메뉴 건너뛰기




Volumn 36, Issue 1, 1999, Pages 219-225

Model development for deteriorating inventory in material requirement planning systems

Author keywords

[No Author keywords available]

Indexed keywords

INVENTORY CONTROL; MATHEMATICAL MODELS; OPTIMIZATION; PROCESS CONTROL; PURCHASING; RESOURCE ALLOCATION; SCHEDULING; STRATEGIC PLANNING;

EID: 0032641840     PISSN: 03608352     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0360-8352(99)00003-0     Document Type: Article
Times cited : (17)

References (8)
  • 2
    • 0001641797 scopus 로고
    • Examining the impact of demand lumpiness on the lot-sizing performance in MRP systems
    • Ho C.J. Examining the impact of demand lumpiness on the lot-sizing performance in MRP systems. International Journal of Production Research. 33(9):1995;2579-2599.
    • (1995) International Journal of Production Research , vol.33 , Issue.9 , pp. 2579-2599
    • Ho, C.J.1
  • 3
    • 0029371175 scopus 로고
    • The effect of freezing the master production schedule on cost in multi-level MRP systems
    • Kadipasaoglu S.N. The effect of freezing the master production schedule on cost in multi-level MRP systems. Production and Inventory Management. 36(3):1995;30-36.
    • (1995) Production and Inventory Management , vol.36 , Issue.3 , pp. 30-36
    • Kadipasaoglu, S.N.1
  • 5
    • 0025720325 scopus 로고
    • Survey of literature on continuously deteriorating inventory models
    • Raafat F. Survey of literature on continuously deteriorating inventory models. Journal of the Operational Research Society. 42(1):1991;27-37.
    • (1991) Journal of the Operational Research Society , vol.42 , Issue.1 , pp. 27-37
    • Raafat, F.1
  • 6
    • 0002657699 scopus 로고
    • A heuristic for selecting lot size quantities for the case of a deterministic time-varying demand rate and discrete opportunistic for replenishment
    • Silver E.A., Meal H.C. A heuristic for selecting lot size quantities for the case of a deterministic time-varying demand rate and discrete opportunistic for replenishment. Production and Inventory Management. 14(2):1973;64-74.
    • (1973) Production and Inventory Management , vol.14 , Issue.2 , pp. 64-74
    • Silver, E.A.1    Meal, H.C.2
  • 8
    • 0030107956 scopus 로고    scopus 로고
    • Freezing the master production schedule in multi-level material requirement planning systems under deterministic demand
    • Zhao X., Lee T.S. Freezing the master production schedule in multi-level material requirement planning systems under deterministic demand. Production Planning and Control. 7(2):1996;144-161.
    • (1996) Production Planning and Control , vol.7 , Issue.2 , pp. 144-161
    • Zhao, X.1    Lee, T.S.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.