-
1
-
-
0003162455
-
Holonic planning and scheduling for a robotic assembly testbed
-
Try, NY, 10-12 October, IEEE C omputer Society Press
-
Gou, L., Hasegawa, T., Luh, P., Tamuha, S., and Oblak, J. M., 1994, Holonic planning and scheduling for a robotic assembly testbed. Proceedings of the Fourth International Conference on Computer Integrated M anufacturing and Automation Technology, Try, NY, 10-12 October, IEEE C omputer Society Press.
-
(1994)
Proceedings of the Fourth International Conference on Computer Integrated M Anufacturing and Automation Technology
-
-
Gou, L.1
Hasegawa, T.2
Luh, P.3
Tamuha, S.4
Oblak, J.M.5
-
2
-
-
0000814799
-
Search heuristics for a flow-shop scheduling problem in a printed circuit board assembly process
-
Kim, Y. D., Lim, H. G., and Pahk, M. W., 1996, Search heuristics for a flow-shop scheduling problem in a printed circuit board assembly process. European Journal of Operational Research, 91, 124-143.
-
(1996)
European Journal of Operational Research
, vol.91
, pp. 124-143
-
-
Kim, Y.D.1
Lim, H.G.2
Pahk, M.W.3
-
3
-
-
0011743937
-
Coordinating mutually dependent decisions in a distributed scheduler
-
August, Dipoli, Espoo, Finland
-
Lassila, O., Syhjanen, M., an d Tohma, S., 1990, Coordinating mutually dependent decisions in a distributed scheduler. In Conference on Advances in Production Management Systems 90, Preprints, 2022 August, Dipoli, Espoo, Finland, pp.1-8.
-
(1990)
Conference on Advances in Production Management Systems 90, Preprints
, vol.20-22
, pp. 1-8
-
-
Lassila, O.1
Syhjanen, M.2
An D Tohma, S.3
-
4
-
-
0027590319
-
Minimising the makespan in the 3-machine assembly-type flow-shop scheduling problem
-
Lee, C.-Y., Cheng, T. C. E., and Lin, B. M. T., 1993, Minimising the makespan in the 3-machine assembly-type flow-shop scheduling problem. Management Science, 39, 616-625.
-
(1993)
Management Science
, vol.39
, pp. 616-625
-
-
Lee, C.-Y.1
Cheng, T.C.E.2
Lin, B.M.T.3
-
5
-
-
0026256679
-
A retrospective view of FA/C distributed problem solving
-
Lesseh, V. R., 1991, A retrospective view of FA/C distributed problem solving. IEEE Transactions on Systems, Man and Cybernetics, 21, 1347-1362.
-
(1991)
IEEE Transactions on Systems, Man and Cybernetics
, vol.21
, pp. 1347-1362
-
-
Lesseh, V.R.1
-
7
-
-
0345889518
-
Distributed control of automated manufacturing systems
-
Proceedings of the CIRP Seminars
-
Ramaswamy, S. E., and Joshi, S., 1996, Distributed control of automated manufacturing systems. Manufacturing Systems, Vol. 25, No. 4, Proceedings of the CIRP Seminars.
-
(1996)
Manufacturing Systems
, vol.25
, Issue.4
-
-
Ramaswamy, S.E.1
Joshi, S.2
-
9
-
-
0031245009
-
Approaches and issues in scheduling a distributed shop-floor environment
-
Thahumahajah, A., and Bemelman, R., 1997, Approaches and issues in scheduling a distributed shop-floor environment. Computers in Industry, 34, 95-109.
-
(1997)
Computers in Industry
, vol.34
, pp. 95-109
-
-
Thahumahajah, A.1
Bemelman, R.2
-
10
-
-
0030721152
-
A behaviour-based approach to scheduling in distributed manufacturing systems
-
Thahumahajah, A., and Wells, A. J., 1997, A behaviour-based approach to scheduling in distributed manufacturing systems. Journal of Computer-Aided Engineering, 4, 235-249.
-
(1997)
Journal of Computer-Aided Engineering
, vol.4
, pp. 235-249
-
-
Thahumahajah, A.1
Wells, A.J.2
-
11
-
-
0344044581
-
Modelling and assembly line scheduling problem
-
North Ryde, Australia
-
Welgama, P., 1997, Modelling and assembly line scheduling problem. CMIS Technical Report, CMIS-C 29/97, CSIRO Mathematical and Information Sciences, North Ryde, Australia.
-
(1997)
CMIS Technical Report, CMIS-C 29/97, CSIRO Mathematical and Information Sciences
-
-
Welgama, P.1
-
12
-
-
0031103568
-
Scheduling of flexible flow lines in an automobile assembly plant
-
Agnetis, A., Pacifici, A., Rossi, F., Lucehtini, M., Nicoletti, S., Nicolo, F., Ohiolo, G., Pacciahelli, D., and Pesaho, E., 1997, Scheduling of flexible flow lines in an automobile assembly plant. European Journal of Operational Research, 97, 348-362.
-
(1997)
European Journal of Operational Research
, vol.97
, pp. 348-362
-
-
Agnetis, A.1
Pacifici, A.2
Rossi, F.3
Lucehtini, M.4
Nicoletti, S.5
Nicolo, F.6
Ohiolo, G.7
Pacciahelli, D.8
Pesaho, E.9
|