메뉴 건너뛰기




Volumn 32, Issue 4, 1999, Pages 110-115

Using a GAMS modelling environment to solve network scheduling problems

Author keywords

[No Author keywords available]

Indexed keywords

ALGORITHMS; CONSTRAINT THEORY; NONLINEAR PROGRAMMING; OPTIMIZATION; PROBLEM SOLVING; SCHEDULING;

EID: 0032658827     PISSN: 00202940     EISSN: None     Source Type: Journal    
DOI: 10.1177/002029409903200404     Document Type: Article
Times cited : (8)

References (7)
  • 2
    • 0022010605 scopus 로고
    • CONOPT: A GRG code for large sparse dynamic non-linear optimisation problems
    • Drud A., CONOPT: A GRG Code for Large Sparse Dynamic Non-linear Optimisation Problems, Mathematical Programming, 31, pp. 153-191, 1985.
    • (1985) Mathematical Programming , vol.31 , pp. 153-191
    • Drud, A.1
  • 5
    • 85038053903 scopus 로고    scopus 로고
    • Internet Site of Benchmarks for Water Network Modelling
    • Internet Site of Benchmarks for Water Network Modelling. http://www.eng.dmu.ac.uk/~wss/welcome.htm


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.