-
1
-
-
0025857002
-
A study of replanning frequencies in a material requirements planning system
-
Barrett, R. T. and LaForge, R. L, 1991, A study of replanning frequencies in a material requirements planning system. Computers in Operations Research, 18, 569-578.
-
(1991)
Computers in Operations Research
, vol.18
, pp. 569-578
-
-
Barrett, R.T.1
Laforge, R.L.2
-
2
-
-
0001857828
-
Which lot-sizing techniques are used in material requirements planning
-
Haddock, J. and Hubicki, D. E., 1989, Which lot-sizing techniques are used in material requirements planning. Production and Inventory Management Journal, 30(3), 53-56.
-
(1989)
Production and Inventory Management Journal
, vol.30
, Issue.3
, pp. 53-56
-
-
Haddock, J.1
Hubicki, D.E.2
-
3
-
-
0000602739
-
Forecasting error evaluation in MRP production inventory system
-
Lee, T. S. and Adave, E., 1986, Forecasting error evaluation in MRP production inventory system. Management Science, 32, 1186-1205.
-
(1986)
Management Science
, vol.32
, pp. 1186-1205
-
-
Lee, T.S.1
Adave, E.2
-
4
-
-
0028401193
-
The effects of environment factors on the design of master production scheduling systems
-
Lin, N. P., Krawjewski, L, Leong, G. and Benton, W. C., 1994, The effects of environment factors on the design of master production scheduling systems. Journal of Operations Management, 11, 367-384.
-
(1994)
Journal of Operations Management
, vol.11
, pp. 367-384
-
-
Lin, N.P.1
Krawjewski, L.2
Leong, G.3
Benton, W.C.4
-
5
-
-
0002304138
-
A study of MRP bene® ts and costs
-
Schroeder, R. G., Anderson, J. C., Tjpy, S. E. and White, E., 1981, A study of MRP bene® ts and costs. Journal of Operations Management, 2, 1-9.
-
(1981)
Journal of Operations Management
, vol.2
, pp. 1-9
-
-
Schroeder, R.G.1
Erson, J.C.2
Tjpy, S.E.3
White, E.4
-
7
-
-
84985759548
-
Freezing the MPS under demand uncertainty
-
Sridharan, V. and Berry, W. L, 1990. Freezing the MPS under demand uncertainty. Decision Sciences, 21, 97-120.
-
(1990)
Decision Sciences
, vol.21
, pp. 97-120
-
-
Sridharan, V.1
Berry, W.L.2
-
8
-
-
21844485482
-
Freezing the master production schedule: Implication for fill rate
-
Sridharan, V. and LaForge, R. L., 1994, Freezing the master production schedule: implication for fill rate. Decision Science, 25, 461-469.
-
(1994)
Decision Science
, vol.25
, pp. 461-469
-
-
Sridharan, V.1
Laforge, R.L.2
-
9
-
-
0023404035
-
Freezing the MPS under rolling planning horizons
-
Sridharan, V., Berry, W. L. and Udayabhanu, V., 1987, Freezing the MPS under rolling planning horizons. Management Science, 33, 1137-1149.
-
(1987)
Management Science
, vol.33
, pp. 1137-1149
-
-
Sridharan, V.1
Berry, W.L.2
Udayabhanu, V.3
-
10
-
-
0027612429
-
Freezing the master production schedule under demand uncertainty
-
1996. Freezing the Master Production Schedule in multilevel Material Requirements Planning Systems under Deterministic Demand. Production Planning & Control, 7(2), 144-161
-
Zhao, X. and Lee, T S., 1993, Freezing the master production schedule under demand uncertainty. Journal of Operations Management, 11, 185-205; 1996. Freezing the Master Production Schedule in multilevel Material Requirements Planning Systems under Deterministic Demand. Production Planning & Control, 7(2), 144-161.
-
(1993)
Journal of Operations Management
, vol.11
, pp. 185-205
-
-
Zhao, X.1
Lee, T.S.2
-
11
-
-
84884343507
-
Lot-sizing rules and freezing the MPS in material requirements planning systems under demand uncertainty
-
Zhao, X., Goodale, J. C. and Lee, T. S., 1995, Lot-sizing rules and freezing the MPS in material requirements planning systems under demand uncertainty. International Journal of Production Research, 33(8), 2241-2276.
-
(1995)
International Journal of Production Research
, vol.33
, Issue.8
, pp. 2241-2276
-
-
Zhao, X.1
Goodale, J.C.2
Lee, T.S.3
|