-
1
-
-
0344459926
-
Slurry trench cut-off walls to contain contamination
-
July
-
Building Research Establishment (1994). "Slurry trench cut-off walls to contain contamination," BRE Digest 395, July.
-
(1994)
BRE Digest
, vol.395
-
-
-
2
-
-
0008840734
-
Containment Barrier at Pride Park, Derby, England
-
St. Petersburg, FL
-
Barker, P., Esnault, A. and Braithewaite, P. (1997). "Containment Barrier at Pride Park, Derby, England," Proceedings of the 1997 International Containment Technology Conference, St. Petersburg, FL.
-
(1997)
Proceedings of the 1997 International Containment Technology Conference
-
-
Barker, P.1
Esnault, A.2
Braithewaite, P.3
-
3
-
-
0345322820
-
Compliance testing for leaching of granular materials
-
PrEN 12457 LEACHING. CEN TC 292 July
-
CEN (1996) "Compliance testing for leaching of granular materials," Draft European Standard, PrEN 12457 LEACHING. CEN TC 292. July.
-
(1996)
Draft European Standard
-
-
-
4
-
-
0345322819
-
-
commissioned by Ground Board of the Institution of Civil Engineers in conjunction with Construction Industry Research and Information Association (CIRIA) and Building Research Establishment (BRE), dated 13 April, 43 pp.
-
Doe, G. and Jefferis, S. (1996a) "Draft Specification for Slurry Trench Cut-off Walls (as Barriers to Pollution Migration)," commissioned by Ground Board of the Institution of Civil Engineers in conjunction with Construction Industry Research and Information Association (CIRIA) and Building Research Establishment (BRE), dated 13 April, 43 pp.
-
(1996)
Draft Specification for Slurry Trench Cut-off Walls (as Barriers to Pollution Migration)
-
-
Doe, G.1
Jefferis, S.2
-
5
-
-
0345322819
-
-
commissioned by Ground Board of the Institution of Civil Engineers in conjunction with Construction Industry Research and Information Association (CIRIA) and Building Research Establishment (BRE), dated 13 April, 43 pp.
-
Doe, G. and Jefferis, S. (1996b) "Draft Notes for Guidance for Slurry Trench Cut-off Walls (as Barriers to Pollution Migration)," commissioned by Ground Board of the Institution of Civil Engineers in conjunction with Construction Industry Research and Information Association (CIRIA) and Building Research Establishment (BRE), dated 13 April, 43 pp.
-
(1996)
Draft Notes for Guidance for Slurry Trench Cut-off Walls (as Barriers to Pollution Migration)
-
-
Doe, G.1
Jefferis, S.2
-
6
-
-
6444220434
-
Containment of Hazardous Materials with Soil-Bentonite Slurry Walls
-
Wash., D. C., Nov.
-
Evans, J.C., Fang, H. Y., and Kugelman, I. J., (1985). "Containment of Hazardous Materials with Soil-Bentonite Slurry Walls," Proceedings of the 6th National Conference on the Management of Uncontrolled Hazardous Waste Sites, Wash., D. C., Nov., pp. 249-252.
-
(1985)
Proceedings of the 6th National Conference on the Management of Uncontrolled Hazardous Waste Sites
, pp. 249-252
-
-
Evans, J.C.1
Fang, H.Y.2
Kugelman, I.J.3
-
7
-
-
0008019815
-
Geotechnics of Hazardous Waste Control Systems
-
Chapter 20 Ed. H. Y. Fang, Von Nostrand Reinhold Company, New York, NY
-
Evans, J C. (1991). "Geotechnics of Hazardous Waste Control Systems," Chapter 20 in Foundation Engineering Handbook, 2nd ed., Ed. H. Y. Fang, Von Nostrand Reinhold Company, New York, NY.
-
(1991)
Foundation Engineering Handbook, 2nd Ed.
-
-
Evans, J.C.1
-
8
-
-
0002501739
-
Vertical Cutoff Walls
-
Chapter 17 Ed. D. E. Daniel, Chapman and Hall
-
Evans, J. C. (1993) "Vertical Cutoff Walls," Chapter 17 in Geotechnical Practice for Waste Disposal, Ed. D. E. Daniel, Chapman and Hall.
-
(1993)
Geotechnical Practice for Waste Disposal
-
-
Evans, J.C.1
-
9
-
-
0028595522
-
Hydraulic Conductivity of Vertical Cut-off Walls
-
ASTM STP 1142, D. E. Daniel and S. J. Trautwein, Eds. American Society for Testing and Materials, Philadelphia
-
Evans, J.C. (1994). "Hydraulic Conductivity of Vertical Cut-off Walls," Hydraulic Conductivity and Waste Contaminant Transport in Soils, ASTM STP 1142, D. E. Daniel and S. J. Trautwein, Eds. American Society for Testing and Materials, Philadelphia, pp. 79-94.
-
(1994)
Hydraulic Conductivity and Waste Contaminant Transport in Soils
, pp. 79-94
-
-
Evans, J.C.1
-
10
-
-
0042928560
-
Metals Attenuation in Minerally Enhanced Slurry Walls
-
St. Petersburg, FL
-
Evans, J.C., Adams, T.L. and Prince, M.J. (1997a)"Metals Attenuation in Minerally Enhanced Slurry Walls," Proceedings of the 1997 International Containment Technology Conference, St. Petersburg, FL.
-
(1997)
Proceedings of the 1997 International Containment Technology Conference
-
-
Evans, J.C.1
Adams, T.L.2
Prince, M.J.3
-
12
-
-
0344459925
-
The chemical compatibility of cement-bentonite cut-off wall material
-
paper submitted for publication
-
Garvin, S.L. and Hayles, C.S. (1998). The chemical compatibility of cement-bentonite cut-off wall material," paper submitted for publication in Construction & Building Materials Journal.
-
(1998)
Construction & Building Materials Journal
-
-
Garvin, S.L.1
Hayles, C.S.2
-
14
-
-
0019701065
-
Bentonite-cement slurries for hydraulic cut-offs
-
International Society for Soil Mechanics and Foundation Engineering, Stockholm
-
Jefferis, S.A. (1981) "Bentonite-cement slurries for hydraulic cut-offs", Tenth International Conference, International Society for Soil Mechanics and Foundation Engineering, Stockholm, Vol. 1, pp. 425-440.
-
(1981)
Tenth International Conference
, vol.1
, pp. 425-440
-
-
Jefferis, S.A.1
-
15
-
-
0010347680
-
In-ground barriers
-
ed. T. Cairney, Blackie A+P, London
-
Jefferis, S.A. (1993). "In-ground barriers," In. Contaminated Land - Problems and Solutions, ed. T. Cairney, Blackie A+P, London. Pp. 111-140.
-
(1993)
Contaminated Land - Problems and Solutions
, pp. 111-140
-
-
Jefferis, S.A.1
-
16
-
-
0344891730
-
The Origins of the Slurry Trench Cut-off and a Review of Cement-Bentonite Cut-off Walls in the UK
-
St. Petersburg, FL
-
Jefferis, S.A. (1997). "The Origins of the Slurry Trench Cut-off and a Review of Cement-Bentonite Cut-off Walls in the UK," Proceedings of the International Containment Technology Conference, St. Petersburg, FL, pp. 52-70.
-
(1997)
Proceedings of the International Containment Technology Conference
, pp. 52-70
-
-
Jefferis, S.A.1
-
17
-
-
0003741128
-
-
McGraw-Hill Book Company, New York, NY
-
LaGrega M.L., Buckingham, P.L., and Evans, J.C., Hazardous Waste Management, McGraw-Hill Book Company, New York, NY, 1994.
-
(1994)
Hazardous Waste Management
-
-
LaGrega, M.L.1
Buckingham, P.L.2
Evans, J.C.3
-
19
-
-
0029196575
-
Containment with Vertical Cutoff Walls
-
ASCE
-
Manassero, M., Fratolocchi, E., Pasqualini, E., Spanna, C., and Verga, F. (1995) "Containment with Vertical Cutoff Walls", Proceedings, Geoenvironment 2000, ASCE, Vol. 2, pp. 1142-1172.
-
(1995)
Proceedings, Geoenvironment 2000
, vol.2
, pp. 1142-1172
-
-
Manassero, M.1
Fratolocchi, E.2
Pasqualini, E.3
Spanna, C.4
Verga, F.5
-
20
-
-
0016356419
-
Stability of Trenches Filled with Fluids
-
ASCE, CO4
-
Nash, K.L. (1974). "Stability of Trenches Filled with Fluids," J. Construction Div., ASCE, CO4, pp. 533-542.
-
(1974)
J. Construction Div.
, pp. 533-542
-
-
Nash, K.L.1
-
21
-
-
0345322817
-
-
Personal communication
-
Philip, L. (1998) Personal communication
-
(1998)
-
-
Philip, L.1
-
22
-
-
0344028803
-
Owner's Perspective in Selection of Vertical Barrier Materials
-
paper prepared for Containment Technology Workshop, Baltimore MD, 29 August ed. R.R. Rumer and J.K. Mitchell
-
Potter, K.J. (1995). "Owner's Perspective in Selection of Vertical Barrier Materials," paper prepared for Containment Technology Workshop, Baltimore MD, 29 August cited in: Assessment of Barrier Containment Technologies, ed. R.R. Rumer and J.K. Mitchell, (http://em-52.doe.gov/ifd/scfa/textindx.pdf)
-
(1995)
Assessment of Barrier Containment Technologies
-
-
Potter, K.J.1
-
23
-
-
0344459920
-
Pollution Control in Alluvial Terrain
-
Prentice, J.E. (1974). "Pollution Control in Alluvial Terrain," Ground Engineering, Vol. 7, No. 5, pp. 26-28.
-
(1974)
Ground Engineering
, vol.7
, Issue.5
, pp. 26-28
-
-
Prentice, J.E.1
-
24
-
-
0345322816
-
-
CIRIA Special Publication 124, 278pp.
-
Privett, K.D., Matthews, S.C. and Hedges, R.A. (1996)."Barriers, liners and cover systems for containment and control of land contamination," CIRIA Special Publication 124, 278pp.
-
(1996)
Barriers, Liners and Cover Systems for Containment and Control of Land Contamination
-
-
Privett, K.D.1
Matthews, S.C.2
Hedges, R.A.3
-
25
-
-
0026998006
-
History of Slurry Wall Construction
-
ASTM STP 1129, D.B Paul, R.R. Davidson, and NJ Cavalli, Eds., American Society for Testing and Materials, Philadelphia
-
Ressi di Cerva, A.L. (1992). "History of Slurry Wall Construction," Slurry Walls: Design, Construction and Quality Control, ASTM STP 1129, D.B Paul, R.R. Davidson, and NJ Cavalli, Eds., American Society for Testing and Materials, Philadelphia, pp. 3-15.
-
(1992)
Slurry Walls: Design, Construction and Quality Control
, pp. 3-15
-
-
Ressi Di Cerva, A.L.1
-
26
-
-
0023169140
-
Vertical Barriers for Pollution Control
-
ASCE Geotechnical Special Publication No. 13
-
Ryan, C.R. (1987) "Vertical Barriers for Pollution Control," Geotechnical Practice for Waste Disposal '87, ASCE Geotechnical Special Publication No. 13, pp. 182-204.
-
(1987)
Geotechnical Practice for Waste Disposal '87
, pp. 182-204
-
-
Ryan, C.R.1
-
27
-
-
0344891735
-
-
EPA-540/2-84-001, US Environmental Protection Agency, Cincinnati, OH
-
Spooner, P., et al. (1984) Slurry Trench Construction for Pollution Migration Control, EPA-540/2-84-001, US Environmental Protection Agency, Cincinnati, OH.
-
(1984)
Slurry Trench Construction for Pollution Migration Control
-
-
Spooner, P.1
-
28
-
-
0031420982
-
Assessment of the piezocone to measure the in-situ properties of cement-bentonite slurry trench cut-off walls
-
Yong, R. M. and Thomas (eds.), H. R.
-
Tedd, P., Butcher, A. P., and Powell, J. J. M., (1995a). "Assessment of the piezocone to measure the in-situ properties of cement-bentonite slurry trench cut-off walls," Geoenvironmental Engineering, Contaminated ground: fate of pollutants and remediation, Yong, R. M. and Thomas (eds.), H. R., pp. 48-55.
-
(1995)
Geoenvironmental Engineering, Contaminated Ground: Fate of Pollutants and Remediation
, pp. 48-55
-
-
Tedd, P.1
Butcher, A.P.2
Powell, J.J.M.3
-
29
-
-
0010654478
-
Development of an instrument to measure in-situ Permeability of slurry trench cut-off walls
-
Bergamo, Italy, April 10-12
-
th International symposium on Field Measurements in Geomechanics, Bergamo, Italy, April 10-12, pp. 441-446.
-
(1995)
th International Symposium on Field Measurements in Geomechanics
, pp. 441-446
-
-
Tedd, P.1
Quarterman, R.S.T.2
Holton, I.R.3
-
31
-
-
0344028802
-
Soil-Bentonite Slurry Trench for HTRW Projects
-
CEGS-02260
-
US Army Corps of Engineers (1998) "Soil-Bentonite Slurry Trench for HTRW Projects," Guide Specification for Construction, CEGS-02260.
-
(1998)
Guide Specification for Construction
-
-
-
32
-
-
0344459922
-
The Effects of Slag Addition and Curing on the Permeability of Cement-Bentonite
-
Bucknell University, Department of Civil Engineering
-
Veracco, T. and Smith, B. (1997) "The Effects of Slag Addition and Curing on the Permeability of Cement-Bentonite," research report, Bucknell University, Department of Civil Engineering.
-
(1997)
Research Report
-
-
Veracco, T.1
Smith, B.2
|