-
2
-
-
41149112572
-
-
Ventura County, CA, Dibblee Foundation, Santa Barbara, CA
-
T. Dibblee, H. Ehrenspeck, Geologic Map of the Camarillo/Newbury Park Quadrangle, Ventura County, CA, Dibblee Foundation, Santa Barbara, CA, 1990.
-
(1990)
Geologic Map of the Camarillo/Newbury Park Quadrangle
-
-
Dibblee, T.1
Ehrenspeck, H.2
-
4
-
-
0344074440
-
-
EMCON, Newbury Park, CA, June
-
EMCON, Bimonthly Report, Second Quarter 1998 Monitoring Results, Confidential Facility, Newbury Park, CA, June 1998.
-
(1998)
Bimonthly Report, Second Quarter 1998 Monitoring Results, Confidential Facility
-
-
-
5
-
-
0345367890
-
Report on the Bench Testing of Sermatec Zinc-coated Proppants
-
ETI, Guelph, Ontario
-
ETI, Report on the Bench Testing of Sermatec Zinc-coated Proppants, Envirometals Technologies, Guelph, Ontario, 1995.
-
(1995)
Envirometals Technologies
-
-
-
7
-
-
0344936521
-
-
Department of Chemical and Environmental Engineering, University of Arizona
-
J. Farrell, M. Kason, Progress and Final Reports, EMCON Iron Proppant Column Test, Department of Chemical and Environmental Engineering, University of Arizona, 1996a-c, 1997.
-
(1996)
Progress and Final Reports, EMCON Iron Proppant Column Test
-
-
Farrell, J.1
Kason, M.2
-
12
-
-
0345367889
-
Preliminary information on the installation of a Permeable Reactive Barrier Funnel and Gate System at the Y12 site Oak Ridge
-
TN, January
-
D. Gravelding, Preliminary information on the installation of a Permeable Reactive Barrier Funnel and Gate System at the Y12 site Oak Ridge, TN, IBC Conference, January 1998.
-
(1998)
IBC Conference
-
-
Gravelding, D.1
-
16
-
-
0344074436
-
New installation techniques in side-by-side demonstration at the Cape Canaveral Air Station
-
Beaverton, OR, April
-
E.G. Marchand, P.A. Shirley, K.A. McNelis, Fiorillo, L. Teresa, New installation techniques in side-by-side demonstration at the Cape Canaveral Air Station, Proceedings of the Permeable Barriers Work Group of the Remedial Technologies Development Forum, Beaverton, OR, April 1998.
-
(1998)
Proceedings of the Permeable Barriers Work Group of the Remedial Technologies Development Forum
-
-
Marchand, E.G.1
Shirley, P.A.2
McNelis, K.A.3
Fiorillo4
Teresa, L.5
-
17
-
-
0345367884
-
Migration of TCE and chromium in a fractured bedrock aquifer, a case history
-
Long Beach, CA
-
D. Marcus, Migration of TCE and chromium in a fractured bedrock aquifer, a case history, Proceedings of National Meeting, Association of Engineering Geologists, Long Beach, CA, 1992.
-
(1992)
Proceedings of National Meeting, Association of Engineering Geologists
-
-
Marcus, D.1
-
18
-
-
0344936518
-
Physical and chemical factors affecting the migration of TCE and chromium in a fractured bedrock aquifer
-
San Jose, CA
-
D. Marcus, Physical and chemical factors affecting the migration of TCE and chromium in a fractured bedrock aquifer, Proceedings of Hazmacon, San Jose, CA, 1993.
-
(1993)
Proceedings of Hazmacon
-
-
Marcus, D.1
-
19
-
-
0345367885
-
-
In situ treatment of groundwater contaminants, Patent Application Serial No. 08/310,223, 1994
-
D. Marcus, In situ treatment of groundwater contaminants, Patent Application Serial No. 08/310,223, 1994.
-
-
-
Marcus, D.1
-
20
-
-
0344505677
-
-
Personal communication of batch test results for testing conducted at the USEPA Athens NERL Laboratory
-
S. McCutcheon, Personal communication of batch test results for testing conducted at the USEPA Athens NERL Laboratory, 1996.
-
(1996)
-
-
McCutcheon, S.1
-
21
-
-
0344936516
-
Status of a Reactive Barrier Project for uranium containment at Monticello
-
UT, Beaverton, OR, April
-
S. Morrison, Status of a Reactive Barrier Project for uranium containment at Monticello, UT, Proceedings of the Permeable Barriers Work Group of the Remedial Technologies Development Forum, Beaverton, OR, April 1998.
-
(1998)
Proceedings of the Permeable Barriers Work Group of the Remedial Technologies Development Forum
-
-
Morrison, S.1
-
22
-
-
0004260743
-
-
National Research Council, National Academy Press
-
National Research Council, Alternatives for Groundwater Cleanup, National Academy Press, 1994.
-
(1994)
Alternatives for Groundwater Cleanup
-
-
-
25
-
-
0344936515
-
Installation of permeable reactive barriers using continuous trenching equipment
-
Virginia Beach, VA, September
-
R. Puls, Installation of permeable reactive barriers using continuous trenching equipment, Proceedings of the RTDF Permeable Barriers Work Group, Virginia Beach, VA, September 1997.
-
(1997)
Proceedings of the RTDF Permeable Barriers Work Group
-
-
Puls, R.1
-
26
-
-
0344505673
-
-
American Society of Chemical Engineers, Anaheim, April
-
T. Sivavec, D. Horney, Bromide retardation in zero valent iron column tests, American Society of Chemical Engineers, Anaheim, April, 1995.
-
(1995)
Bromide Retardation in Zero Valent Iron Column Tests
-
-
Sivavec, T.1
Horney, D.2
-
28
-
-
0028433923
-
In situ remediation of contaminated groundwater: The funnel and gate system
-
Starr, Cherry In situ remediation of contaminated groundwater: the funnel and gate system. Groundwater. 32(3):1994;465.
-
(1994)
Groundwater
, vol.32
, Issue.3
, pp. 465
-
-
Starr1
Cherry2
-
29
-
-
0345367882
-
-
Treatment of chlorinated pesticides in wastewater using zero valent metal, US Patent Application, 1973
-
Sweeney, Fischer, Treatment of chlorinated pesticides in wastewater using zero valent metal, US Patent Application, 1973.
-
-
-
Sweeney1
Fischer2
-
33
-
-
0344074433
-
Caisson installation of a pilot scale, permeable reactive barrier in situ treatment zone at the Sommersworth Landfill
-
NH, Alexandria, VA, April
-
J. Vogan, Caisson installation of a pilot scale, permeable reactive barrier in situ treatment zone at the Sommersworth Landfill, NH, Presented to the RTDF Permeable Barriers Work Group, Alexandria, VA, April 1996.
-
(1996)
Presented to the RTDF Permeable Barriers Work Group
-
-
Vogan, J.1
-
34
-
-
0344074432
-
The feasibility of permeable reactive barriers for in situ groundwater treatment, The Sunnyvale 'Iron Wall' and beyond
-
Tucson, January
-
S. Warner, D. Hankins, The feasibility of permeable reactive barriers for in situ groundwater treatment, The Sunnyvale 'Iron Wall' and beyond, Professional address delivered to the IBC Subsurface Barriers Containment Conference, Tucson, January 1998.
-
(1998)
Professional Address Delivered to the IBC Subsurface Barriers Containment Conference
-
-
Warner, S.1
Hankins, D.2
|