메뉴 건너뛰기




Volumn 3, Issue 4, 1998, Pages 180-185

Field-level management's perspective of design/build

Author keywords

[No Author keywords available]

Indexed keywords

PROJECT MANAGEMENT; STRUCTURAL DESIGN;

EID: 0032207302     PISSN: 10840680     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)1084-0680(1998)3:4(180)     Document Type: Article
Times cited : (5)

References (10)
  • 2
    • 0342565645 scopus 로고    scopus 로고
    • Design/build continues to grow in U.S.
    • ASCE, Reston, Va., Dec.
    • "Design/build continues to grow in U.S." (1996). Civ. Engrg., ASCE, Reston, Va., Dec., 18-9.
    • (1996) Civ. Engrg. , pp. 18-19
  • 3
    • 11644251935 scopus 로고    scopus 로고
    • Des./Build Inst. of Am., Washington, D.C.
    • Design/build manual of practice. (1996). Des./Build Inst. of Am., Washington, D.C.
    • (1996) Design/build Manual of Practice
  • 7
    • 24944578131 scopus 로고    scopus 로고
    • Project delivery systems: CM at risk, design/build, design-bid-build
    • Constr. Industry Inst. Des./Build Res. Team, Univ. of Texas at Austin
    • "Project delivery systems: CM at risk, design/build, design-bid-build." (1997). Res. Summary 133-1. Constr. Industry Inst. Des./Build Res. Team, Univ. of Texas at Austin.
    • (1997) Res. Summary 133-1
  • 9
    • 0343871370 scopus 로고
    • Delivering public works projects - Different approaches
    • March
    • Smith, D. G. (1994). "Delivering public works projects - Different approaches." Public Works, March, 61-62, 95.
    • (1994) Public Works , pp. 61-62
    • Smith, D.G.1
  • 10
    • 0348208752 scopus 로고    scopus 로고
    • Design/build: Will it be the delivery method of choice for the 21st century?
    • Upper Darby, Pa.
    • Williams, C. J. (1997). "Design/build: Will it be the delivery method of choice for the 21st century?" Proc., Proj. Mgmt. Inst. Symp., Upper Darby, Pa.
    • (1997) Proc., Proj. Mgmt. Inst. Symp.
    • Williams, C.J.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.