-
1
-
-
0024480571
-
Simultaneous minimization of mean and variation of flow time and waiting time in single machine systems
-
Bagchi U. Simultaneous minimization of mean and variation of flow time and waiting time in single machine systems. Operations Research. 37(1):1989;118-125.
-
(1989)
Operations Research
, vol.37
, Issue.1
, pp. 118-125
-
-
Bagchi, U.1
-
2
-
-
0019582153
-
A comparison of due-date selection rules
-
Baker K.R., Bertrand J.W.M. A comparison of due-date selection rules. AIIE Transactions. 13:(2):1981;123-131.
-
(1981)
AIIE Transactions
, vol.13
, Issue.2
, pp. 123-131
-
-
Baker, K.R.1
Bertrand, J.W.M.2
-
3
-
-
0003067640
-
An investigation of due-date assignment rules with constrained tightness
-
Baker K.R., Bertrand J.W.M. An investigation of due-date assignment rules with constrained tightness. Journal of Operations Management. 1(3):1981;109-120.
-
(1981)
Journal of Operations Management
, vol.1
, Issue.3
, pp. 109-120
-
-
Baker, K.R.1
Bertrand, J.W.M.2
-
4
-
-
0021496929
-
Sequencing rules and due-date assignments in a job shop
-
Baker K.R. Sequencing rules and due-date assignments in a job shop. Management Science. 30(9):1984;1093-1103.
-
(1984)
Management Science
, vol.30
, Issue.9
, pp. 1093-1103
-
-
Baker, K.R.1
-
5
-
-
0002009274
-
A dynamic priority rule for scheduling against due-dates
-
Baker K.R., Bertrand J.W.M. A dynamic priority rule for scheduling against due-dates. Journal of Operations Management. 3(2):1982;37-42.
-
(1982)
Journal of Operations Management
, vol.3
, Issue.2
, pp. 37-42
-
-
Baker, K.R.1
Bertrand, J.W.M.2
-
7
-
-
0028730645
-
A study of factors affecting due-date predictability on a simulated dynamic job shop
-
Chang F. A study of factors affecting due-date predictability on a simulated dynamic job shop. Journal of Manufacturing Systems. 13(6):1994;393-400.
-
(1994)
Journal of Manufacturing Systems
, vol.13
, Issue.6
, pp. 393-400
-
-
Chang, F.1
-
8
-
-
0016929914
-
Due-dates in job shop scheduling
-
Eilon S., Chowdhury I.G. Due-dates in job shop scheduling. Int. J. Prod. Res. 14(2):1976;223-237.
-
(1976)
Int. J. Prod. Res.
, vol.14
, Issue.2
, pp. 223-237
-
-
Eilon, S.1
Chowdhury, I.G.2
-
9
-
-
0002835786
-
Job shops scheduling with due-dates
-
Eilon S., Hodgson R.M. Job shops scheduling with due-dates. Int. J. Prod. Res. 6(1):1967;1-13.
-
(1967)
Int. J. Prod. Res.
, vol.6
, Issue.1
, pp. 1-13
-
-
Eilon, S.1
Hodgson, R.M.2
-
10
-
-
0027657253
-
Job shop flowtime prediction and tardiness control using queuing analysis
-
Enns S.T. Job shop flowtime prediction and tardiness control using queuing analysis. Int. J. Prod. Res. 31(9):1993;2045-2057.
-
(1993)
Int. J. Prod. Res.
, vol.31
, Issue.9
, pp. 2045-2057
-
-
Enns, S.T.1
-
11
-
-
0001153814
-
A dynamic forecasting model for job shop flowtime prediction and tardiness control
-
Enns S.T. A dynamic forecasting model for job shop flowtime prediction and tardiness control. Int. J. Prod. Res. 33(5):1995;1295-1321.
-
(1995)
Int. J. Prod. Res.
, vol.33
, Issue.5
, pp. 1295-1321
-
-
Enns, S.T.1
-
13
-
-
0012298197
-
Priority dispatching with operation due-dates in a job shop
-
Kanet J.J., Hayya J.C. Priority dispatching with operation due-dates in a job shop. Journal of Operations Management. 2(3):1982;167-175.
-
(1982)
Journal of Operations Management
, vol.2
, Issue.3
, pp. 167-175
-
-
Kanet, J.J.1
Hayya, J.C.2
-
15
-
-
38249007625
-
A note on workload-dependent due-date assignment rules
-
Ragatz G.L. A note on workload-dependent due-date assignment rules. Journal of Operations Management. 8(4):1989;377-385.
-
(1989)
Journal of Operations Management
, vol.8
, Issue.4
, pp. 377-385
-
-
Ragatz, G.L.1
-
17
-
-
0026186620
-
Dynamic rules for due-date assignment
-
Vig M.M., Dooley K.J. Dynamic rules for due-date assignment. Int. J. Prod. Res. 29(7):1991;1361-1377.
-
(1991)
Int. J. Prod. Res.
, vol.29
, Issue.7
, pp. 1361-1377
-
-
Vig, M.M.1
Dooley, K.J.2
-
18
-
-
0027565391
-
Mixing static and dynamic flowtime estimates for due-date assignment
-
Nov
-
Vig MM, Dooley KJ. Mixing static and dynamic flowtime estimates for due-date assignment. Journal of Operations Management 1993;Nov:67-79.
-
(1993)
Journal of Operations Management
, pp. 67-79
-
-
Vig, M.M.1
Dooley, K.J.2
-
19
-
-
0018454859
-
A simulation study of predictable due-dates
-
Weeks J.K. A simulation study of predictable due-dates. Management Science. 25(4):1979;363-373.
-
(1979)
Management Science
, vol.25
, Issue.4
, pp. 363-373
-
-
Weeks, J.K.1
-
20
-
-
0017478424
-
A methodology for assigning minimum cost due-dates
-
Weeks J.K., Fryer J.S. A methodology for assigning minimum cost due-dates. Management Science. 23(8):1977;872-880.
-
(1977)
Management Science
, vol.23
, Issue.8
, pp. 872-880
-
-
Weeks, J.K.1
Fryer, J.S.2
|