-
1
-
-
0003730982
-
-
MA: Boyd & Fraser
-
Brooke, A., Kendrick, D., and Meeraus, A., 1992, GAMS - A User’s Guide, Release 2.25 (MA: Boyd & Fraser).
-
(1992)
GAMS - a User’s Guide, Release 2.25
-
-
Brooke, A.1
Kendrick, D.2
Meeraus, A.3
-
2
-
-
0345210214
-
Opera - optimal production environment for resource allocation
-
Gramado, RS, Brazil
-
Carvalho, M. F., Fernandes, C. A. O., Silva Filho, O. S., and Varga, E. J., Jr, 1993, Opera - optimal production environment for resource allocation. IFIP Conference on Evaluation of Production Management Methods, Gramado, RS, Brazil.
-
(1993)
IFIP Conference on Evaluation of Production Management Methods
-
-
Carvalho, M.F.1
Fernandes, C.A.O.2
Silva Filho, O.S.3
Varga, E.J.4
-
3
-
-
0345210213
-
Assembly production planning by network flow approach
-
Nance, Metz, France
-
Carvalho, M. F., Fernandes, C. A. O., Ferreira, P. A. V., and Takahashi, M. T., 1998, Assembly production planning by network flow approach. 9th Symposium on Information Control in Manufacturing - INCON’98, Nance, Metz, France.
-
(1998)
9Th Symposium on Information Control in Manufacturing - INCON’98
-
-
Carvalho, M.F.1
Fernandes, C.A.O.2
Ferreira, P.A.V.3
Takahashi, M.T.4
-
4
-
-
0345210211
-
Multicommodity manu- facturing flow problems by a penalty function approach
-
London, UK: Pergamon
-
Fernandes, C. A. O., Carvalho, M. F. H., Ferreira, P. A. V., and Filho, O. S. S., 1995, Multicommodity manu- facturing flow problems by a penalty function approach. IFAC Large Scale Systems (London, UK: Pergamon).
-
(1995)
IFAC Large Scale Systems
-
-
Fernandes, C.A.O.1
Carvalho, M.F.H.2
Ferreira, P.A.V.3
Filho, O.S.S.4
-
6
-
-
0026904594
-
Routing flexibility and production scheduling in a flexible manufacturing system
-
Ghosh, S., and Gaimon, C., 1992, Routing flexibility and production scheduling in a flexible manufacturing system. Eur. J. Oper. Res., 60, 344-364.
-
(1992)
Eur. J. Oper. Res.
, vol.60
, pp. 344-364
-
-
Ghosh, S.1
Gaimon, C.2
-
7
-
-
0012341892
-
OPT uncovered many production planning and scheduling concepts can be applied with or without the software
-
Jacobs, F. R., 1984, OPT uncovered many production planning and scheduling concepts can be applied with or without the software. Ind. Engng, Oct., 32-41.
-
(1984)
Ind. Engng, Oct.
, pp. 32-41
-
-
Jacobs, F.R.1
-
9
-
-
85008829190
-
-
Southern Methodist University, Dallas
-
Kennington, J. L., and Whisman, A., 1990, Netside User’s Guide (Department of Computer Science and Engineering, Southern Methodist University, Dallas).
-
(1990)
Netside User’s Guide (Department of Computer Science and Engineering
-
-
Kennington, J.L.1
Whisman, A.2
-
10
-
-
0023825887
-
A multiobjective, multi-level heuristic for dynamic resource constrained scheduling problems
-
Norbis, M. I., and Macgregor Smith, J., 1988, A multiobjective, multi-level heuristic for dynamic resource constrained scheduling problems. Eur.J. Oper. Res., 33, 30-41.
-
(1988)
Eur.J. Oper. Res.
, vol.33
, pp. 30-41
-
-
Norbis, M.I.1
Macgregor Smith, J.2
-
11
-
-
0021502727
-
Just in time production system. Replacing complexity with simplicity in manufacturing management
-
Schonberger, R. J., 1984, Just in time production system. Replacing complexity with simplicity in manufacturing management. Ind. Engng, Oct., 52-63.
-
(1984)
Ind. Engng, Oct.
, pp. 52-63
-
-
Schonberger, R.J.1
-
12
-
-
0000098625
-
An overview of evaluative models for flexible manufacturing systems
-
Suri, R., 1985, An overview of evaluative models for flexible manufacturing systems. Annals Oper. Res.
-
(1985)
Annals Oper. Res.
-
-
Suri, R.1
-
13
-
-
0025508233
-
Multi-objective, multi-period planning for a manufacturing plant
-
Trzaskalik, T., 1990, Multi-objective, multi-period planning for a manufacturing plant. Engineering Costs and Production Economics, 20, 113-120.
-
(1990)
Engineering Costs and Production Economics
, vol.20
, pp. 113-120
-
-
Trzaskalik, T.1
-
14
-
-
0039932198
-
A smooth penalty function algorithm for network-structured problems
-
Zenios, S. A., Pinar, M. C., and Dembo, R. S., 1995, A smooth penalty function algorithm for network-structured problems. Eur. J. Oper. Res., 83, 220-236.
-
(1995)
Eur. J. Oper. Res.
, vol.83
, pp. 220-236
-
-
Zenios, S.A.1
Pinar, M.C.2
Dembo, R.S.3
|