메뉴 건너뛰기




Volumn 48, Issue 1, 1999, Pages 25-28

Assembly process and assembly control development - a holistic and consistent approach

Author keywords

[No Author keywords available]

Indexed keywords

ASSEMBLY; CELLULAR MANUFACTURING; COMPUTER AIDED DESIGN; COMPUTER CONTROL SYSTEMS; COMPUTER SIMULATION; CONCURRENT ENGINEERING; PLANT MANAGEMENT; PRODUCT DESIGN; PRODUCT DEVELOPMENT;

EID: 0032632880     PISSN: 00078506     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0007-8506(07)63124-2     Document Type: Article
Times cited : (4)

References (14)
  • 3
    • 6544233184 scopus 로고
    • Fertigungsanlagen wissensbasiert entwerfen
    • Tönshoff, H., Lange, V., 1992, Fertigungsanlagen wissensbasiert entwerfen, ZwF 87/6: 314-318.
    • (1992) ZwF , vol.87 , Issue.6 , pp. 314-318
    • Tönshoff, H.1    Lange, V.2
  • 5
    • 6544276330 scopus 로고    scopus 로고
    • Spatial Planning of Manual and Automated Work Stations Utilising Mathematic Algorithms and Virtual Reality Devices
    • Juslin, K. (Ed.), Helsinki 1998
    • Reinhart, G, Roßgoderer, U., 1998, Spatial Planning of Manual and Automated Work Stations Utilising Mathematic Algorithms and Virtual Reality Devices, In: Juslin, K. (Ed.): Proc. of the Eurosim'98 Simulation Congress, Helsinki 1998, 3: 499-505.
    • (1998) Proc. of the Eurosim'98 Simulation Congress , vol.3 , pp. 499-505
    • Reinhart, G.1    Roßgoderer, U.2
  • 6
    • 6544262388 scopus 로고    scopus 로고
    • Virtual Engineering: 3D-Projektierung und Simulation komplexer Produktionssysteme am Beispiel SPS-gesteuerter Anlagen
    • Spath, D., Osmers, U., Guinand, P., 1997, Virtual Engineering: 3D-Projektierung und Simulation komplexer Produktionssysteme am Beispiel SPS-gesteuerter Anlagen, Industrie Management 13/1: 38- 41.
    • (1997) Industrie Management , vol.13 , Issue.1 , pp. 38-41
    • Spath, D.1    Osmers, U.2    Guinand, P.3
  • 7
    • 6544270662 scopus 로고    scopus 로고
    • Rapid Prototyping von speicherprogrammierbaren Steuerungen an virtuellen Maschinen
    • Albert, J., Tomaszunas, J., 1998, Rapid Prototyping von speicherprogrammierbaren Steuerungen an virtuellen Maschinen. Industrie Management 14/5: 34- 38.
    • (1998) Industrie Management , vol.14 , Issue.5 , pp. 34-38
    • Albert, J.1    Tomaszunas, J.2
  • 8
    • 6544294500 scopus 로고    scopus 로고
    • Off-line Programming of Robot Placement Systems based on the Integration of Motion-Oriented Simulation and Discrete-Event Control
    • Borne, P. et al. (Eds.), Hammamet, April 01-04
    • Feldmann, K., Krimi, S., Colombo, A., 1998, Off-line Programming of Robot Placement Systems based on the Integration of Motion-Oriented Simulation and Discrete-Event Control, In: Borne, P. et al. (Eds.), Proc. of IMACS/IEEE CESA'98, Hammamet, April 01-04, 3: 123-128.
    • (1998) Proc. of IMACS/IEEE CESA'98 , vol.3 , pp. 123-128
    • Feldmann, K.1    Krimi, S.2    Colombo, A.3
  • 9
    • 0030709089 scopus 로고    scopus 로고
    • Virtual Manufacturing Systems as Advanced Information Infrastructure for Integrating Manufacturing Resources and Activities
    • Iwata, K., Onosato, M., Teramoto, K., Osaki, S., 1997, Virtual Manufacturing Systems as Advanced Information Infrastructure for Integrating Manufacturing Resources and Activities. Annals of the CIRP 46/1: 335-338.
    • (1997) Annals of the CIRP , vol.46 , Issue.1 , pp. 335-338
    • Iwata, K.1    Onosato, M.2    Teramoto, K.3    Osaki, S.4
  • 10
    • 0012978198 scopus 로고    scopus 로고
    • Object-Oriented Modeling of Numerical Control Modules
    • Pritschow, G., Müller, J., 1997, Object-Oriented Modeling of Numerical Control Modules, Production Engineering 4/1: 83-86.
    • (1997) Production Engineering , vol.4 , Issue.1 , pp. 83-86
    • Pritschow, G.1    Müller, J.2
  • 12
    • 6544244923 scopus 로고    scopus 로고
    • MMS 3D - Toolkit for MMS Device Driver Development
    • Weck, M., Friedrich, J., 1997, MMS 3D - Toolkit for MMS Device Driver Development. Production Engineering 4/1: 117-122.
    • (1997) Production Engineering , vol.4 , Issue.1 , pp. 117-122
    • Weck, M.1    Friedrich, J.2
  • 13
    • 85031620849 scopus 로고
    • Assembly Planing on the Basis of an Object Oriented Petri Net Model
    • Hamza, M. (Ed.), Cancun, Mexico, 15.-17. Jun 1995, ACTA Press, Anaheim
    • Reinhart, G., Feldmann, C., 1995, Assembly Planing on the Basis of an Object Oriented Petri Net Model, In: Hamza, M. (Ed.): Proc. of the IASTED Int'l. Conf. on "Applied Modelling, Simulation and Optimization", Cancun, Mexico, 15.-17. Jun 1995, ACTA Press, Anaheim: 249-253.
    • (1995) Proc. of the IASTED Int'l. Conf. on "Applied Modelling, Simulation and Optimization" , pp. 249-253
    • Reinhart, G.1    Feldmann, C.2
  • 14
    • 6544293903 scopus 로고    scopus 로고
    • Planning and Control of Automated Assembly Systems
    • J. Lee (Ed.): Manufacturing Science and Engineering 1998, Nov. 15-20, Anaheim, USA. ASME, New York
    • Reinhart, G., Cuiper, R., 1998, Planning and Control of Automated Assembly Systems, In: J. Lee (Ed.): Manufacturing Science and Engineering 1998. Proc. of the ASME IMECE'98, Nov. 15-20, Anaheim, USA. ASME, New York: 325-330.
    • (1998) Proc. of the ASME IMECE'98 , pp. 325-330
    • Reinhart, G.1    Cuiper, R.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.