메뉴 건너뛰기




Volumn 125, Issue 4, 1999, Pages 242-248

Value-added assessment of construction plans

Author keywords

[No Author keywords available]

Indexed keywords

BUILDINGS; CRITICAL PATH ANALYSIS; PLANNING; SUPERVISORY PERSONNEL; VALUE ENGINEERING;

EID: 0032656892     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(1999)125:4(242)     Document Type: Article
Times cited : (5)

References (5)
  • 1
    • 0344981722 scopus 로고
    • Improving production with process value analysis
    • Beischel, M. (1990). "Improving production with process value analysis." J. Accountancy, 170(3), 53-57.
    • (1990) J. Accountancy , vol.170 , Issue.3 , pp. 53-57
    • Beischel, M.1
  • 5
    • 0020822374 scopus 로고
    • Crew performance measurement via activity sampling
    • Thomas, H. R. (1983). "Crew performance measurement via activity sampling." J. Const. Engrg. and Mgmt., ASCE 109(3), 309-320.
    • (1983) J. Const. Engrg. and Mgmt., ASCE , vol.109 , Issue.3 , pp. 309-320
    • Thomas, H.R.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.