메뉴 건너뛰기




Volumn 14, Issue 4, 1998, Pages 309-321

On the optimal ordering policies in maintenance theory - Survey and applications

Author keywords

Long run average cost; Ordering policy; Preventive maintenance; Renewal reward process; Spare part inventory

Indexed keywords

COST EFFECTIVENESS; INVENTORY CONTROL; MACHINE COMPONENTS; MATHEMATICAL MODELS; NUMERICAL METHODS; PREVENTIVE MAINTENANCE;

EID: 0032231270     PISSN: 87550024     EISSN: None     Source Type: Journal    
DOI: 10.1002/(sici)1099-0747(199812)14:4<309::aid-asm351>3.3.co;2-i     Document Type: Article
Times cited : (24)

References (58)
  • 3
    • 0012069773 scopus 로고
    • An ordering policy for repairable stock items
    • S. G. Allen and D. A. D'Esopo, 'An ordering policy for repairable stock items', Oper. Res., 16, 669-674 (1968).
    • (1968) Oper. Res. , vol.16 , pp. 669-674
    • Allen, S.G.1    D'Esopo, D.A.2
  • 4
    • 0001078190 scopus 로고
    • An ordering policy for stock items when delivery can expedited
    • S. G. Allen and D. A. D'Esopo, 'An ordering policy for stock items when delivery can expedited', Oper. Res., 16, 880-883 (1968).
    • (1968) Oper. Res. , vol.16 , pp. 880-883
    • Allen, S.G.1    D'Esopo, D.A.2
  • 5
    • 0039757793 scopus 로고
    • A minimum cost model of spare parts inventory control
    • A. D. Wiggins, 'A minimum cost model of spare parts inventory control', Technometrics, 9, 661-665 (1967).
    • (1967) Technometrics , vol.9 , pp. 661-665
    • Wiggins, A.D.1
  • 6
    • 0001687830 scopus 로고
    • Optimum replacement policies with delay
    • T. Nakagawa and S. Osaki, 'Optimum replacement policies with delay', J. Appl. Probab., 11, 102-110 (1974).
    • (1974) J. Appl. Probab. , vol.11 , pp. 102-110
    • Nakagawa, T.1    Osaki, S.2
  • 7
    • 0016948973 scopus 로고
    • On scheduling the delivery of spare units
    • T. Nakagawa, 'On scheduling the delivery of spare units', IEEE Trans. Rehab., R-25, 35-37 (1976).
    • (1976) IEEE Trans. Rehab. , vol.R-25 , pp. 35-37
    • Nakagawa, T.1
  • 8
    • 0008102339 scopus 로고
    • An ordering policy with lead time
    • S. Osaki, 'An ordering policy with lead time', Int. J. Systems Sci., 8, 1091-1095 (1977).
    • (1977) Int. J. Systems Sci. , vol.8 , pp. 1091-1095
    • Osaki, S.1
  • 13
    • 0030269391 scopus 로고    scopus 로고
    • Optimal planned maintenance with salvage cost for a two-unit standby redundant system
    • T. Dohi, N. Kaio and S. Osaki, 'Optimal planned maintenance with salvage cost for a two-unit standby redundant system', Microelectron. Rehab., 36, 1581-1588 (1996).
    • (1996) Microelectron. Rehab. , vol.36 , pp. 1581-1588
    • Dohi, T.1    Kaio, N.2    Osaki, S.3
  • 14
    • 0029767761 scopus 로고    scopus 로고
    • Optimal ordering policies with time-dependent delay structure
    • T. Dohi, N. Kaio and S. Osaki, 'Optimal ordering policies with time-dependent delay structure', J. Quality. Maintenance Engng., 26, 50-62 (1996).
    • (1996) J. Quality. Maintenance Engng. , vol.26 , pp. 50-62
    • Dohi, T.1    Kaio, N.2    Osaki, S.3
  • 15
    • 0017638765 scopus 로고
    • Ordering policies with two types of lead times
    • N. Kaio and S. Osaki, 'Ordering policies with two types of lead times', Microelectron. Reliab., 16, 225-229 (1977),.
    • (1977) Microelectron. Reliab. , vol.16 , pp. 225-229
    • Kaio, N.1    Osaki, S.2
  • 16
    • 0018019976 scopus 로고
    • Optimum ordering policies with lead time for an operating unit in preventive maintenance
    • N. Kaio and S. Osaki, 'Optimum ordering policies with lead time for an operating unit in preventive maintenance', IEEE Trans. Reliab., R-27, 270-271 (1978).
    • (1978) IEEE Trans. Reliab. , vol.R-27 , pp. 270-271
    • Kaio, N.1    Osaki, S.2
  • 18
    • 0017943678 scopus 로고
    • Optimum ordering policies with two kinds of lead times and non-linear ordering costs
    • N. Kaio and S. Osaki, 'Optimum ordering policies with two kinds of lead times and non-linear ordering costs', Int. J. Systems Sci., 9, 265-272 (1978).
    • (1978) Int. J. Systems Sci. , vol.9 , pp. 265-272
    • Kaio, N.1    Osaki, S.2
  • 19
    • 0017962330 scopus 로고
    • Optimum planned maintenance with salvage cost'
    • N. Kaio and S. Osaki, 'Optimum planned maintenance with salvage cost', Int. J. Pro. Res., 16, 249-257 (1978).
    • (1978) Int. J. Pro. Res. , vol.16 , pp. 249-257
    • Kaio, N.1    Osaki, S.2
  • 20
    • 0018046994 scopus 로고
    • Optimum inspection-ordering policies with salvage cost
    • N. Kaio and S. Osaki, 'Optimum inspection-ordering policies with salvage cost', Microelectron. Reliab., 18, 253-257 (1978).
    • (1978) Microelectron. Reliab. , vol.18 , pp. 253-257
    • Kaio, N.1    Osaki, S.2
  • 21
    • 0018476845 scopus 로고
    • Extended optimum ordering policies
    • N. Kaio and S. Osaki, 'Extended optimum ordering policies', Electron. Commun. Japan, 62-A, 19-27 (1979).
    • (1979) Electron. Commun. Japan , vol.62 A , pp. 19-27
    • Kaio, N.1    Osaki, S.2
  • 22
    • 0018469107 scopus 로고
    • Optimum ordering policies with discounting when order costs depend on time
    • N. Kaio and S. Osaki, 'Optimum ordering policies with discounting when order costs depend on time', Int. J. Systems Sci., 10, 539-555 (1979).
    • (1979) Int. J. Systems Sci. , vol.10 , pp. 539-555
    • Kaio, N.1    Osaki, S.2
  • 23
    • 1542550352 scopus 로고
    • Extended optimum ordering policies with discounting
    • N. Kaio and S. Osaki, 'Extended optimum ordering policies with discounting', Int. J. Systems Sci., 11, 149-157 (1980).
    • (1980) Int. J. Systems Sci. , vol.11 , pp. 149-157
    • Kaio, N.1    Osaki, S.2
  • 24
    • 0019035435 scopus 로고
    • Optimum planned maintenance with discounting
    • N. Kaio and S. Osaki, 'Optimum planned maintenance with discounting.', Int. J. Pro. Res., 18, 515-523 (1980).
    • (1980) Int. J. Pro. Res. , vol.18 , pp. 515-523
    • Kaio, N.1    Osaki, S.2
  • 25
    • 0019554744 scopus 로고
    • Optimum planned maintenance policies with lead time
    • N. Kaio and S. Osaki, 'Optimum planned maintenance policies with lead time', IEEE Trans. Reliab. R-30, 79 (1981).
    • (1981) IEEE Trans. Reliab. , vol.R-30 , pp. 79
    • Kaio, N.1    Osaki, S.2
  • 27
    • 0346490745 scopus 로고
    • Optimal ordering policies with two types of randomized lead times
    • N. Kaio and S. Osaki, 'Optimal ordering policies with two types of randomized lead times', Comput. Math. Appl. 19, 43-52 (1990).
    • (1990) Comput. Math. Appl. , vol.19 , pp. 43-52
    • Kaio, N.1    Osaki, S.2
  • 28
    • 0025592491 scopus 로고
    • Optimum ordering policies with non-linear running and salvage costs
    • N. Kaio and S. Osaki, 'Optimum ordering policies with non-linear running and salvage costs', Microelectron. Reliab., 30, 785-793 (1990).
    • (1990) Microelectron. Reliab. , vol.30 , pp. 785-793
    • Kaio, N.1    Osaki, S.2
  • 29
    • 1542655318 scopus 로고
    • Optimal maintenance policies with lead times and repair
    • N. Kaio, T. Dohi and S. Osaki, 'Optimal maintenance policies with lead times and repair', Int. J. Systems Sci., 23, 1299-1308 (1992).
    • (1992) Int. J. Systems Sci. , vol.23 , pp. 1299-1308
    • Kaio, N.1    Dohi, T.2    Osaki, S.3
  • 30
    • 0019709610 scopus 로고
    • Optimum ordering policies with random lead times
    • S. Kalpakam and M. A. Shaul Hameed, 'Optimum ordering policies with random lead times', Microelectron. Reliab., 21, 737-741 (1981).
    • (1981) Microelectron. Reliab. , vol.21 , pp. 737-741
    • Kalpakam, S.1    Shaul Hameed, M.A.2
  • 31
    • 0017546315 scopus 로고
    • Optimal ordering and replacement for a 1-unit system
    • H. Mine and H. Kawai, 'Optimal ordering and replacement for a 1-unit system', IEEE Trans. Reliab., R-26, 273-276 (1977).
    • (1977) IEEE Trans. Reliab. , vol.R-26 , pp. 273-276
    • Mine, H.1    Kawai, H.2
  • 32
    • 0018031566 scopus 로고
    • Optimum ordering policies with lead time for an operating unit
    • T. Nakagawa and S. Osaki, 'Optimum ordering policies with lead time for an operating unit', R.A.I.R.O. Res. Oper. - Oper. Res., 12, 383-393 (1978).
    • (1978) R.A.I.R.O. Res. Oper. - Oper. Res. , vol.12 , pp. 383-393
    • Nakagawa, T.1    Osaki, S.2
  • 33
    • 0017252561 scopus 로고
    • Age replacement with lead time
    • S. Osaki and S. Yamada, 'Age replacement with lead time', IEEE Trans. Reliab. R-25, 344-345 (1976).
    • (1976) IEEE Trans. Reliab. , vol.R-25 , pp. 344-345
    • Osaki, S.1    Yamada, S.2
  • 34
  • 35
    • 0022700781 scopus 로고
    • Ordering policies under minimal repair
    • K. S. Park and Y. T. Park, 'Ordering policies under minimal repair', IEEE Trans. Reliab., R-35, 82-84 (1986).
    • (1986) IEEE Trans. Reliab. , vol.R-35 , pp. 82-84
    • Park, K.S.1    Park, Y.T.2
  • 36
    • 0022679932 scopus 로고
    • Generalized spare ordering policies with random lead time
    • Y. T. Park and K. S. Park, 'Generalized spare ordering policies with random lead time', Euro. J. Oper. Res., 23, 320-330 (1986).
    • (1986) Euro. J. Oper. Res. , vol.23 , pp. 320-330
    • Park, Y.T.1    Park, K.S.2
  • 37
    • 0026910493 scopus 로고
    • An ordering policy with age-dependent minimal repair and age-dependent random repair costs
    • S. Sheu and C. Liou, 'An ordering policy with age-dependent minimal repair and age-dependent random repair costs', Microelectron. Reliab., 32, 1105-1113 (1992).
    • (1992) Microelectron. Reliab. , vol.32 , pp. 1105-1113
    • Sheu, S.1    Liou, C.2
  • 38
    • 1542445731 scopus 로고
    • Optimum ordering policies with age-dependent minimal repair and two types of lead times
    • S. Sheu and C. Liou, 'Optimum ordering policies with age-dependent minimal repair and two types of lead times', Int. J. Systems Sci., 24, 253-264 (1993).
    • (1993) Int. J. Systems Sci. , vol.24 , pp. 253-264
    • Sheu, S.1    Liou, C.2
  • 39
    • 0008141282 scopus 로고
    • Generalized ordering policies with general random minimal repair costs and random lead times
    • S. Sheu and C. Liou, 'Generalized ordering policies with general random minimal repair costs and random lead times', R.A.I.R.O. Res. Oper. - Oper. Res., 28, 97-118 (1994).
    • (1994) R.A.I.R.O. Res. Oper. - Oper. Res. , vol.28 , pp. 97-118
    • Sheu, S.1    Liou, C.2
  • 40
    • 0026898373 scopus 로고
    • Optimal ordering policies and optimal number of minimal repairs before replacement
    • S. Sheu, C. Liou and B. Tseng, 'Optimal ordering policies and optimal number of minimal repairs before replacement', Microelectron. Reliab., 32, 995-1002 (1992).
    • (1992) Microelectron. Reliab. , vol.32 , pp. 995-1002
    • Sheu, S.1    Liou, C.2    Tseng, B.3
  • 41
    • 0027641201 scopus 로고
    • A note on ordering policies with cost observation and lead times
    • V. Sridharan, 'A note on ordering policies with cost observation and lead times', Int. J. Prd. Econom. 32, 91-97 (1991).
    • (1991) Int. J. Prd. Econom. , vol.32 , pp. 91-97
    • Sridharan, V.1
  • 42
    • 0024874807 scopus 로고
    • Optimum ordering policies with random lead times and salvage cost
    • R. Subramanian and V. Sridharan, 'Optimum ordering policies with random lead times and salvage cost', Microelectron. Reliab., 29, 523-527 (1989).
    • (1989) Microelectron. Reliab. , vol.29 , pp. 523-527
    • Subramanian, R.1    Sridharan, V.2
  • 43
    • 0022441552 scopus 로고
    • Optimum ordering policies for an equipment with a sensing device
    • C. S. Sung and Y. K. Park, 'Optimum ordering policies for an equipment with a sensing device', Microelectron. Reliab., 26, 87-98 (1986).
    • (1986) Microelectron. Reliab. , vol.26 , pp. 87-98
    • Sung, C.S.1    Park, Y.K.2
  • 44
    • 0345859933 scopus 로고
    • Optimum ordering policy under random lead time for equipment with sensor
    • C. S. Sung and C. H. Kim, 'Optimum ordering policy under random lead time for equipment with sensor', IEEE Trans. Reliab., R-36, 467-469 (1987).
    • (1987) IEEE Trans. Reliab. , vol.R-36 , pp. 467-469
    • Sung, C.S.1    Kim, C.H.2
  • 45
    • 0018032458 scopus 로고
    • An optimal ordering policy for a spare unit with lead time
    • L. C. Thomas and S. Osaki, 'An optimal ordering policy for a spare unit with lead time', Euro. J. Oper. Res., 2, 409-419 (1978).
    • (1978) Euro. J. Oper. Res. , vol.2 , pp. 409-419
    • Thomas, L.C.1    Osaki, S.2
  • 46
    • 0008143392 scopus 로고
    • A note on ordering policy
    • L. C. Thomas and S. Osaki, 'A note on ordering policy', IEEE Trans. Reliab., R-27, 380-381 (1978).
    • (1978) IEEE Trans. Reliab. , vol.R-27 , pp. 380-381
    • Thomas, L.C.1    Osaki, S.2
  • 47
    • 0018737824 scopus 로고
    • Discrete-time ordering policies
    • N. Kaio and S. Osaki, 'Discrete-time ordering policies', IEEE Trans. Reliab., R-28, 405-406 (1979).
    • (1979) IEEE Trans. Reliab. , vol.R-28 , pp. 405-406
    • Kaio, N.1    Osaki, S.2
  • 50
    • 1542655317 scopus 로고
    • An optimal ordering and replacement policy of a Markovian degradation system under incomplete observation: Part II
    • H. Kawai, 'An optimal ordering and replacement policy of a Markovian degradation system under incomplete observation: part II', J. Oper. Res. Soc. Japan, 26, 293-308 (1983).
    • (1983) J. Oper. Res. Soc. Japan , vol.26 , pp. 293-308
    • Kawai, H.1
  • 51
    • 0037823579 scopus 로고
    • An optimal ordering and replacement policy of a Markovian degradation system under complete observation: Part I
    • H. Kawai, 'An optimal ordering and replacement policy of a Markovian degradation system under complete observation: part I', J. Oper. Res. Soc. Japan, 26, 279-292 (1983).
    • (1983) J. Oper. Res. Soc. Japan , vol.26 , pp. 279-292
    • Kawai, H.1
  • 52
    • 84974875101 scopus 로고
    • Refined asymptotic costs for renewal reward processes
    • A. H. Christer, 'Refined asymptotic costs for renewal reward processes', J. Oper. Res. Soc., 29, 577-588 (1978).
    • (1978) J. Oper. Res. Soc. , vol.29 , pp. 577-588
    • Christer, A.H.1
  • 53
    • 0000124989 scopus 로고
    • A marginal cost analysis for preventive replacement policies
    • M. Berg, 'A marginal cost analysis for preventive replacement policies', Euro. J. Oper. Res., 4, 136-142 (1980).
    • (1980) Euro. J. Oper. Res. , vol.4 , pp. 136-142
    • Berg, M.1
  • 54
    • 0347751436 scopus 로고
    • Monitored replenishment rules for a continuous review cyclic inventory system
    • T. Dohi, N. Kaio and S. Osaki, 'Monitored replenishment rules for a continuous review cyclic inventory system', IMA J. Math. Appl. Bus. Ind., 6, 223-237 (1995).
    • (1995) IMA J. Math. Appl. Bus. Ind. , vol.6 , pp. 223-237
    • Dohi, T.1    Kaio, N.2    Osaki, S.3
  • 55
    • 0042023658 scopus 로고
    • Continuous review cyclic inventory models with emergency order
    • T. Dohi, N. Kaio and S. Osaki, 'Continuous review cyclic inventory models with emergency order', J. Oper. Res. Soc. Japan, 38, 212-229 (1995).
    • (1995) J. Oper. Res. Soc. Japan , vol.38 , pp. 212-229
    • Dohi, T.1    Kaio, N.2    Osaki, S.3
  • 56
    • 1542760541 scopus 로고    scopus 로고
    • Spare parts inventory control policies under cost effectiveness criterion
    • T. Dohi, N. Kaio and S. Osaki, 'Spare parts inventory control policies under cost effectiveness criterion', Proc. 14th Int. Conf. Production Research, 1997, pp. 1036-1039.
    • (1997) Proc. 14th Int. Conf. Production Research , pp. 1036-1039
    • Dohi, T.1    Kaio, N.2    Osaki, S.3
  • 57
    • 0031272896 scopus 로고    scopus 로고
    • Models for 1-out-of-Q systems with stochastic lead times and expedited ordering options for spares inventory
    • T. Dohi, T. Shibuya and S. Osaki, 'Models for 1-out-of-Q systems with stochastic lead times and expedited ordering options for spares inventory', Eur. J. Opel. Res., 103, 255-272 (1997).
    • (1997) Eur. J. Opel. Res. , vol.103 , pp. 255-272
    • Dohi, T.1    Shibuya, T.2    Osaki, S.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.