메뉴 건너뛰기




Volumn 37, Issue 12, 1999, Pages 2861-2873

Comparative analysis of order-input sequencing heuristics in a cellular flexible assembly system for large products

Author keywords

[No Author keywords available]

Indexed keywords

CELLULAR MANUFACTURING; COMPUTER SIMULATION; FLEXIBLE MANUFACTURING SYSTEMS; HEURISTIC METHODS; PROCESS CONTROL; SCHEDULING; STRATEGIC PLANNING;

EID: 0032631187     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/002075499190554     Document Type: Article
Times cited : (9)

References (23)
  • 4
    • 0001882231 scopus 로고
    • Selection of a set of part delivery dates in a multi-job stochastic assembly system
    • Das, S. K. and Sarin, S. C., 1988, Selection of a set of part delivery dates in a multi-job stochastic assembly system. IIE Transactions, 20, 4-11.
    • (1988) IIE Transactions , vol.20 , pp. 4-11
    • Das, S.K.1    Sarin, S.C.2
  • 7
    • 84946326526 scopus 로고
    • A heuristic operation sequence-pattern identification method and its applications in the design of a cellular flexible assembly system
    • Ho, Y.-C. and Moodie, C. L., 1994, A heuristic operation sequence-pattern identification method and its applications in the design of a cellular flexible assembly system. International Journal of Computer Integrated Manufacturing, 7, 163-174.
    • (1994) International Journal of Computer Integrated Manufacturing , vol.7 , pp. 163-174
    • Ho, Y.-C.1    Moodie, C.L.2
  • 9
    • 0028434049 scopus 로고
    • A due date-based approach to part type selection in flexible manufacturing systems
    • Kim, Y.-D. and Yano, C. A., 1994, A due date-based approach to part type selection in flexible manufacturing systems. International Journal of Production Research, 32, 1027-1043.
    • (1994) International Journal of Production Research , vol.32 , pp. 1027-1043
    • Kim, Y.-D.1    Yano, C.A.2
  • 11
    • 85023544374 scopus 로고
    • An investigation of group scheduling heuristics in a flow shop cellular system with workcenter sharing for the forbidden early shipment environment. PhD. Dissertation, Oklahoma State University; 1996, Simulation analysis of scheduling heuristics in a flow-line manufacturing cell with two types of order shipment environments. SIMULATION, 66, 106-116
    • Leu, B.-Y., 1994, An investigation of group scheduling heuristics in a flow shop cellular system with workcenter sharing for the forbidden early shipment environment. PhD. Dissertation, Oklahoma State University; 1996, Simulation analysis of scheduling heuristics in a flow-line manufacturing cell with two types of order shipment environments. SIMULATION, 66, 106-116.
    • (1994)
    • Leu, B.-Y.1
  • 13
    • 0002765014 scopus 로고
    • Dynamic group scheduling heuristics in a flow-through cell environment
    • Mahmoodi, F., Tierney, E. J. and Mosier, C. T., 1992, Dynamic group scheduling heuristics in a flow-through cell environment. Decision Sciences, 23, 61-85.
    • (1992) Decision Sciences , vol.23 , pp. 61-85
    • Mahmoodi, F.1    Tierney, E.J.2    Mosier, C.T.3
  • 14
    • 0001935574 scopus 로고
    • Effects of processing time variability and routing flexibility on group technology implementation in flow-shop
    • New Orleans, LA
    • Moily, J. P. and Stinson, J. P., 1989, Effects of processing time variability and routing flexibility on group technology implementation in flow-shop. Proceedings of Annual Meeting of the Decision Sciences Institute, New Orleans, LA, pp. 898-901.
    • (1989) Proceedings of Annual Meeting of the Decision Sciences Institute , pp. 898-901
    • Moily, J.P.1    Stinson, J.P.2
  • 18
    • 0001827599 scopus 로고
    • Classification and review of FMS scheduling procedures
    • Rachamadugu, R. and Stecke, K. E., 1994, Classification and review of FMS scheduling procedures. Production Planning & Control, 5, 2-20.
    • (1994) Production Planning & Control , vol.5 , pp. 2-20
    • Rachamadugu, R.1    Stecke, K.E.2
  • 23
    • 0009351590 scopus 로고
    • Design and scheduling of flexible assembly systems for large products: A simulation study
    • Yano, C. A., Lee, H. F. and Srinivasan, M. M., 1991, Design and scheduling of flexible assembly systems for large products: A simulation study. Journal of Manufacturing Systems, 10, 54-66.
    • (1991) Journal of Manufacturing Systems , vol.10 , pp. 54-66
    • Yano, C.A.1    Lee, H.F.2    Srinivasan, M.M.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.