메뉴 건너뛰기




Volumn 121, Issue 3, 1999, Pages 401-408

Status of westinghouse hot gas filters for coal and biomass power systems

Author keywords

[No Author keywords available]

Indexed keywords

AIR FILTERS; BIOMASS; CERAMIC MATERIALS; COAL GASIFICATION PLANTS; COMBINED CYCLE POWER PLANTS; ELECTRIC POWER GENERATION; GAS TURBINE POWER PLANTS;

EID: 0032656128     PISSN: 07424795     EISSN: 15288919     Source Type: Journal    
DOI: 10.1115/1.2818487     Document Type: Article
Times cited : (10)

References (9)
  • 1
    • 5544243255 scopus 로고    scopus 로고
    • paper presented at the Advanced Coal Based Power and Environmental Systems ’97 Contractor’s Review Meeting, Pittsburgh, PA, July 22-24, DOE/FETC, Pittsburgh, PA
    • Alvin, M. A., et al, 1997, “Filter Component Assessment," paper presented at the Advanced Coal Based Power and Environmental Systems ’97 Contractor’s Review Meeting, Pittsburgh, PA, July 22-24, DOE/FETC, Pittsburgh, PA.
    • (1997) Filter Component Assessment
    • Alvin, M.A.1
  • 3
    • 5544230488 scopus 로고
    • U.S. DOE Contract DE-FC21-89MC26042. Prepared by the American Electric Power Service Corporation, Columbus, OH, October 1995
    • Hoffman, J. D., et al, 1995, “Tidd Hot Gas Cleanup Program—Final Report,” U.S. DOE Contract DE-FC21-89MC26042. Prepared by the American Electric Power Service Corporation, Columbus, OH, October 1995.
    • (1995) Tidd Hot Gas Cleanup Program—Final Report
    • Hoffman, J.D.1
  • 5
    • 0003233861 scopus 로고
    • Westinghouse Advanced Particle Filter System
    • ’95 Review Meeting, DOE/METC-95/1018
    • Lippert, T. E., et al, 1995, “Westinghouse Advanced Particle Filter System,” Proceedings, Advanced Coal-Fired Power Systems ’95 Review Meeting, DOE/METC-95/1018.
    • (1995) Proceedings, Advanced Coal-Fired Power Systems
    • Lippert, T.E.1
  • 7
    • 5544250140 scopus 로고
    • Second-Generation Pressurized Fluidized Bed Combustion Plant: Research and Development Needs
    • Livingston, NJ. Phase 1, Task 2 Report FWC/FWDC-TR-89/06 to the U.S. DOE under contract DE-AC21-86MC21023
    • Robertson, A., et al., 1989, “Second-Generation Pressurized Fluidized Bed Combustion Plant: Research and Development Needs,” Foster Wheeler Development Corporation, Livingston, NJ. Phase 1, Task 2 Report FWC/FWDC-TR-89/06 to the U.S. DOE under contract DE-AC21-86MC21023.
    • (1989) Foster Wheeler Development Corporation
    • Robertson, A.1
  • 8
    • 0011429437 scopus 로고
    • Biomass Gasification Hot Gas Cleanup for Power Generation
    • Burlington, VT, NREL, Golden, CO
    • Wiant, B. C, et al, 1993, “Biomass Gasification Hot Gas Cleanup for Power Generation,” Proceedings, First Biomass Conference of the Americas, Burlington, VT, NREL, Golden, CO.
    • (1993) Proceedings, First Biomass Conference of the Americas
    • Wiant, B.C.1
  • 9
    • 85025227978 scopus 로고    scopus 로고
    • presented at the 1996 Gasification Technologies Conf., San Francisco, CA, October, EPRI, Palo Alto, CA
    • Zon, G. D., 1996, “Present Status and Operation Experiences IGCC Buggenum,” presented at the 1996 Gasification Technologies Conf., San Francisco, CA, October, EPRI, Palo Alto, CA
    • (1996) Present Status and Operation Experiences IGCC Buggenum
    • Zon, G.D.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.