메뉴 건너뛰기




Volumn 49, Issue 5, 1998, Pages 479-491

Proactive expediting policies for recoverable manufacturing

Author keywords

Expediting policies; Recoverable manufacturing; Remanufacturing; Simulation

Indexed keywords


EID: 0032389971     PISSN: 01605682     EISSN: 14769360     Source Type: Journal    
DOI: 10.1057/palgrave.jors.2600527     Document Type: Article
Times cited : (12)

References (36)
  • 1
    • 0014520366 scopus 로고
    • A simulation study of expediting in a job shop
    • Hottenstein M (1969). A simulation study of expediting in a job shop. Prod Inven Mgmt 9: 1-11.
    • (1969) Prod Inven Mgmt , vol.9 , pp. 1-11
    • Hottenstein, M.1
  • 2
    • 0014749165 scopus 로고
    • Expediting in job-order control systems: A simulation study
    • Hottenstein M (1970). Expediting in job-order control systems: A simulation study. AIIE Trans 2: 46-54.
    • (1970) AIIE Trans , vol.2 , pp. 46-54
    • Hottenstein, M.1
  • 3
    • 0021370421 scopus 로고
    • Remanufacturing
    • Lund R (1984). Remanufacturing. Technol Rev 87: 18-23.
    • (1984) Technol Rev , vol.87 , pp. 18-23
    • Lund, R.1
  • 4
    • 0011757568 scopus 로고
    • Production planning and inventory control for remanufacturable durable products
    • Erasmus University Rotterdam, The Netherlands
    • Laan van der E, Salomon M and Dekker R (1995). Production planning and inventory control for remanufacturable durable products, Report 9531/A, Erasmus University Rotterdam, The Netherlands.
    • (1995) Report 9531/A
    • Laan Van Der, E.1    Salomon, M.2    Dekker, R.3
  • 5
    • 0030129785 scopus 로고
    • Scheduling using drum-buffer rope in a remanufacturing environment
    • Guide Jr VDR (1966). Scheduling using drum-buffer rope in a remanufacturing environment. Int J Prod Res 34: 1081-1091.
    • (1966) Int J Prod Res , vol.34 , pp. 1081-1091
    • Guide, V.1
  • 6
    • 84987044773 scopus 로고
    • Planning and scheduling the repair shops of the Deutsche Luftansa AG: A hierarchical approach
    • Schneeweiss C and Schroder H (1991). Planning and scheduling the repair shops of the Deutsche Luftansa AG: A hierarchical approach. Prod Opns Mgmt 1: 22-33.
    • (1991) Prod Opns Mgmt , vol.1 , pp. 22-33
    • Schneeweiss, C.1    Schroder, H.2
  • 7
    • 0042498352 scopus 로고
    • Performance analysis and capacity planning of a landing gear shop
    • Srikar B and Vinod B (1989). Performance analysis and capacity planning of a landing gear shop. Interfaces 19: 52-60.
    • (1989) Interfaces , vol.19 , pp. 52-60
    • Srikar, B.1    Vinod, B.2
  • 8
    • 0028330626 scopus 로고
    • A simulation study of unit exchange spares management of diesel locomotives in the Indian railway
    • Kumar N, Vrat P and Sushil (1994). A simulation study of unit exchange spares management of diesel locomotives in the Indian railway. Int J Prod Econ 33: 225-236.
    • (1994) Int J Prod Econ , vol.33 , pp. 225-236
    • Kumar, N.1    Vrat, P.2
  • 9
    • 0024142713 scopus 로고
    • MRPII for repair/refurbish industries
    • Panisett B (1988). MRPII for repair/refurbish industries. Prod Invent Mgmt J 29: 12-15.
    • (1988) Prod Invent Mgmt J , vol.29 , pp. 12-15
    • Panisett, B.1
  • 11
    • 0011725222 scopus 로고
    • Core obsolescence forecasting in remanufacturing
    • Krupp J (1992). Core obsolescence forecasting in remanufacturing. Prod Invent Mgmt J 33: 12-17.
    • (1992) Prod Invent Mgmt J , vol.33 , pp. 12-17
    • Krupp, J.1
  • 12
    • 0027908820 scopus 로고
    • Structuring bills of material for automotive remanufacturing
    • Krupp J (1993). Structuring bills of material for automotive remanufacturing. Prod Invent Mgmt J 34: 46-52.
    • (1993) Prod Invent Mgmt J , vol.34 , pp. 46-52
    • Krupp, J.1
  • 13
    • 0039052992 scopus 로고
    • The impact of lot size and production scheduling on inventory investment in a remanufacturing environment
    • Perry J (1991). The impact of lot size and production scheduling on inventory investment in a remanufacturing environment. Prod Invent Mgmt J 32: 41-45.
    • (1991) Prod Invent Mgmt J , vol.32 , pp. 41-45
    • Perry, J.1
  • 14
    • 0039645194 scopus 로고
    • On the logistic aspects of integrating procurement, production and recycling by lean and agile-wise manufacturing companies
    • Pawar KS, Automotive Automation Ltd.: Germany
    • Flapper SDP (1994). On the logistic aspects of integrating procurement, production and recycling by lean and agile-wise manufacturing companies. In: Pawar KS (ed) International Dedicated Conference on Lean/Agile Manufacturing in the Automotive Industries, Automotive Automation Ltd.: Germany, pp 749-756.
    • (1994) International Dedicated Conference on Lean/Agile Manufacturing in the Automotive Industries , pp. 749-756
    • Flapper, S.1
  • 15
    • 0011778547 scopus 로고
    • On the operational logistic aspects of reuse
    • Pawer KS, Automotive Automation Ltd.: Germany
    • Flapper SDP (1995). On the operational logistic aspects of reuse. In: Pawer KS (ed). Proceedings of the Second International Symposium on Logistics. Automotive Automation Ltd.: Germany, pp 343-348.
    • (1995) Proceedings of the Second International Symposium on Logistics , pp. 343-348
    • Flapper, S.1
  • 16
    • 0001353411 scopus 로고
    • Scheduling disassembly
    • Gupta S and Taleb K (1994). Scheduling disassembly. Int J Prod Res 32: 1857-1868.
    • (1994) Int J Prod Res , vol.32 , pp. 1857-1868
    • Gupta, S.1    Taleb, K.2
  • 17
    • 84952519001 scopus 로고
    • Planning product disassembly for material recovery opportunities
    • Johnson MR and Wang MH (1995). Planning product disassembly for material recovery opportunities. Int J Prod Res 33: 3119-3142.
    • (1995) Intj Prod Res , vol.33 , pp. 3119-3142
    • Johnson, M.R.1    Wang, M.H.2
  • 18
    • 0031118844 scopus 로고    scopus 로고
    • Rough cut capacity planning for remanufacturing firms
    • Guide Jr VDR and Spencer MS (1997). Rough cut capacity planning for remanufacturing firms. Prod Plan and Cont 8: 237-244.
    • (1997) Prod Plan and Cont , vol.8 , pp. 237-244
    • Guide, V.1    Spencer, M.S.2
  • 19
    • 0030871134 scopus 로고    scopus 로고
    • An evaluation of capacity planning techniques in a remanufacturing environment
    • Guide Jr VDR, Srivastava R and Spencer MS (1997). An evaluation of capacity planning techniques in a remanufacturing environment. Int J Prod Res 35: 67-82.
    • (1997) Int J Prod Res , vol.35 , pp. 67-82
    • Guide, V.1    Srivastava, R.2    Spencer, M.S.3
  • 20
    • 0003347011 scopus 로고
    • Dispatching
    • Salvendy G, John Wiley & Sons: New York
    • Bhaskaran K and Pinedo M (1992). Dispatching. In: Salvendy G (ed). Handbook of Industrial Engineering. John Wiley & Sons: New York, pp 2184-2198.
    • (1992) Handbook of Industrial Engineering , pp. 2184-2198
    • Bhaskaran, K.1    Pinedo, M.2
  • 21
    • 0024641735 scopus 로고
    • The effects of product structure and sequencing rules on assembly shop performance
    • Fry TD, Oliff MD, Minor ED and Leong K (1989). The effects of product structure and sequencing rules on assembly shop performance. Int J Prod Res 27: 671-686.
    • (1989) Int J Prod Res , vol.27 , pp. 671-686
    • Fry, T.D.1    Oliff, M.D.2    Minor, E.D.3    Leong, K.4
  • 22
    • 0022681216 scopus 로고
    • Evaluating scheduling policies in a multi-level assembly system
    • Goodwin JS and Weeks JK (1986). Evaluating scheduling policies in a multi-level assembly system. Int J Prod Res 24: 247-257.
    • (1986) Int J Prod Res , vol.24 , pp. 247-257
    • Goodwin, J.S.1    Weeks, J.K.2
  • 23
    • 84989446840 scopus 로고
    • Operating policies for scheduling assembled products
    • Goodwin JS and Goodwin Jr JC (1992). Operating policies for scheduling assembled products. Decis Sci 13: 585-603.
    • (1992) Decis Sci , vol.13 , pp. 585-603
    • Goodwin, J.S.1    Goodwin, J.C.2
  • 24
    • 38249004133 scopus 로고
    • Sequencing rules, progress milestones and product structures in a multistage job shop
    • Philipoom PR, Markland RE and Fry TD (1989). Sequencing rules, progress milestones and product structures in a multistage job shop. J Opns Mgmt 8: 209-229.
    • (1989) J Opns Mgmt , vol.8 , pp. 209-229
    • Philipoom, P.R.1    Markland, R.E.2    Fry, T.D.3
  • 25
    • 84985747359 scopus 로고
    • An evaluation of sequencing rules for an assembly shop
    • Russell RS and Taylor BW (1985). An evaluation of sequencing rules for an assembly shop. Decis Sci 16: 196-212.
    • (1985) Decis Sci , vol.16 , pp. 196-212
    • Russell, R.S.1    Taylor, B.W.2
  • 26
    • 0022130137 scopus 로고
    • An evaluation of scheduling policies in a dual constrained assembly shop
    • Russell RS and Taylor BW (1985). An evaluation of scheduling policies in a dual constrained assembly shop. IEE Trans 17: 219-232.
    • (1985) IEE Trans , vol.17 , pp. 219-232
    • Russell, R.S.1    Taylor, B.W.2
  • 27
    • 0023418695 scopus 로고
    • Priority assignment procedures in multi-level assembly job shops
    • Adam NR, Bertrand JMW and Surkis J (1987). Priority assignment procedures in multi-level assembly job shops. IIE Trans 19: 317-328.
    • (1987) IIE Trans , vol.19 , pp. 317-328
    • Adam, N.R.1    Bertrand, J.2    Surkis, J.3
  • 28
    • 0004146861 scopus 로고
    • Priority dispatching and assembly operations in a job shop
    • The rAnD Corporation, USA
    • Maxwell WL (1969). Priority dispatching and assembly operations in a job shop, Memorandum RM-5370-PR, The rAnD Corporation, USA.
    • (1969) Memorandum RM-5370-PR
    • Maxwell, W.L.1
  • 29
    • 0021424669 scopus 로고
    • A comparative study of priority dispatching rules in a hybrid assembly/shop
    • Huang PY (1984). A comparative study of priority dispatching rules in a hybrid assembly/shop. Int J Prod Res 22: 375-387.
    • (1984) Int J Prod Res , vol.22 , pp. 375-387
    • Huang, P.Y.1
  • 30
    • 0021899335 scopus 로고
    • Priority rules for shop floor control in a material requirements planning system under various levels of capacity
    • Biggs JR (1985). Priority rules for shop floor control in a material requirements planning system under various levels of capacity. Int J Prod Res 23: 33-46.
    • (1985) Int J Prod Res , vol.23 , pp. 33-46
    • Biggs, J.R.1
  • 32
    • 0020393745 scopus 로고
    • Job shop sheduling—a systematic approach
    • Dar-El EM and Wysk RA (1982). Job shop sheduling—a systematic approach. JManufact Sys 1: 77-88.
    • (1982) Jmanufact Sys , vol.1 , pp. 77-88
    • Dar-El, E.M.1    Wysk, R.A.2
  • 33
    • 84984715800 scopus 로고
    • U.S. Congress Office of Technology Assessment: U.S
    • Green Products by Design (1992). U.S. Congress Office of Technology Assessment: U.S. Government Printing Office.
    • (1992) Government Printing Office
  • 34
    • 0001274658 scopus 로고
    • Multiple-factor rules for sequencing with assembly constraints
    • Maxwell WL and Mehra M (1968). Multiple-factor rules for sequencing with assembly constraints. Naval Res Logist Q 15: 241-254.
    • (1968) Naval Res Logist Q , vol.15 , pp. 241-254
    • Maxwell, W.L.1    Mehra, M.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.