메뉴 건너뛰기




Volumn 121, Issue 3, 1999, Pages 478-484

Workspace synthesis for flexible fixturing of stampings

Author keywords

[No Author keywords available]

Indexed keywords

AUTOMOBILE BODIES; AUTOMOBILE MANUFACTURE; AUTOMOTIVE INDUSTRY; COMPUTER AIDED MANUFACTURING; COMPUTER SYSTEMS; ROBOTS; STAMPING;

EID: 0032598267     PISSN: 10871357     EISSN: 15288935     Source Type: Journal    
DOI: 10.1115/1.2832706     Document Type: Article
Times cited : (25)

References (25)
  • 1
    • 85025214702 scopus 로고
    • An Update on Nissan Intelligent Body Assembly System
    • Oct. 31-Nov. 2, Detroit, Michigan, M. Nasim Uddin, ed
    • Abe, K., Hayashi, A., and Sakaino, M., 1995, “An Update on Nissan Intelligent Body Assembly System,” Body Assembly & Manufacturing, Vol. 15, International Body Engineering Conference, Oct. 31-Nov. 2, Detroit, Michigan, M. Nasim Uddin, ed.
    • (1995) Body Assembly & Manufacturing , vol.15
    • Abe, K.1    Hayashi, A.2    Sakaino, M.3
  • 3
    • 0030216880 scopus 로고    scopus 로고
    • Deformable Sheet Metal Fixturing: Principles, Algorithms and Simulations
    • August
    • Cai, W. J., Hu, S. J., and Yuan, J., 1996, “Deformable Sheet Metal Fixturing: Principles, Algorithms and Simulations,” ASME JOURNAL OF MANUFACTURING SCIENCE AND ENGINEERING, Vol. 118, pp. 318-324, August.
    • (1996) ASME JOURNAL OF MANUFACTURING SCIENCE AND ENGINEERING , vol.118 , pp. 318-324
    • Cai, W.J.1    Hu, S.J.2    Yuan, J.3
  • 4
  • 6
    • 3342966156 scopus 로고
    • Fixture Design: Working with Modules
    • January
    • Drake, A., 1984, “Fixture Design: Working with Modules,” Manufacturing Engineering, January, pp. 35-38.
    • (1984) Manufacturing Engineering , pp. 35-38
    • Drake, A.1
  • 8
    • 85025202546 scopus 로고
    • A Brochure of FLEXTOOL® Body Shop Manufacturing Solutions
    • 2000 South Adams Road, Auburn Hills, MI 48326-2800
    • Fanuc Robotics, 1995, “A Brochure of FLEXTOOL® Body Shop Manufacturing Solutions,” FANUC Robotics North America, 2000 South Adams Road, Auburn Hills, MI 48326-2800.
    • (1995) FANUC Robotics North America
    • Robotics, F.1
  • 10
    • 84891330600 scopus 로고
    • TSP P.O. Box 991, Melrose, MA 02176 (Computer Program in C and User Manual—Public Domain for Research Purpose)
    • Grefenstette, J., 1991, GENESIS, TSP P.O. Box 991, Melrose, MA 02176 (Computer Program in C and User Manual—Public Domain for Research Purpose).
    • (1991) GENESIS
    • Grefenstette, J.1
  • 11
    • 0026829852 scopus 로고
    • Optimal Blank Nesting Using Simulated Annealing
    • March 1992
    • Jain, P., Fenyes, P., and Richter, R., 1992, “Optimal Blank Nesting Using Simulated Annealing,” ASME Journal of Mechanical Design, Vol. 114, March 1992, pp. 160-165.
    • (1992) ASME Journal of Mechanical Design , vol.114 , pp. 160-165
    • Jain, P.1    Fenyes, P.2    Richter, R.3
  • 13
    • 85024518717 scopus 로고
    • Optimization Methods Applied to Selecting Support Positions in Fixture Design
    • Menassa, R. J., and DeVries, W. R., 1991, “Optimization Methods Applied to Selecting Support Positions in Fixture Design,” ASME JOURNAL OF ENGINEERING FOR INDUSTRY, Vol. 113, pp. 412-418.
    • (1991) ASME JOURNAL OF ENGINEERING FOR INDUSTRY , vol.113 , pp. 412-418
    • Menassa, R.J.1    Devries, W.R.2
  • 15
    • 0028465107 scopus 로고
    • Agile Manufacturing in a Responsive Factory
    • July
    • O’Connor, Leo, 1994, “Agile Manufacturing in a Responsive Factory,” Mechanical Engineering, pp. 54-57, July.
    • (1994) Mechanical Engineering , pp. 54-57
    • O’Connor, L.1
  • 19
    • 0001675255 scopus 로고
    • Optimal Fixture Design for Deformable Sheet Metal Workpieces
    • Rearick, M. R., Hu, S. J., and Wu, S. M., 1993, “Optimal Fixture Design for Deformable Sheet Metal Workpieces,” Transactions of NAMRI/SME, pp. 407-412.
    • (1993) Transactions of NAMRI/SME , pp. 407-412
    • Rearick, M.R.1    Hu, S.J.2    Wu, S.M.3
  • 22
    • 0002533915 scopus 로고
    • The Second Toyota Paradox: How Delaying Decisions Can Make Better Cars Faster
    • Ward, A., Liker, J., Sobek, D., and Cristiano, J., 1995, “The Second Toyota Paradox: How Delaying Decisions Can Make Better Cars Faster,” Sloan Management Review, Spring, Vol. 36, No. 3, pp. 43-61.
    • (1995) Sloan Management Review, Spring , vol.36 , Issue.3 , pp. 43-61
    • Ward, A.1    Liker, J.2    Sobek, D.3    Cristiano, J.4
  • 24
    • 0024125484 scopus 로고
    • Computer-Aided Analysis of Reconfigurable Fixtures and Sheet Metal Parts for Robotic Drilling
    • Youcef-Toumi, K., Liu, W. S., and Asada, H., 1988, “Computer-Aided Analysis of Reconfigurable Fixtures and Sheet Metal Parts for Robotic Drilling,” Robotics & Computer-Integrated Manufacturing, Vol. 4, No. 3/4, pp. 387-393.
    • (1988) Robotics & Computer-Integrated Manufacturing , vol.4 , Issue.3-4 , pp. 387-393
    • Youcef-Toumi, K.1    Liu, W.S.2    Asada, H.3
  • 25
    • 0027271358 scopus 로고
    • Criteria for Establishing Datums in Manufactured Parts
    • Zhang, X., and Roy, U., 1993, “Criteria for Establishing Datums in Manufactured Parts,” Journal of Manufacturing Systems, Vol. 12, No. 1, pp. 36-50.
    • (1993) Journal of Manufacturing Systems , vol.12 , Issue.1 , pp. 36-50
    • Zhang, X.1    Roy, U.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.