|
Volumn 6, Issue 12, 1998, Pages 1531-1539
|
Optimization of boiler control to improve the load-following capability of power-plant units
|
Author keywords
Boilers; Feedback control; Feedforward control; LQG control; Multivariable control; Optimization; Power station control; Scheduling algorithms
|
Indexed keywords
ALGORITHMS;
ELECTRIC LOADS;
ELECTRIC POWER PLANTS;
FEEDBACK CONTROL;
MULTIVARIABLE CONTROL SYSTEMS;
NONLINEAR CONTROL SYSTEMS;
OPTIMIZATION;
PROCESS CONTROL;
FAST LOAD CHANGES;
FEEDFORWARD CONTROL;
SCHEDULING ALGORITHMS;
BOILER CONTROL;
|
EID: 0032319334
PISSN: 09670661
EISSN: None
Source Type: Journal
DOI: 10.1016/S0967-0661(98)00114-2 Document Type: Article |
Times cited : (41)
|
References (12)
|