메뉴 건너뛰기




Volumn 125, Issue 4, 1999, Pages 256-264

Job behavior of construction project managers: determinants and assessment

Author keywords

[No Author keywords available]

Indexed keywords

JOB ANALYSIS; JOB SATISFACTION; PERFORMANCE; SUPERVISORY PERSONNEL;

EID: 0032656891     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(1999)125:4(256)     Document Type: Article
Times cited : (50)

References (31)
  • 3
    • 0021600372 scopus 로고
    • Effective construction site management: A review
    • Bresnen, M., et al. (1984). "Effective construction site management: A review." J. Construction Engrg. and Mgmt., ASCE, 110(4), 420-436.
    • (1984) J. Construction Engrg. and Mgmt., ASCE , vol.110 , Issue.4 , pp. 420-436
    • Bresnen, M.1
  • 6
    • 0015757836 scopus 로고
    • The development and evaluation of behaviorally based rating scales
    • Campbell, J., Dunnette, M., Arvey, R., and Hellervik, L. V. (1973). "The development and evaluation of behaviorally based rating scales." J. Applied Psychology, 57(1), 15-22.
    • (1973) J. Applied Psychology , vol.57 , Issue.1 , pp. 15-22
    • Campbell, J.1    Dunnette, M.2    Arvey, R.3    Hellervik, L.V.4
  • 9
    • 0345412973 scopus 로고
    • The use of behaviorally anchored rating scales in measuring construction site manager behavior
    • Dulaimi, M. F., and Langford, D. A. (1990). "The use of behaviorally anchored rating scales in measuring construction site manager behavior." Proc., CIB W65, 152-160.
    • (1990) Proc., CIB W65 , pp. 152-160
    • Dulaimi, M.F.1    Langford, D.A.2
  • 10
    • 0007023476 scopus 로고
    • Civil engineers' managerial roles and needs: Report of a survey
    • London
    • Faulkner, A., Sargent, J. H., and Wearne, S. H. (1989). "Civil engineers' managerial roles and needs: Report of a survey." J. Constr. Mgmt. and Economics, 17, 155-174, London.
    • (1989) J. Constr. Mgmt. and Economics , vol.17 , pp. 155-174
    • Faulkner, A.1    Sargent, J.H.2    Wearne, S.H.3
  • 12
    • 77956827950 scopus 로고
    • The contingency model and the dynamics of the leadership process
    • Fiedler, F. (1978). "The contingency model and the dynamics of the leadership process." Adv. in Experimental Social Psychology, Vol. 11, 59-112.
    • (1978) Adv. in Experimental Social Psychology , vol.11 , pp. 59-112
    • Fiedler, F.1
  • 14
    • 84986689808 scopus 로고
    • The influence of perceived job climate on the relationship between managerial achievement motivation and performance
    • Fineman, S. (1975). "The influence of perceived job climate on the relationship between managerial achievement motivation and performance." J. Occupational Psychology, Vol. 48, 113-124.
    • (1975) J. Occupational Psychology , vol.48 , pp. 113-124
    • Fineman, S.1
  • 16
    • 0002298955 scopus 로고
    • Factorial study of the leader behavior description
    • R. M. Stogdill and Coons, eds., Res. Monograph 88, Bureau of Business Research, Ohio State University, Columbus
    • Halpin, A. W., and Winer, B. J. (1957). "Factorial study of the leader behavior description." Leader behavior: Its description and measurement, R. M. Stogdill and Coons, eds., Res. Monograph 88, Bureau of Business Research, Ohio State University, Columbus, 39-51.
    • (1957) Leader Behavior: Its Description and Measurement , pp. 39-51
    • Halpin, A.W.1    Winer, B.J.2
  • 17
    • 0344119160 scopus 로고
    • Possibilities for future development in the prestige of site management
    • CIOB, Ascot, U.K.
    • Hatchett, M. (1980). "Possibilities for future development in the prestige of site management." The practice of site management, CIOB, Ascot, U.K., 10-12.
    • (1980) The Practice of Site Management , pp. 10-12
    • Hatchett, M.1
  • 19
    • 0344981779 scopus 로고
    • Middle LPC leaders and the contingency model of leadership effectiveness
    • Kennedy, J. K. (1982). "Middle LPC leaders and the contingency model of leadership effectiveness." Organizational Behavior and Humane Per., Vol. 30, 1-14.
    • (1982) Organizational Behavior and Humane Per. , vol.30 , pp. 1-14
    • Kennedy, J.K.1
  • 23
    • 0002783891 scopus 로고
    • Measuring the process of managerial effectiveness
    • Morse, J. J., and Wagner, F. R. (1978). "Measuring the process of managerial effectiveness." Acad. of Mgmt. J., 21(1), 23-35.
    • (1978) Acad. of Mgmt. J. , vol.21 , Issue.1 , pp. 23-35
    • Morse, J.J.1    Wagner, F.R.2
  • 24
    • 0344119158 scopus 로고
    • Behavioral anchors as a source of bias in rating
    • Murphy, K. R., and Constans, J. I. (1987). "Behavioral anchors as a source of bias in rating." J.Appl. Psychology, Vol. 4, 573-577.
    • (1987) J.appl. Psychology , vol.4 , pp. 573-577
    • Murphy, K.R.1    Constans, J.I.2
  • 28
    • 0003469420 scopus 로고
    • Leadership styles of construction managers in Hong Kong
    • Rowlinson, S., Ho, T, and Yun, P. K. (1993). "Leadership styles of construction managers in Hong Kong." J. Constr. Mgmt. and Economics, Vol. 11, 455-465.
    • (1993) J. Constr. Mgmt. and Economics , vol.11 , pp. 455-465
    • Rowlinson, S.1    Ho, T.2    Yun, P.K.3
  • 29
    • 84987047935 scopus 로고
    • Behaviorally anchored rating scales: A review of the literature
    • Schwab, D. P., Heneman, H. G., and DeCotiis, T. A. (1975). "Behaviorally anchored rating scales: A review of the literature." Personnel Psychology, Vol. 28, 549-562.
    • (1975) Personnel Psychology , vol.28 , pp. 549-562
    • Schwab, D.P.1    Heneman, H.G.2    DeCotiis, T.A.3
  • 30
    • 0000710247 scopus 로고
    • Retranslation of expectations: An approach to the construction of unambiguous anchors for rating scales
    • Smith, P. C., and Kendall, L. M. (1963). "Retranslation of expectations: An approach to the construction of unambiguous anchors for rating scales." J. Appl. Psychology, 47(2), 149-155.
    • (1963) J. Appl. Psychology , vol.47 , Issue.2 , pp. 149-155
    • Smith, P.C.1    Kendall, L.M.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.