure for solving multi-item single-machine lot scheduling optimization problems. Journal of Optimization Theory and Applications, 93, 491–551.
-
(1997)
Journal of Optimization Theory and Applications
, vol.93
, pp. 491-551
-
-
Aragone, L.S.1
Gonzalez, R.L.V.2
-
14
-
-
0003394967
-
-
Dekker, New York. ch. 9
-
Evans, J., and Minieka, E., (1992) Optimization Algorithms for Networks and Graphs, 2nd edn., Dekker, New York. ch. 9.
-
(1992)
Optimization Algorithms for Networks and Graphs, 2nd edn.
-
-
Evans, J.1
Minieka, E.2
-
15
-
-
0000204502
-
A general framework for modeling production
-
Hackman, ST., and Leachman, R.C., (1989) A general framework for modeling production. Management Science, 35, 478–495.
-
(1989)
Management Science
, vol.35
, pp. 478-495
-
-
Hackman, S.T.1
Leachman, R.C.2
-
16
-
-
85023840491
-
-
Kluwer, Boston, MA
-
Glover, F., and Laguna, M., (1997) Tabu Search, Kluwer, Boston, MA.
-
(1997)
-
-
Glover, F.1
Laguna, M.2
|