메뉴 건너뛰기




Volumn 37, Issue 1, 1999, Pages 481-484

Feature-based prototype system for the evaluation and optimisation of manufacturing processes

Author keywords

[No Author keywords available]

Indexed keywords

COMPUTER AIDED MANUFACTURING; CONSTRAINT THEORY; KNOWLEDGE BASED SYSTEMS; OPTIMIZATION;

EID: 0032599494     PISSN: 03608352     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0360-8352(99)00123-0     Document Type: Article
Times cited : (18)

References (9)
  • 1
    • 0028599991 scopus 로고
    • An expert system for concurrent product and process design of mechanical parts
    • Abdalla, H.S., Knight, J., (1994) "An expert system for concurrent product and process design of mechanical parts", Proc. Instn. Mech. Engrs, Vol. 208, pp. 167-172.
    • (1994) Proc. Instn. Mech. Engrs , vol.208 , pp. 167-172
    • Abdalla, H.S.1    Knight, J.2
  • 4
    • 0030296040 scopus 로고    scopus 로고
    • Cost evaluation in design with form features
    • Fen, C. J., Kusiak, A., and Huang, C., (1996) "Cost evaluation in design with form features", Computer-Aided Design, Vol.28, No. 11, pp. 879-885.
    • (1996) Computer-Aided Design , vol.28 , Issue.11 , pp. 879-885
    • Fen, C.J.1    Kusiak, A.2    Huang, C.3
  • 5
    • 0009410236 scopus 로고    scopus 로고
    • An expert system for manufacturing process optimisation
    • Manchester, UK
    • Gayretli, A and Abdalla, H, (1998) " An expert system for manufacturing process optimisation" The Proceedings of TMCE'98, Manchester, UK.
    • (1998) The Proceedings of TMCE'98
    • Gayretli, A.1    Abdalla, H.2
  • 7
    • 0029489571 scopus 로고
    • An integrated system for process planning and cost estimation in hole making
    • Luong, L. H. S., and Spedding, T., (1995) "An integrated system for process planning and cost estimation in hole making" Int. J. Adv. Manuf. Technol., Vol. 10, pp. 411-415.
    • (1995) Int. J. Adv. Manuf. Technol. , vol.10 , pp. 411-415
    • Luong, L.H.S.1    Spedding, T.2
  • 8
    • 0031344631 scopus 로고    scopus 로고
    • Developing an integrated frame work for feature-based early manufacturing cost estimisation
    • Ou-Yang, C, and Lin, T S, (1997) "Developing an integrated frame work for feature-based early manufacturing cost estimisation" Int. J. Adv. Manuf. Technol., Vol.13, No:9, pp. 618-629.
    • (1997) Int. J. Adv. Manuf. Technol. , vol.13 , Issue.9 , pp. 618-629
    • Ou-Yang, C.1    Lin, T.S.2
  • 9
    • 0000209568 scopus 로고    scopus 로고
    • A comparison of equality constraints formulation for concurrent design optimisation
    • Tappeta, V R and Renaud, E J (1997) "A comparison of equality constraints formulation for concurrent design optimisation" Concurrent Engineering: Research and Applications, Vol.5, Number.5, pp. 253-261.
    • (1997) Concurrent Engineering: Research and Applications , vol.5 , Issue.5 , pp. 253-261
    • Tappeta, V.R.1    Renaud, E.J.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.