-
3
-
-
0012069773
-
An ordering policy for repairable stock items
-
S. G. Allen and D. A. D'Esopo, 'An ordering policy for repairable stock items', Oper. Res., 16, 669-674 (1968).
-
(1968)
Oper. Res.
, vol.16
, pp. 669-674
-
-
Allen, S.G.1
D'Esopo, D.A.2
-
4
-
-
0001078190
-
An ordering policy for stock items when delivery can expedited
-
S. G. Allen and D. A. D'Esopo, 'An ordering policy for stock items when delivery can expedited', Oper. Res., 16, 880-883 (1968).
-
(1968)
Oper. Res.
, vol.16
, pp. 880-883
-
-
Allen, S.G.1
D'Esopo, D.A.2
-
5
-
-
0039757793
-
A minimum cost model of spare parts inventory control
-
A. D. Wiggins, 'A minimum cost model of spare parts inventory control', Technometrics, 9, 661-665 (1967).
-
(1967)
Technometrics
, vol.9
, pp. 661-665
-
-
Wiggins, A.D.1
-
6
-
-
0001687830
-
Optimum replacement policies with delay
-
T. Nakagawa and S. Osaki, 'Optimum replacement policies with delay', J. Appl. Probab., 11, 102-110 (1974).
-
(1974)
J. Appl. Probab.
, vol.11
, pp. 102-110
-
-
Nakagawa, T.1
Osaki, S.2
-
7
-
-
0016948973
-
On scheduling the delivery of spare units
-
T. Nakagawa, 'On scheduling the delivery of spare units', IEEE Trans. Rehab., R-25, 35-37 (1976).
-
(1976)
IEEE Trans. Rehab.
, vol.R-25
, pp. 35-37
-
-
Nakagawa, T.1
-
8
-
-
0008102339
-
An ordering policy with lead time
-
S. Osaki, 'An ordering policy with lead time', Int. J. Systems Sci., 8, 1091-1095 (1977).
-
(1977)
Int. J. Systems Sci.
, vol.8
, pp. 1091-1095
-
-
Osaki, S.1
-
11
-
-
1542445732
-
-
Technical Report, Department of Mathematics, University of Bradford, SOR 96-75
-
A. Csenki, 'Marginal cost analysis of some basic ordering policies for a spare unit and extensions', Technical Report, Department of Mathematics, University of Bradford, SOR 96-75, 1996.
-
(1996)
Marginal Cost Analysis of Some Basic Ordering Policies for a Spare Unit and Extensions
-
-
Csenki, A.1
-
12
-
-
1542445736
-
-
Technical Report, Department of Mathematics, University of Bradford, SOR 96-77
-
A. Csenki, 'Refined asymptotic analysis of two basic order-replacement models for a spare unit', Technical Report, Department of Mathematics, University of Bradford, SOR 96-77, 1996.
-
(1996)
Refined Asymptotic Analysis of Two Basic Order-replacement Models for a Spare Unit
-
-
Csenki, A.1
-
13
-
-
0030269391
-
Optimal planned maintenance with salvage cost for a two-unit standby redundant system
-
T. Dohi, N. Kaio and S. Osaki, 'Optimal planned maintenance with salvage cost for a two-unit standby redundant system', Microelectron. Rehab., 36, 1581-1588 (1996).
-
(1996)
Microelectron. Rehab.
, vol.36
, pp. 1581-1588
-
-
Dohi, T.1
Kaio, N.2
Osaki, S.3
-
14
-
-
0029767761
-
Optimal ordering policies with time-dependent delay structure
-
T. Dohi, N. Kaio and S. Osaki, 'Optimal ordering policies with time-dependent delay structure', J. Quality. Maintenance Engng., 26, 50-62 (1996).
-
(1996)
J. Quality. Maintenance Engng.
, vol.26
, pp. 50-62
-
-
Dohi, T.1
Kaio, N.2
Osaki, S.3
-
15
-
-
0017638765
-
Ordering policies with two types of lead times
-
N. Kaio and S. Osaki, 'Ordering policies with two types of lead times', Microelectron. Reliab., 16, 225-229 (1977),.
-
(1977)
Microelectron. Reliab.
, vol.16
, pp. 225-229
-
-
Kaio, N.1
Osaki, S.2
-
16
-
-
0018019976
-
Optimum ordering policies with lead time for an operating unit in preventive maintenance
-
N. Kaio and S. Osaki, 'Optimum ordering policies with lead time for an operating unit in preventive maintenance', IEEE Trans. Reliab., R-27, 270-271 (1978).
-
(1978)
IEEE Trans. Reliab.
, vol.R-27
, pp. 270-271
-
-
Kaio, N.1
Osaki, S.2
-
18
-
-
0017943678
-
Optimum ordering policies with two kinds of lead times and non-linear ordering costs
-
N. Kaio and S. Osaki, 'Optimum ordering policies with two kinds of lead times and non-linear ordering costs', Int. J. Systems Sci., 9, 265-272 (1978).
-
(1978)
Int. J. Systems Sci.
, vol.9
, pp. 265-272
-
-
Kaio, N.1
Osaki, S.2
-
19
-
-
0017962330
-
Optimum planned maintenance with salvage cost'
-
N. Kaio and S. Osaki, 'Optimum planned maintenance with salvage cost', Int. J. Pro. Res., 16, 249-257 (1978).
-
(1978)
Int. J. Pro. Res.
, vol.16
, pp. 249-257
-
-
Kaio, N.1
Osaki, S.2
-
20
-
-
0018046994
-
Optimum inspection-ordering policies with salvage cost
-
N. Kaio and S. Osaki, 'Optimum inspection-ordering policies with salvage cost', Microelectron. Reliab., 18, 253-257 (1978).
-
(1978)
Microelectron. Reliab.
, vol.18
, pp. 253-257
-
-
Kaio, N.1
Osaki, S.2
-
21
-
-
0018476845
-
Extended optimum ordering policies
-
N. Kaio and S. Osaki, 'Extended optimum ordering policies', Electron. Commun. Japan, 62-A, 19-27 (1979).
-
(1979)
Electron. Commun. Japan
, vol.62 A
, pp. 19-27
-
-
Kaio, N.1
Osaki, S.2
-
22
-
-
0018469107
-
Optimum ordering policies with discounting when order costs depend on time
-
N. Kaio and S. Osaki, 'Optimum ordering policies with discounting when order costs depend on time', Int. J. Systems Sci., 10, 539-555 (1979).
-
(1979)
Int. J. Systems Sci.
, vol.10
, pp. 539-555
-
-
Kaio, N.1
Osaki, S.2
-
23
-
-
1542550352
-
Extended optimum ordering policies with discounting
-
N. Kaio and S. Osaki, 'Extended optimum ordering policies with discounting', Int. J. Systems Sci., 11, 149-157 (1980).
-
(1980)
Int. J. Systems Sci.
, vol.11
, pp. 149-157
-
-
Kaio, N.1
Osaki, S.2
-
24
-
-
0019035435
-
Optimum planned maintenance with discounting
-
N. Kaio and S. Osaki, 'Optimum planned maintenance with discounting.', Int. J. Pro. Res., 18, 515-523 (1980).
-
(1980)
Int. J. Pro. Res.
, vol.18
, pp. 515-523
-
-
Kaio, N.1
Osaki, S.2
-
25
-
-
0019554744
-
Optimum planned maintenance policies with lead time
-
N. Kaio and S. Osaki, 'Optimum planned maintenance policies with lead time', IEEE Trans. Reliab. R-30, 79 (1981).
-
(1981)
IEEE Trans. Reliab.
, vol.R-30
, pp. 79
-
-
Kaio, N.1
Osaki, S.2
-
27
-
-
0346490745
-
Optimal ordering policies with two types of randomized lead times
-
N. Kaio and S. Osaki, 'Optimal ordering policies with two types of randomized lead times', Comput. Math. Appl. 19, 43-52 (1990).
-
(1990)
Comput. Math. Appl.
, vol.19
, pp. 43-52
-
-
Kaio, N.1
Osaki, S.2
-
28
-
-
0025592491
-
Optimum ordering policies with non-linear running and salvage costs
-
N. Kaio and S. Osaki, 'Optimum ordering policies with non-linear running and salvage costs', Microelectron. Reliab., 30, 785-793 (1990).
-
(1990)
Microelectron. Reliab.
, vol.30
, pp. 785-793
-
-
Kaio, N.1
Osaki, S.2
-
29
-
-
1542655318
-
Optimal maintenance policies with lead times and repair
-
N. Kaio, T. Dohi and S. Osaki, 'Optimal maintenance policies with lead times and repair', Int. J. Systems Sci., 23, 1299-1308 (1992).
-
(1992)
Int. J. Systems Sci.
, vol.23
, pp. 1299-1308
-
-
Kaio, N.1
Dohi, T.2
Osaki, S.3
-
30
-
-
0019709610
-
Optimum ordering policies with random lead times
-
S. Kalpakam and M. A. Shaul Hameed, 'Optimum ordering policies with random lead times', Microelectron. Reliab., 21, 737-741 (1981).
-
(1981)
Microelectron. Reliab.
, vol.21
, pp. 737-741
-
-
Kalpakam, S.1
Shaul Hameed, M.A.2
-
31
-
-
0017546315
-
Optimal ordering and replacement for a 1-unit system
-
H. Mine and H. Kawai, 'Optimal ordering and replacement for a 1-unit system', IEEE Trans. Reliab., R-26, 273-276 (1977).
-
(1977)
IEEE Trans. Reliab.
, vol.R-26
, pp. 273-276
-
-
Mine, H.1
Kawai, H.2
-
32
-
-
0018031566
-
Optimum ordering policies with lead time for an operating unit
-
T. Nakagawa and S. Osaki, 'Optimum ordering policies with lead time for an operating unit', R.A.I.R.O. Res. Oper. - Oper. Res., 12, 383-393 (1978).
-
(1978)
R.A.I.R.O. Res. Oper. - Oper. Res.
, vol.12
, pp. 383-393
-
-
Nakagawa, T.1
Osaki, S.2
-
33
-
-
0017252561
-
Age replacement with lead time
-
S. Osaki and S. Yamada, 'Age replacement with lead time', IEEE Trans. Reliab. R-25, 344-345 (1976).
-
(1976)
IEEE Trans. Reliab.
, vol.R-25
, pp. 344-345
-
-
Osaki, S.1
Yamada, S.2
-
34
-
-
0019606592
-
A summary of ordering policies
-
S. Osaki, N. Kaio and S. Yamada, 'A summary of ordering policies', IEEE Trans. Reliab., R-30, 272-277 (1981).
-
(1981)
IEEE Trans. Reliab.
, vol.R-30
, pp. 272-277
-
-
Osaki, S.1
Kaio, N.2
Yamada, S.3
-
35
-
-
0022700781
-
Ordering policies under minimal repair
-
K. S. Park and Y. T. Park, 'Ordering policies under minimal repair', IEEE Trans. Reliab., R-35, 82-84 (1986).
-
(1986)
IEEE Trans. Reliab.
, vol.R-35
, pp. 82-84
-
-
Park, K.S.1
Park, Y.T.2
-
36
-
-
0022679932
-
Generalized spare ordering policies with random lead time
-
Y. T. Park and K. S. Park, 'Generalized spare ordering policies with random lead time', Euro. J. Oper. Res., 23, 320-330 (1986).
-
(1986)
Euro. J. Oper. Res.
, vol.23
, pp. 320-330
-
-
Park, Y.T.1
Park, K.S.2
-
37
-
-
0026910493
-
An ordering policy with age-dependent minimal repair and age-dependent random repair costs
-
S. Sheu and C. Liou, 'An ordering policy with age-dependent minimal repair and age-dependent random repair costs', Microelectron. Reliab., 32, 1105-1113 (1992).
-
(1992)
Microelectron. Reliab.
, vol.32
, pp. 1105-1113
-
-
Sheu, S.1
Liou, C.2
-
38
-
-
1542445731
-
Optimum ordering policies with age-dependent minimal repair and two types of lead times
-
S. Sheu and C. Liou, 'Optimum ordering policies with age-dependent minimal repair and two types of lead times', Int. J. Systems Sci., 24, 253-264 (1993).
-
(1993)
Int. J. Systems Sci.
, vol.24
, pp. 253-264
-
-
Sheu, S.1
Liou, C.2
-
39
-
-
0008141282
-
Generalized ordering policies with general random minimal repair costs and random lead times
-
S. Sheu and C. Liou, 'Generalized ordering policies with general random minimal repair costs and random lead times', R.A.I.R.O. Res. Oper. - Oper. Res., 28, 97-118 (1994).
-
(1994)
R.A.I.R.O. Res. Oper. - Oper. Res.
, vol.28
, pp. 97-118
-
-
Sheu, S.1
Liou, C.2
-
40
-
-
0026898373
-
Optimal ordering policies and optimal number of minimal repairs before replacement
-
S. Sheu, C. Liou and B. Tseng, 'Optimal ordering policies and optimal number of minimal repairs before replacement', Microelectron. Reliab., 32, 995-1002 (1992).
-
(1992)
Microelectron. Reliab.
, vol.32
, pp. 995-1002
-
-
Sheu, S.1
Liou, C.2
Tseng, B.3
-
41
-
-
0027641201
-
A note on ordering policies with cost observation and lead times
-
V. Sridharan, 'A note on ordering policies with cost observation and lead times', Int. J. Prd. Econom. 32, 91-97 (1991).
-
(1991)
Int. J. Prd. Econom.
, vol.32
, pp. 91-97
-
-
Sridharan, V.1
-
42
-
-
0024874807
-
Optimum ordering policies with random lead times and salvage cost
-
R. Subramanian and V. Sridharan, 'Optimum ordering policies with random lead times and salvage cost', Microelectron. Reliab., 29, 523-527 (1989).
-
(1989)
Microelectron. Reliab.
, vol.29
, pp. 523-527
-
-
Subramanian, R.1
Sridharan, V.2
-
43
-
-
0022441552
-
Optimum ordering policies for an equipment with a sensing device
-
C. S. Sung and Y. K. Park, 'Optimum ordering policies for an equipment with a sensing device', Microelectron. Reliab., 26, 87-98 (1986).
-
(1986)
Microelectron. Reliab.
, vol.26
, pp. 87-98
-
-
Sung, C.S.1
Park, Y.K.2
-
44
-
-
0345859933
-
Optimum ordering policy under random lead time for equipment with sensor
-
C. S. Sung and C. H. Kim, 'Optimum ordering policy under random lead time for equipment with sensor', IEEE Trans. Reliab., R-36, 467-469 (1987).
-
(1987)
IEEE Trans. Reliab.
, vol.R-36
, pp. 467-469
-
-
Sung, C.S.1
Kim, C.H.2
-
45
-
-
0018032458
-
An optimal ordering policy for a spare unit with lead time
-
L. C. Thomas and S. Osaki, 'An optimal ordering policy for a spare unit with lead time', Euro. J. Oper. Res., 2, 409-419 (1978).
-
(1978)
Euro. J. Oper. Res.
, vol.2
, pp. 409-419
-
-
Thomas, L.C.1
Osaki, S.2
-
46
-
-
0008143392
-
A note on ordering policy
-
L. C. Thomas and S. Osaki, 'A note on ordering policy', IEEE Trans. Reliab., R-27, 380-381 (1978).
-
(1978)
IEEE Trans. Reliab.
, vol.R-27
, pp. 380-381
-
-
Thomas, L.C.1
Osaki, S.2
-
47
-
-
0018737824
-
Discrete-time ordering policies
-
N. Kaio and S. Osaki, 'Discrete-time ordering policies', IEEE Trans. Reliab., R-28, 405-406 (1979).
-
(1979)
IEEE Trans. Reliab.
, vol.R-28
, pp. 405-406
-
-
Kaio, N.1
Osaki, S.2
-
50
-
-
1542655317
-
An optimal ordering and replacement policy of a Markovian degradation system under incomplete observation: Part II
-
H. Kawai, 'An optimal ordering and replacement policy of a Markovian degradation system under incomplete observation: part II', J. Oper. Res. Soc. Japan, 26, 293-308 (1983).
-
(1983)
J. Oper. Res. Soc. Japan
, vol.26
, pp. 293-308
-
-
Kawai, H.1
-
51
-
-
0037823579
-
An optimal ordering and replacement policy of a Markovian degradation system under complete observation: Part I
-
H. Kawai, 'An optimal ordering and replacement policy of a Markovian degradation system under complete observation: part I', J. Oper. Res. Soc. Japan, 26, 279-292 (1983).
-
(1983)
J. Oper. Res. Soc. Japan
, vol.26
, pp. 279-292
-
-
Kawai, H.1
-
52
-
-
84974875101
-
Refined asymptotic costs for renewal reward processes
-
A. H. Christer, 'Refined asymptotic costs for renewal reward processes', J. Oper. Res. Soc., 29, 577-588 (1978).
-
(1978)
J. Oper. Res. Soc.
, vol.29
, pp. 577-588
-
-
Christer, A.H.1
-
53
-
-
0000124989
-
A marginal cost analysis for preventive replacement policies
-
M. Berg, 'A marginal cost analysis for preventive replacement policies', Euro. J. Oper. Res., 4, 136-142 (1980).
-
(1980)
Euro. J. Oper. Res.
, vol.4
, pp. 136-142
-
-
Berg, M.1
-
54
-
-
0347751436
-
Monitored replenishment rules for a continuous review cyclic inventory system
-
T. Dohi, N. Kaio and S. Osaki, 'Monitored replenishment rules for a continuous review cyclic inventory system', IMA J. Math. Appl. Bus. Ind., 6, 223-237 (1995).
-
(1995)
IMA J. Math. Appl. Bus. Ind.
, vol.6
, pp. 223-237
-
-
Dohi, T.1
Kaio, N.2
Osaki, S.3
-
55
-
-
0042023658
-
Continuous review cyclic inventory models with emergency order
-
T. Dohi, N. Kaio and S. Osaki, 'Continuous review cyclic inventory models with emergency order', J. Oper. Res. Soc. Japan, 38, 212-229 (1995).
-
(1995)
J. Oper. Res. Soc. Japan
, vol.38
, pp. 212-229
-
-
Dohi, T.1
Kaio, N.2
Osaki, S.3
-
56
-
-
1542760541
-
Spare parts inventory control policies under cost effectiveness criterion
-
T. Dohi, N. Kaio and S. Osaki, 'Spare parts inventory control policies under cost effectiveness criterion', Proc. 14th Int. Conf. Production Research, 1997, pp. 1036-1039.
-
(1997)
Proc. 14th Int. Conf. Production Research
, pp. 1036-1039
-
-
Dohi, T.1
Kaio, N.2
Osaki, S.3
-
57
-
-
0031272896
-
Models for 1-out-of-Q systems with stochastic lead times and expedited ordering options for spares inventory
-
T. Dohi, T. Shibuya and S. Osaki, 'Models for 1-out-of-Q systems with stochastic lead times and expedited ordering options for spares inventory', Eur. J. Opel. Res., 103, 255-272 (1997).
-
(1997)
Eur. J. Opel. Res.
, vol.103
, pp. 255-272
-
-
Dohi, T.1
Shibuya, T.2
Osaki, S.3
|