-
1
-
-
0021496929
-
Sequencing rules and due-date assignments in a job shop
-
Baker, K. R., 1984, Sequencing rules and due-date assignments in a job shop. Management Science, 30, 1093-1104.
-
(1984)
Management Science
, vol.30
, pp. 1093-1104
-
-
Baker, K.R.1
-
2
-
-
0026979130
-
From spreadsheets to simulations: A comparison of analysis methods for IC manufacturing performance
-
Baudin, M., Mehhotha, V., Tullis, B., Yeaman, D. and Hughes, R. A., 1992, From spreadsheets to simulations: A comparison of analysis methods for IC manufacturing performance. IEEE/SEMI International Semiconductor Manufacturing Science Symposium, pp. 94-99.
-
(1992)
IEEE/SEMI International Semiconductor Manufacturing Science Symposium
, pp. 94-99
-
-
Baudin, M.1
Mehhotha, V.2
Tullis, B.3
Yeaman, D.4
Hughes, R.A.5
-
3
-
-
0020783525
-
The effect of workload dependent due-date on job shop performance
-
Behthand, J. W. M., 1983, The effect of workload dependent due-date on job shop performance. Management Science, 29, 799-816.
-
(1983)
Management Science
, vol.29
, pp. 799-816
-
-
Behthand, J.W.M.1
-
4
-
-
0022160975
-
Setting job-shop due-dates with service-level constraints
-
Bookbindeh, J. H. and Nooh, A. I., 1985, Setting job-shop due-dates with service-level constraints. Journal of Operation Research Society, 36, 1017-1026.
-
(1985)
Journal of Operation Research Society
, vol.36
, pp. 1017-1026
-
-
Bookbindeh, J.H.1
Nooh, A.I.2
-
5
-
-
0003729218
-
-
2nd edn (New York: Wiley-Interscience), pp
-
Chattehjee, S. and Phice, B., 1991, Regression Analysis by Example, 2nd edn (New York: Wiley-Interscience), pp. 107-110, 227-251.
-
(1991)
Regression Analysis by Example
-
-
Chattehjee, S.1
Phice, B.2
-
6
-
-
0024303531
-
Survey of scheduling research involving due date determination decisions
-
Cheng, T. C. E. and Gupta, M. C., 1989, Survey of scheduling research involving due date determination decisions. European Journal of Operational Research, 38, 156-166.
-
(1989)
European Journal of Operational Research
, vol.38
, pp. 156-166
-
-
Cheng, T.C.E.1
Gupta, M.C.2
-
7
-
-
0030212054
-
A queueing network model for semiconductor manufacturing
-
Connohs, P., Feigin, G. E. and Yao, D. D., 1996, A queueing network model for semiconductor manufacturing. IEEE Transactions on Semiconductor Manufacturing, 9, 412-427.
-
(1996)
IEEE Transactions on Semiconductor Manufacturing
, vol.9
, pp. 412-427
-
-
Connohs, P.1
Feigin, G.E.2
Yao, D.D.3
-
9
-
-
0016929914
-
Due-date in job shop Scheduling
-
Eilon, S. and Chowdhuhy, I. G., 1976, Due-date in job shop Scheduling. International Journal of Production Research, 14, 223-238.
-
(1976)
International Journal of Production Research
, vol.14
, pp. 223-238
-
-
Eilon, S.1
Chowdhuhy, I.G.2
-
10
-
-
0001153814
-
A dynamic forecasting model for job shop flow time prediction and tardiness control
-
Enns, S. T., 1995, A dynamic forecasting model for job shop flow time prediction and tardiness control. International Journal of Production Research, 33, 1295-1312.
-
(1995)
International Journal of Production Research
, vol.33
, pp. 1295-1312
-
-
Enns, S.T.1
-
11
-
-
0017246996
-
Due-dates and instantaneous load in the one-machine shop
-
Heahd, E. L., 1976, Due-dates and instantaneous load in the one-machine shop. Management Science, 23, 444-449.
-
(1976)
Management Science
, vol.23
, pp. 444-449
-
-
Heahd, E.L.1
-
12
-
-
0023310940
-
Lot sizes, lead time and in-process inventories
-
Kahmahkah, U. S., 1987, Lot sizes, lead time and in-process inventories. Management Science, 33, 409-418.
-
(1987)
Management Science
, vol.33
, pp. 409-418
-
-
Kahmahkah, U.S.1
-
13
-
-
0029393210
-
Estimating flowtimes and setting due-dates in complex production systems
-
Lawrence, S. R., 1995, Estimating flowtimes and setting due-dates in complex production systems. IIE Transactions, 27, 657-668.
-
(1995)
IIE Transactions
, vol.27
, pp. 657-668
-
-
Lawrence, S.R.1
-
14
-
-
0009437809
-
The application of an open queueing network to the analysis of cycle time, variability, throughput, inventory and cost in the batch production system of a microelectronics manufacturer
-
Lynes, K. and Miltenburg, J., 1994, The application of an open queueing network to the analysis of cycle time, variability, throughput, inventory and cost in the batch production system of a microelectronics manufacturer. International Journal of Production Economics, 37, 189-203.
-
(1994)
International Journal of Production Economics
, vol.37
, pp. 189-203
-
-
Lynes, K.1
Miltenburg, J.2
-
15
-
-
0026953379
-
Capacity-based order review/release strategies to improve manufacturing performance
-
Philipoon, P. R. and Fry, T. D., 1992, Capacity-based order review/release strategies to improve manufacturing performance. International Journal of Production Research, 30, 2559-2572.
-
(1992)
International Journal of Production Research
, vol.30
, pp. 2559-2572
-
-
Philipoon, P.R.1
Fry, T.D.2
-
16
-
-
0001870328
-
A simulation analysis of due-date assignment rules
-
Ragatz, G. L. and Mabert, V. A., 1984, A simulation analysis of due-date assignment rules. Journal of Operations Management, 5, 27-39.
-
(1984)
Journal of Operations Management
, vol.5
, pp. 27-39
-
-
Ragatz, G.L.1
Mabert, V.A.2
-
17
-
-
0019560165
-
Due date assignment for production system
-
Seidmann, A. and Smith, M. L., 1981, Due date assignment for production system. Management Science, 27, 571-581.
-
(1981)
Management Science
, vol.27
, pp. 571-581
-
-
Seidmann, A.1
Smith, M.L.2
-
19
-
-
0026945242
-
Neural networks applications in manufacturing processes
-
Udo, G. J., 1992, Neural networks applications in manufacturing processes. Computers and Industrial Engineering, 23, 97-100.
-
(1992)
Computers and Industrial Engineering
, vol.23
, pp. 97-100
-
-
Udo, G.J.1
-
20
-
-
85023585243
-
-
Dynamic estimation of job flow time. Masters thesis, University of Minnesota, Twin Cities, USA
-
Vig, M. M. 1989, Dynamic estimation of job flow time. Masters thesis, University of Minnesota, Twin Cities, USA.
-
(1989)
-
-
Vig, M.M.1
-
21
-
-
0026186620
-
Dynamic rules for due-date assignment
-
1993, Mixing static and dynamic flow time estimates for due-date assignment. Journal of Operations Management, 11, 67-79
-
Vig, M. M. and Dooly, K. J., 1991, Dynamic rules for due-date assignment. International Journal of Production Research, 29, 1361-1377. 1993, Mixing static and dynamic flow time estimates for due-date assignment. Journal of Operations Management, 11, 67-79.
-
(1991)
International Journal of Production Research
, vol.29
, pp. 1361-1377
-
-
Vig, M.M.1
Dooly, K.J.2
-
22
-
-
0017478424
-
A methodology for assigning minimum cost due-dates
-
Weeks, J. K. and Fryer, J. S., 1977, A methodology for assigning minimum cost due-dates. Management Science, 23, 872-881.
-
(1977)
Management Science
, vol.23
, pp. 872-881
-
-
Weeks, J.K.1
Fryer, J.S.2
-
23
-
-
0018454859
-
A simulation study of predictable due-dates
-
Weeks, J. K., 1979, A simulation study of predictable due-dates. Management Science, 25, 363-373.
-
(1979)
Management Science
, vol.25
, pp. 363-373
-
-
Weeks, J.K.1
-
24
-
-
0001200692
-
Due-date setting and priority sequencing in a multiclass M/G/1 queue
-
Wein, L. M., 1991, Due-date setting and priority sequencing in a multiclass M/G/1 queue. Management Science, 37, 834-850.
-
(1991)
Management Science
, vol.37
, pp. 834-850
-
-
Wein, L.M.1
-
25
-
-
0000414908
-
Applications of neural networks in manufacturing: A state-of-the-art survey
-
Zhang, H. C. and Huang, S. H., 1995, Applications of neural networks in manufacturing: A state-of-the-art survey. International Journal of Production Research, 33, 705-728.
-
(1995)
International Journal of Production Research
, vol.33
, pp. 705-728
-
-
Zhang, H.C.1
Huang, S.H.2
|