메뉴 건너뛰기




Volumn 14, Issue 3, 1999, Pages 1078-1084

A multiobjective operations planning model with unit commitment and transmission constraints

Author keywords

[No Author keywords available]

Indexed keywords

COMPUTER PROGRAMMING; CONSTRAINT THEORY; DECISION THEORY; ELECTRIC POWER GENERATION; ELECTRIC POWER TRANSMISSION; MAINTENANCE; MATHEMATICAL MODELS; PLANNING; REACTIVE POWER; SCHEDULING;

EID: 0032592946     PISSN: 08858950     EISSN: None     Source Type: Journal    
DOI: 10.1109/59.780928     Document Type: Article
Times cited : (35)

References (12)
  • 6
    • 0029405654 scopus 로고    scopus 로고
    • "A systems approach to least-cost maintenance scheduling for an interconnected power system" Paper # presented in IEEE/PES Winter Meeting at New York. 1995.
    • D.Chattopadhyay, K.Bhattacharya and J.Parikh,"A systems approach to least-cost maintenance scheduling for an interconnected power system" Paper # presented in IEEE/PES Winter Meeting at New York. 1995.
    • K.Bhattacharya and J.Parikh
    • Chattopadhyay, D.1
  • 11
    • 33747859914 scopus 로고    scopus 로고
    • Integrating demandside options in electric utility planning: a multiobjective approach" Paper # presented in 1EEE/PES Summer Meeting at SanFrancisco.1994
    • D.Chattopadhyay, R.Banerjee and J.Parikh," Integrating demandside options in electric utility planning: a multiobjective approach" Paper # presented in 1EEE/PES Summer Meeting at SanFrancisco.1994
    • R.Banerjee and J.Parikh
    • Chattopadhyay, D.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.