메뉴 건너뛰기




Volumn 39, Issue 4, 1998, Pages 77-82

Setup reduction through process improvement in aluminum can manufacturing

Author keywords

[No Author keywords available]

Indexed keywords

COST EFFECTIVENESS; PROCESS ENGINEERING; QUALITY ASSURANCE;

EID: 0032298506     PISSN: 08978336     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (4)

References (7)
  • 2
    • 0004034817 scopus 로고
    • New York: North River Press, Inc.
    • _. Theory of Constraints. New York: North River Press, Inc., 1990.
    • (1990) Theory of Constraints
  • 3
    • 0348155570 scopus 로고
    • New York: North River Press, Inc.
    • nd rev. ed. New York: North River Press, Inc., 1992.
    • (1992) nd Rev. Ed.
  • 4
    • 0003710588 scopus 로고
    • New York: North River Press, Inc.
    • _, and R. Fox. The Race. New York: North River Press, Inc., 1986.
    • (1986) The Race
    • Fox, R.1
  • 5
    • 0003410612 scopus 로고
    • Cambridge, MA: Productivity Press, Inc.
    • Nakajima, S. Introduction to TPM. Cambridge, MA: Productivity Press, Inc., 1988.
    • (1988) Introduction to TPM
    • Nakajima, S.1
  • 7
    • 0040656044 scopus 로고    scopus 로고
    • The Fifth Column: The Lieutenant Colonel and Logistics and the Captain and the Claim
    • Woolsey, R.E.D. "The Fifth Column: The Lieutenant Colonel and Logistics and the Captain and the Claim." Interfaces 26, no. 6 (1996): 79-81.
    • (1996) Interfaces , vol.26 , Issue.6 , pp. 79-81
    • Woolsey, R.E.D.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.